Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Tennessee was posted on May 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

750 KVA Three Phase 60 Hertz, Onan, Subway-Type Network Transformers

Closed
Z4381State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Six 750 kVA three-phase 60 Hz ONAN subway-type network transformers are being procured by Nashville Electric Service under solicitation Z4381 with a submission deadline of May 11, 2026. Each transformer must have a high-voltage rating of 13,750 volts delta with four taps—two at +2.5% and two at -2.5% of rated voltage—and a low-voltage output of 277/480 volts without taps. The units must include a three-position high-voltage disconnect and ground switch in a single compartment, an exception to NES Specification ET-258-12 Section 5.3. All equipment must comply with the latest version of NES ET-258-12 and meet or exceed the U.S. Department of Energy’s 2016 minimum efficiency standards. Only transformers manufactured by Pioneer, Genelec, ABB, or Auto Car are acceptable, and no alternate brands may be submitted. Each transformer must be equipped with a permanent Uticom ID tag on the primary bushing, marked with the stock number, serial number, manufacturer, and impedance percentage using indelible ink, and the nameplate must clearly identify the type of insulating oil used. Actual excitation and total loss data from the manufacturer must be provided with or prior to shipment; estimated values are not acceptable. Bids must be submitted electronically via the NES Vendor Web Portal by 2:00 PM local time on the deadline date, and delivery is required to Nashville, Tennessee, at 1214 Church St., 37246. Inspection and acceptance will occur at the place of performance, and any non-compliant units will be rejected. The solicitation is structured as a competitive fixed-price procurement, with technical compliance and loss data accuracy as critical evaluation factors, suggesting an LPTA methodology. No federal contract clauses are referenced, no socioeconomic or size certifications are required, and pricing details are not provided as they are to be submitted by vendors.

General Info

Supply of 750 KVA subway transformers with specific voltage taps, disconnects, and NES compliance.

Documents

1

Z4381 Request For Bid for 750 KVA Network Transformers

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 9, 2026 to May 11, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTennessee → Nashville Electric Service
Contacts1 person available
OfficeNashville, TN, USA
Office AddressNashville, TN, USA
Contacts
Jay ThompsonProcurement Contact

Full Description

Show more
KVA THREE PHASE, 60 HERTZ, ONAN, SUBWAY-TYPE, NETWORK TRANSFORMERS. HIGH VOLTAGE 13,750 VOLTS DELTA WITH (2) 2.5%FULL CAPACITY TAPS ABOVE RATED VOLTAGE AND (2) 2.5% FULL CAPACITY TAPS BELOW RATED VOLTAGE, LOW VOLTAGE 277/480 VOLTS NO TAPS. TRANSFORMERS ARE TO BE FURNISHED WITH HIGH VOLTAGETHREE POSITION DISCONNECT AND GROUND SWITCHES. ALL TO BE IN ACCORDANCE WITH LATEST VERSION OF NES SPECIFICATION ET-258-12. EXCEPTION TO ET-258-12 SECTION 5.3: ONLY SINGLE COMPARTMENT WILL BE ACCEPTED FOR THE PRIMARY DISCONNECT AND GROUNDING SWITCH. ACTUAL LOSS DATA (EXCITATION LOSS AND TOTAL LOSS) SHALL BE FURNISHED BY THE MANUFACTURER PRIOR TO OR WITH THE SHIPMENT OF TRANSFORMER(S). Approved Manufacturers and/or Part Numbers: PIONEER. GENELEC. ABBAUTO. CARTEIN.

More opportunities from Tennessee → Nashville Electric Service

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS