7289 South End Branch Library

Closed
BD-26-1142-PFD01-PFD01-130224State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming lighting controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to correct HVAC and plumbing deficiencies. The project also encompasses the installation of new signage and ensures all work complies with ADA accessibility guidelines. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeframe of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The contractor is required to provide performance and payment bonds equal to 100 percent of the contract price and must adhere to specific prevailing wage rates for the Georgia region. Quality control is strictly managed through a required Construction QC Plan, with a multi-stage inspection process including punch-out, pre-final, and final acceptance inspections. Proposals must be submitted electronically to the contracting officer by November 9, 2026.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, located at MCB Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project encompasses site improvements such as paving removal and replacement, drainage upgrades, water, sanitary, and storm system repairs, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price, evaluated by combining the costs for building renovation and paving replacement. Bidders must adhere to Davis-Bacon Act wage determinations and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Contractors must submit a Quality Control Plan for approval prior to construction and utilize a three-phase control process for each Definable Feature of Work. Invoicing is managed through Wide Area Work Flow with specific NAVFAC form requirements.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 27, 2026, with a response deadline of November 4, 2026. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if they fail to include proof of GFE #2, requiring solicitations to be posted in an online publication for 30 consecutive calendar days and in a print newspaper for one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) per GFE #5 must be submitted with the bid package. Documentation for outreach efforts under GFE #1 may be submitted up to three business days after the bid closing. Prime contractors are further required to flow down these GFE requirements to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves comprehensive architectural repairs, including the replacement of drywall, painting, ceiling tiles, flooring, and rubber wall bases, as well as electrical and plumbing restoration to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and adherence to Davis-Bacon Act wage determinations. Contractors must provide a one-year workmanship guarantee and a 20-year product warranty for Luxury Vinyl Plank flooring.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The project involves the demolition of the existing South End Branch Library in Boston, Massachusetts, with the exception of the basement retaining walls, which will be infilled with structural fill. A new, fully electric, two-story library will be constructed on the same site as a ground-up facility, featuring reading areas, multiple meeting spaces of varying capacities, staff work areas, and supporting functional spaces. Site improvements include adjustments to the adjacent park, replacement of landscape elements, and the installation of updated hardscape paver zones. The estimated contract value is $24.34 million, with an anticipated construction period from March 24, 2027, to March 24, 2029. The solicitation, identified as BD-26-1142-PFD01-PFD01-130224, follows a two-phase process: Phase I requires submission of a Statement of Qualifications (SOQ) including a DCAMM Certificate, a DCAMM Update Statement, and a Commitment Letter, and Phase II invites prequalified contractors to submit sealed bids. Proposals must be submitted electronically via Trimble Unity Construct or in person at the PFD Bid Counter with one printed copy and two flash drives. The deadline for responses is July 21, 2026, and the project is subject to compliance with Massachusetts General Laws Chapter 149, Sections 44D 1/2 and 44D 3/4. No federal acquisition regulation clauses are listed, and the procurement does not reference socioeconomic set-asides, UEI/CAGE codes, or formal CLINs. Final award is expected to be based on the Lowest Price Technically Acceptable method following successful prequalification, with inspections and acceptance taking place at the construction site in Boston's South End neighborhood. Contract administration inquiries should be directed to the Public Facilities Department, and payment and invoicing procedures are unspecified.

General Info

Demolish South End Library, build new electric two-story facility, $24.34M, construction 2027–2029, LPTA award.

Documents

6

BD-26-1142-PFD01-PFD01-130224: 7289 South End Branch Library

HTML, High priority: read this first5 pages · rfb
High

BD-26-1142-PFD01-PFD01-130224: 7289 South End Branch Library

HTML, High priority: read this first5 pages · ifb
High

BD-26-1142-PFD01-PFD01-130224: 7289 South End Branch Library

HTML, High priority: read this first5 pages · rfb
High

BD-26-1142-PFD01-PFD01-130224: 7289 South End Branch Library

HTML, High priority: read this first5 pages · ifb
High

BD-26-1142-PFD01-PFD01-130224 Bid Solicitation

HTML, High priority: read this first5 pages · ifb
High

PFD South End Branch Library Study RFQ Project 7289

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → PFD01 - Public Facilities Department
Contacts1 person available
OfficeFloor Boston, MA, 02108, USA
Office AddressFloor Boston, MA, 02108, USA
Contacts
BID COUNTERPurchaser

Full Description

Show more
Scope detailed in specs consists of demolishing existing S.E. library & build new library. Work consists of following major work, comprised of ground up, fully electric 2 story building. Spaces include reading areas, meeting spaces of various capacities, staff work areas & supporting spaces. Existing building demolished, except for basement retaining walls will be infilled with structural fill, adjustments to adjacent park, replacement of landscape elements & updated hardscape paver zones.

More opportunities from Massachusetts → PFD01 - Public Facilities Department

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS