Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

726-6US-0662- Water Flow Detection Assembly Installation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 7 has approved an encroachment permit allowing the San Gabriel Valley Water Company to install infrastructure including a 1-4 inch Double Detector Check Assembly, a 1-4 inch domestic service line with meter and vault, and implement temporary traffic control measures along State Route 72 at postmile 6.6 in Whittier, Los Angeles County. The work will involve excavation with a maximum depth of 36 inches, an average width of 18 inches, and a maximum length of 2 feet, all conducted within the existing right-of-way without requiring any relocation of public utilities or acquisition of additional land. The project is identified under the title “726-6US-0662 - Water Flow Detection Assembly Installation Project” and was posted as a forecast on April 17, 2026, with Mojgan Abbassi, Senior Environmental Scientist, designated as the primary point of contact for inquiries.

General Info

San Gabriel Valley Water Company to install water detection assembly and service line along SR-72 in Whittier under Caltrans permit.

Agency

California → Caltrans, District 7 - Los Angeles

Place of Performance

Whittier, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Mojgan AbbassiSenior Environmental Scientist

Full Description

Show more
Caltrans approves of the encroachment permit for San Gabriel Valley Water Company to install a 1-4-inch Double Detector Check Assembly (DDCA),1-4-inch Domestic Service with meter and vault, as well as perform temporary traffic control activities on State Route (SR) 72, at postmile (PM) 6.6 in the City of Whittier, County of Los Angeles. Excavation will have a maximum depth of 36 inches, an average width of 18 inches, and a maximum length of 2 feet. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. has issued an Invitation to Bid for the Alvarado Trunk Sewer Phase IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This solicitation seeks quotes from subcontractors and suppliers for various scopes of work, including aggregate supply, paving, electrical, and pipe supply. The project is funded through CASRF and EPA resources and is designated as a Women-Owned Small Business (WOSB) and Disadvantaged Business Enterprise (DBE) set-aside. All bids must remain valid for 120 days from the submission deadline, which is October 28, 2026, at 2:00 PM. Quotes must be submitted via email to socalbids@fdcorp.com or via fax to (858) 271-1330. Prospective bidders must adhere to several strict regulatory and administrative requirements. The project is subject to a Project Labor Agreement (PLA), and all subcontractors are required to possess a valid California contractor's license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section 1725.5. Flatiron Dragados Constructors, Inc. reserves the right to require payment and performance bonds equal to 100% of the contract value, with bond premium reimbursements capped at 3% of the contract value. All bonds must be issued by a surety authorized to conduct business in the State of California. For inquiries, the primary point of contact is Veronica Garcia, Lead Estimating Admin.
Flatiron Dragados Constructors, Inc.

POSTED

about 23 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch ductile iron pipe water mains, including gate valves, fittings, water services, and fire hydrant assemblies, as well as the abandonment of existing water mains on Walnut Street, Ebony Lane, and 247th Place. W.A. Rasic Construction Company, Inc., acting as the prime contractor, is soliciting subcontractor quotations for various trades to support this infrastructure work. Required services include waterworks, hot taps, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, trucking, and soil and material testing. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations in accordance with Section 1725.5 of the Public Contract Code. Selected firms will be required to execute the prime contractor's standard subcontract agreement and meet general insurance requirements. W.A. Rasic Construction Company reserves the right to require payment and performance bonds totaling 100% of the subcontractor's bid, with bond premiums reimbursable up to 1.5%. The solicitation specifically encourages participation from DBE, MBE, WBE, and SBE firms, including the formation of consortia for larger contract portions. All quotations must be submitted to Matt Metoyer by the deadline of October 19, 2026, at 1:00 PM.
W.A. Rasic Construction Company

POSTED

about 23 hours ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS