725-6MW-0319- Install Sentinel Wells
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Marathon Petroleum Company plans to install two sentinel wells, CW-14-B3 and CW-14-B4, at the southwest corner of the cloverleaf area along Interstate 710 at Post Mile 18.36 within Caltrans right-of-way in South Gate, California. These wells will be positioned as a two-well cluster with 20-foot screens deployed at distinct depths within the Gage Aquifer, with CW-14-B3 accessing the upper portion and CW-14-B4 the lower portion to monitor groundwater conditions. The project requires a temporary encroachment permit to facilitate construction and associated traffic control measures within the highway right-of-way, with no relocation of public utilities or acquisition of additional right-of-way. Excavation for the wells will be limited to a maximum depth of 3360 inches, a width of 12 inches, and a length of one linear foot. Following installation, the wells will be sampled twice annually for five years to ensure ongoing environmental monitoring, and all work will be conducted under the oversight of Caltrans District 7.
General Info
Agency
Place of Performance
South Gate, CASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
