This Solicitation opportunity from Michigan was posted on March 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 751/24228.SAA Traverse City Solar Array Site Diagram: Site diagram and technical specification for the DNR Finance & Operations Traverse City Solar Array rooftop location on the Main Building, including a request for a deduct alternate.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for DTMB 751/24228.SAA - DNR Solar Arrays Design Build: Design Build Project Advertisement (DTMB File No. 751/24228.SAA) for the State of Michigan. The project seeks a Design Build Entity (DBE) to study, design, and construct solar arrays at five DNR locations (Cadillac, Traverse City, Gaylord, and Escanaba). Includes mandatory pre-proposal meetings on April 14-15, 2025, with bids due by April 30, 2025, at 2:00 p.m. Eastern time. Requirements include structural analysis, utility coordination, and adherence to state/local codes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Escanaba Solar Arrays Site Diagram: Site diagram and technical notes for the DNR Finance & Operations Escanaba Solar Arrays project, targeting 31 kw with potential roof or ground mount options.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for File No. 751/24228 - Solar Arrays Various Locations: Design Build contract solicitation from the State of Michigan Department of Technology, Management and Budget for the design and construction of solar arrays at five locations for the Department of Natural Resources. The document includes a bid summary, bid schedule, and submission instructions with a bid date of April 30, 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Gaylord Solar Array Site Diagram: Technical site diagram and target specifications for the DNR Finance & Operations Gaylord Solar Array, detailing two array locations on the Repair Center Roof (32kw) and Customer Service Center Roof (16kw).
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Michigan Prevailing Wages Informational Sheet Feb 2024: This informational sheet from the State of Michigan Wage and Hour Division, effective February 13, 2024, outlines the prevailing wage requirements for construction projects funded or supported by the state. It explains the purpose of prevailing rates, which are minimum pay rates derived from collectively bargained agreements, and details responsibilities of the state, DTMB, contractors, and subcontractors regarding wage postings, record keeping, and compliance. The document also covers enforcement procedures and penalties under Act 10 of 2023, emphasizing the importance of paying wages plus fringe benefits at or above the prevailing rate and maintaining proper documentation for inspection.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for ORS-002241 Prevailing Wage Rates - Wexford County (Solar Arrays): Official Rate Schedule (ORS-002241) issued on 03/25/2025 for state-funded projects in Wexford County, specifically for the Cadillac Solar Arrays project (751/24228.SAA). The document specifies prevailing hourly wage rates, fringe benefits, and overtime provisions for various labor classifications, including Boilermakers, Bricklayers, and Carpenters, with a contract award-by date of 06/23/2025.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for ORS-002243 - Escanaba Solar Arrays Prevailing Wage Rates: Official Prevailing Wage Rate Schedule (ORS-002243) issued on 03/25/2025 for the Escanaba Solar Arrays project (Project No. 751/24228.SAA) in Delta County. The document specifies hourly wage rates, apprentice scales, and overtime provisions for various classifications including Boilermakers, Bricklayers, and Carpenters. It is issued by the DTMB Design & Construction Division.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for ORS-002244 Prevailing Wage Rates - Otsego County Solar Arrays: Official Rate Schedule (ORS-002244) issued on 03/25/2025 for state-funded solar array projects in Otsego County, managed by the DTMB Design & Construction Division. The document specifies prevailing hourly wage rates, apprentice scales, and overtime provisions for various classifications including Boilermakers, Bricklayers, and Carpenters.
PDF
PDF, Low priority1 page · specifications
LowAI Summary for Cadillac Solar Array Site Diagram: A site diagram or technical note regarding the Cadillac Solar Array, referencing a target of 110% 32 kw annually under DNR Finance & Operations.
PDF
PDF, Low priorityother
LowAI Summary for Cherryland Electric Cooperative - Dept of Natural Resource/TC Bills: The document consists of multiple utility billing statements from Cherryland Electric Cooperative for the Department of Natural Resources/TC, covering various accounts and billing dates in August and September 2024. It includes payment stubs, usage comparisons, and charge details.
PDF
PDF, Low priorityother
LowAI Summary for Cherryland Electric Cooperative - Dept of Natural Resource/TC Bills: The document consists of multiple utility billing statements from Cherryland Electric Cooperative for the Department of Natural Resources (DNR) in Traverse City, MI. It includes invoices for various accounts (e.g., 4850101, 8890105, 8890202) with due dates in February and March 2025.
PDF
PDF, Low priorityinvoice
LowAI Summary for Consumers Energy Invoice - Account 100032117317: Utility invoice from Consumers Energy for account 100032117317 located at 8015 Mackinaw Trl, Cadillac, MI. The document includes billing details for the period 2025/01/10 - 2025/02/09, with invoice number 100032117317250211 dated 2025/02/10.
PDF
PDF, Low priorityother
LowAI Summary for Consumers Energy Invoices - Account 100032117317: The document consists of multiple utility invoices from Consumers Energy for the account located at 8015 Mackinaw Trl, Cadillac, MI. It includes billing details for periods in June, July, and August 2024, detailing energy usage (kWh), capacity charges, and total amounts due.
PDF
PDF, Low priorityother
LowAI Summary for Esc. Dist. Offic Bldg. and Maintenance Garages: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for Great Lakes Energy - Account 605537001 (Dept of Natural Resr): Utility billing statements from Great Lakes Energy Cooperative for the Department of Natural Resources (Gaylord Repair Shop). The document contains billing details for two periods: 12/11/2024 - 01/11/2025 and 01/11/2025 - 02/11/2025, including usage data, balance summaries, and payment instructions.
PDF
PDF, Low priorityother
LowAI Summary for Great Lakes Energy - Dept of Natural Resr Account 605537001: Utility billing statements from Great Lakes Energy for the Department of Natural Resources (Gaylord Repair Shop) covering billing periods from March 13, 2024, to May 12, 2024. The document contains account balances, energy usage (kWh), and payment details.
PDF
PDF, Low priorityother
LowAI Summary for Great Lakes Energy - Gaylord Repair Shop Utility Bills: Utility billing statements from Great Lakes Energy for the Department of Natural Resources (Gaylord Repair Shop) covering billing periods from March 13, 2024, to May 12, 2024. The documents include account balances, energy usage (kWh), and payment details.
PDF
PDF, Low priorityother
LowAI Summary for Great Lakes Energy - Gaylord Repair Shop Utility Bills: Utility billing statements from Great Lakes Energy Cooperative for the Department of Natural Resources Gaylord Repair Shop. The document contains billing details for two periods: 12/11/2024 - 01/11/2025 (Amount Due: $622.51) and 01/11/2025 - 02/11/2025 (Amount Due: $680.25), including energy usage and account activity.
PDF
PDF, Low priorityinformational-sheet
LowAI Summary for PW Informational Pages Part 1 - Prevailing Wage and Overtime Guidance: This document provides general information regarding fringe benefits applicable to prevailing wage rates, including examples of allowable and non-creditable benefits. It explains how hourly credits for fringe benefits are calculated and lists examples such as vacation, insurance premiums, and bonuses. The document also details overtime provisions for Michigan prevailing wage rate commercial schedules, describing the nine-character overtime code and its interpretation for different days and hours worked. Additionally, it includes classifications of equipment for underground and hazardous waste abatement engineers, specifying various machinery and operator roles. The document serves as an informational guide on wage and labor standards for state projects.
ANE-1256-02 BNACTS - UIS COMM BDF RCAG Tower InstallationOpen now, due in 23 days
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJOpen now, due in 69 days