Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

800 West Cliff Drive Roadway Realignment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 800 West Cliff Drive Roadway Realignment Project, managed by the City of Santa Cruz Public Works Department, is a presolicitation effort to address critical infrastructure instability caused by high wave and storm events in late 2023 and early 2024. The project aims to protect the roadway and a multiuse pathway from an eroded scarp that has encroached within 21 feet of the existing road. The primary scope of work involves shifting a 600-foot section of the roadway approximately 60 feet inland to move it out of the 100-year erosion zone, while shifting the adjacent multiuse pathway approximately 30 feet inland. This realignment requires right-of-way acquisition from State Parks and includes additional deliverables such as stormwater drainage and utility improvements, minor parking lot upgrades, the installation of new signage, fencing, and benches, and the removal of old asphalt followed by site restoration. The project is located at 800 West Cliff Drive in Santa Cruz, California, specifically within the southern portion of Lighthouse Field State Beach. Environmental reviews, including a Mitigated Negative Declaration approved on August 20, 2026, determined that there are no significant environmental effects requiring an Environmental Impact Report, provided that specific mitigation measures for biological and cultural resources are implemented. These measures include pre-activity surveys for nesting birds and roosting bats and compliance with the National Historic Preservation Act and California Public Resources Code. Key coordinating agencies include California State Parks, Caltrans, and the California Coastal Commission, with Tim Wong serving as the primary point of contact for the City of Santa Cruz.

General Info

Santa Cruz will realign West Cliff Drive inland to prevent erosion and storm damage.

Agency

California → City of Santa Cruz

Place of Performance

Pelton Avenue, Columbia Street, Santa Cruz, CA, 95060

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Cruz
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Santa Cruz
Office AddressN/A
Contacts
Tim WongAssistant Engineer II

Interested Companies (1)

DudekEncinitas, CA

Full Description

Show more
In December 2023 and early January 2024, high wave and storm events eroded and collapsed a section of the multiuse pathway across from approximately 800 West Cliff Drive and the Light House Field State Beach. The 800 West Cliff Drive Road Realignment project aims to eliminate the weakest link in the West Cliff Drive roadway system as an eroded scarp at the location has encroached to within 21 feet of the existing roadway, partially damaging an adjacent multiuse pathway. The project would shift an approximately 600-foot section of roadway nearest to the scarp approximately 60 feet inland, out of the 100-year erosion zone. A section of the multiuse pathway would also be shifted inland approximately 30 feet. A right-of-way acquisition from State Parks would be required to realign the road and multiuse pathway, as proposed. Other elements of the project include stormwater drainage improvements, minor utility improvements, minor improvements to an existing parking lot, relocation of existing signage and new signage, new fencing, new and relocated benches, removal of existing asphalt along the existing road and multiuse path, and construction site restoration.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 14 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS