725-6US-2559- Replace Pole and Install Verizon Equipment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Caltrans District 7 in Los Angeles has approved an encroachment permit for Verizon Wireless to install antennas and associated telecommunications equipment along State Route 1 at postmile 40.06, along with the replacement of an existing pole. The project involves excavation with a maximum depth of 78 inches, an average width of 14 inches, and a maximum length of 14 feet, all within the existing right-of-way without requiring any new land acquisition or utility relocations. No additional public utilities will be moved, and the work is confined to the current infrastructure footprint. The permit is part of broader efforts to enhance telecom network capacity in the area, and all activities are subject to Caltrans oversight to ensure compliance with state transportation and environmental standards. The project is managed by Senior Environmental Scientist Mojgan Abbassi, who serves as the primary point of contact for inquiries and coordination.
General Info
Agency
NAICS
Place of Performance
Los Angeles, CASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
