Caltrans District 7 has approved an encroachment permit to Edison for the replacement of a single damaged vault lid and its associated hardware at postmile 0.94 on State Route 107 in Torrance, California. The work will occur within the state right-of-way and involves excavation with a maximum depth of 18 inches, with no relocation of public utilities or acquisition of additional right-of-way. Temporary traffic control measures will be implemented as needed to ensure safety during the project. The permit is part of routine maintenance to address infrastructure damage without expanding the scope of work beyond the existing facility. The project is formally identified as the Vault Lid Replacement Project, with Mojgan Abbassi, Senior Environmental Scientist at Caltrans, listed as the primary point of contact for inquiries and coordination.

General Info

Edison to replace damaged vault lid at SR-107 postmile 0.94 with 18-inch excavation, no utility relocation.

Agency

California → Caltrans, District 7 - Los Angeles

Place of Performance

Torrance, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Mojgan AbbassiSenior Environmental Scientist

Full Description

Show more
Caltrans approves the encroachment permit for Edison to replace 1 damaged vault lid and hardware at the same location and to perform associated temporary traffic control activities on Hawthorne Blvd at postmile (PM) 0.94 on State Route (SR) 107 in the City of Torrance, County of Los Angeles. Excavation will have a maximum depth of 18 inches within the Caltrans right-of-way. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and utility construction services, including underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, shoring, subsurface investigation, and site clearing. Additional requirements include surface improvements like asphalt paving, traffic signals, and landscaping, along with environmental support services such as storm water pollution prevention (SWPPP) and quality control. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must hold a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Certified DBE, MBE, WBE, or OBE firms must provide certification from an approved agency prior to the bid opening. Quotes will be considered from bidders who can maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
803_2027 PLANT MIX - PRIMARY
Solicitation # CM827PMA129935
The Virginia Department of Transportation (VDOT) is soliciting bids for contract CM827PMA129935, titled 2027 Plant Mix - Primary, which involves the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) and Balanced Mix Design (BMD) surface asphalt concrete across various locations, specifically including Route 42. The scope of work includes the application of tack coat, sinusoidal asphalt rumble strips, and pavement markings, as well as flexible pavement planing. Contractors must be prequalified to bid and are required to submit a Job Mix Formula (JMF) for approval at least two weeks prior to production. Key technical requirements include meeting Performance + Volumetric Optimized criteria for specific mix types and ensuring a minimum film thickness of 9 microns. The contract is subject to several federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Build America, Buy America Act (BABA). Contractors must comply with non-discrimination and equal opportunity provisions and are encouraged to partner with Small, Women-owned, and Minority-owned (SWaM) businesses. Administrative requirements include the use of a VDOT-approved inventory tracking system and the submission of performance test results via the PLAID website within 48 hours of sampling. Payment is structured through monthly progress estimates based on the contractor's name, with interest accruing at one percent per month. Liquidated damages for violations of the Contract Work Hours and Safety Standards Act are set at $33 as of January 15, 2025.
Virginia Department of Transportation

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS