725-6RS-2367- Sidewalk/Driveway Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans, District 7 - Los Angeles, has approved an encroachment permit for West Coast Revivals LLC to undertake sidewalk and driveway modifications in Culver City, California. The work includes sawcutting and removing 20 linear feet of curb at the flowline while preserving the gutter, followed by reconstructing a Type A1 curb. Eight linear feet of existing sidewalk will be removed and replaced with a new sidewalk featuring a 1% crossfall and a maximum longitudinal slope of 1 inch to 12 inches to ensure seamless integration with the driveway ramp. An additional 20 linear feet of sidewalk will be removed and reconstructed to facilitate the new driveway ramp layout, also with a 1% crossfall. The private driveway will have 12 feet of its surface removed and repoured to align with the revised grade of the new walkway, and an excess private curb will be excavated and repoured at a lower elevation to safeguard the newly lowered public sidewalk. All excavation work is limited to a maximum depth of 8 inches, an average width of 5 feet, and a maximum length of 36 feet. No public utilities will be relocated and no additional right-of-way will be acquired for this project.

General Info

West Coast Revivals LLC to modify curb, sidewalk, and driveway in Culver City with grade adjustments and no utility changes.

Agency

California → Caltrans, District 7 - Los Angeles

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Culver City, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Mojgan AbbassiSenior Environmental Scientist

Full Description

Show more
Caltrans approves of the encroachment permit that the West Coast Revivals LLC. to sawcut and remove 20 linear feet of curb at the flowline and leave the gutter undamaged. Reconstruct type A1 curb. Sawcut and remove eight linear feet of sidewalk to replace with a new sidewalk with 1% crossfall and 1-inch to 12-inch longitudinal maximum slope to join the driveway ramp. Sawcut and remove 20 linear feet of sidewalk to reconstruct the driveway ramp with 1% crossfall. Sawcut and remove 12 feet of private driveway, repour to meet the new back walk grade. Sawcut and remove the extra private curb and repour at a lower position to protect the new, lower public sidewalk. Excavation will have a maximum depth of 8 inches, an average width of 5 feet, and a maximum length of 36 feet. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details