725-6MW-0319- Install Sentinel Wells

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Marathon Petroleum Company plans to install two sentinel wells, CW-14-B3 and CW-14-B4, at the southwest corner of the cloverleaf area along Interstate 710 at Post Mile 18.36 within Caltrans right-of-way in South Gate, California. These wells will be positioned as a two-well cluster with 20-foot screens deployed at distinct depths within the Gage Aquifer, with CW-14-B3 accessing the upper portion and CW-14-B4 the lower portion to monitor groundwater conditions. The project requires a temporary encroachment permit to facilitate construction and associated traffic control measures within the highway right-of-way, with no relocation of public utilities or acquisition of additional right-of-way. Excavation for the wells will be limited to a maximum depth of 3360 inches, a width of 12 inches, and a length of one linear foot. Following installation, the wells will be sampled twice annually for five years to ensure ongoing environmental monitoring, and all work will be conducted under the oversight of Caltrans District 7.

General Info

Marathon Petroleum installs two sentinel wells in Caltrans right-of-way for groundwater monitoring, with biannual sampling for five years.

Agency

California → Caltrans, District 7 - Los Angeles

Place of Performance

South Gate, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts3 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Susan KooSenior Environmental Scientist
Susan KooSenior Environmental Scientist
Chad RoperProject Manager

Full Description

Show more
Marathon Petroleum Company proposes the installation of two (2) sentinel wells CW-14- B3 and CW-14-B4 at the southwest corner of the clover leaf area located within Caltrans right-of-way along Interstate (I-)710 at Post Mile (PM) 18.36, as well as to perform traffic control activities in the City of South Gate, Los Angeles County. The proposed work will entail the installation of the proposed wells as a two-well cluster with 20-foot screens installed at separate depths within the gage Aquifer. Well CW-14-B3 will be installed at the upper portion of the Gage Aquifer and CW-14-B4 will be installed at the lower portion of the Gage Aquifer system. Marathon Petroleum Company is requesting a temporary encroachment permit to access Caltrans right-of-way along I- 710 at PM 18.36 to complete the above-mentioned work and to perform associated temporary traffic control activities. In addition, the wells will need to be accessed for sampling twice a year for a period of five (5) years following well construction. Excavation will have a maximum depth of 3360-inches, a maximum width of 12-inches and a maximum length of one (1) linear foot. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO
Solicitation # W51DQV26RA002
Solicitation W51DQV26RA002 is a full and open competition for a firm-fixed-price design-bid-build construction contract for the Rio de la Plata Flood Control Project, Supplemental Contract 1, located in Dorado and Toa Baja, Puerto Rico. Managed by the U.S. Army Corps of Engineers under NAICS code 237990, the project has an estimated magnitude between 250 million and 350 million dollars. The scope of work involves extensive river channel widening and modifications across approximately 1.6 miles, the construction of 3.1 miles of earthen levees, and the installation of four concrete culverts with pre-cast pipes and composite flap gates. Additional requirements include the relocation of water, sewer, and electrical utilities, scour protection, demolition of abandoned structures, and wetland mitigation. The estimated period of performance is 1619 calendar days following the receipt of the Notice to Proceed, though offerors are cautioned that all real estate rights for site access have not yet been obtained and will be secured prior to the full notice. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal. Awardees are required to provide payment and performance bonds equal to the total bid price within 10 days of award, and firms other than small businesses must submit a subcontracting plan per FAR Part 19. The project also requires the delivery of an operations and maintenance manual detailing procedures for restoring levee geometry after seismic events.
W2SR Endist Caribbean(provis)

POSTED

about 13 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS