Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

814653_CalNRG_OG

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

CalNRG Operating, LLC is authorized by the California Department of Conservation, Geologic Energy Management Division to rework the State PRC C-2 well (API 0411100839) located in the Montalvo West Oil Field in Ventura County, California. The project involves remedial, maintenance, and reconstruction work on the existing wellbore and casing, including the potential installation or removal of downhole production equipment, cement plugs, and packers. The operation is estimated to take 10 to 15 days to complete and will utilize existing infrastructure, well pads, and access roads, ensuring no new ground disturbance or vegetation removal. Produced water will be used via existing lines, while fresh water will be transported for cement blending. The project is situated within a developed oil field in an environmentally sensitive area within the Coastal Zone. It has been granted a California Environmental Quality Act Notice of Exemption under Classes 1, 2, and 4, as the work involves minor alterations with no significant environmental effects or cumulative impacts. All operations will continue to comply with Senate Bill 1137 regulations regarding health protection zones. The project is managed by the Geologic Energy Management Division, with primary coordination handled by Associate Oil and Gas Engineer Jeffrey J Whitson and agent Clifton Simonson.

General Info

CalNRG Operating will rework the State PRC C-2 well in Ventura County, California.

Agency

California Conservation, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Jeffrey J WhitsonAssociate Oil and Gas Engineer

Full Description

Show more
Proposed Project: CalNRG proposes to rework State PRC C-2 (04-111-00839) located in the Montalvo West Oil Field in Ventura County, California. This well was drilled and completed as a producer in 2014 and is currently active. The well is located within an established oilfield boundary, on a well-maintained existing well pad, and a well-maintained access road. Proposed project execution will require no new disturbance. No changes to the existing infrastructure will take place. The job will require approximately 10 to 15 days to complete. Produced water will be utilized for all well work by way of existing lines from the facilities to the well and fresh water will be transported in for cement blending. No new facilities are needed. Environmental Setting: Established oil field. Environmentally sensitive as they meet the definition of being within the Coastal Zone, or less than 1000 yards from the ocean. The surrounding land use around the proposed project consists of a developed oil field. Potential Environmental Impacts: Operation of the wells has been subject to all provisions of Senate Bill 1137 for existing wells located within designated health protection zones since June 2024 and would continue to operate in accordance with these regulations. Therefore, no unusual circumstances exist that would present a reasonable possibility of significant environmental effects. No vegetation will be disturbed by this project. There will be no increase in either the number or the capacity of flowlines. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving 1 permit for CalNRG Operating, LLC to rework the well(s) listed below, in the West Montalvo Oil Field. API #: 0411100839 Well Name: State PRC C-2 Exceptions to Exemptions: CalGEM further finds that there are no exceptions to the application of the categorical exemptions (PRC § 21084; 14 CCR § 15300.2) referenced above. For example, there is no substantial evidence that there are any “unusual circumstances” associated with the proposed project that create a reasonable possibility that the activity will have a significant effect on the environment, and that there are no significant “cumulative impacts” resulting from successive projects of the same type in the same place. Therefore, reliance on the exemptions is appropriate. A copy of this NOE (as required by 14 CCR § 15062(a)) and all other related materials can be made available to the public by contacting the CalGEM District office, located at 4820 McGrath Street, Suite 210, Ventura, CA 93003; or an electronic copy of these documents may be requested by contacting contact@example.gov. The notice filed with the State Clearinghouse may be accessed online at: https://ceqanet.opr.ca.gov.

Similar Contracts

Same NAICS industry code

NAICS: 213111
SLED
ODNR, Division of Oil & Gas – OWP – Wyandot 3 - 3 Wells
Solicitation # SRC0000042681
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Wyandot 3 project to plug and plate three orphan wells located in Wyandot County, specifically within Crawford and Ridge townships. The scope of work includes mobilization, site development, drilling, cleaning out, and plugging of the wells, as well as the decommissioning and disposal of all casing, tubing, and production equipment. The project requires the restoration of all disturbed areas to a condition equal to or better than their original state, with all work adhering to Ohio Administrative Code 1501-9-11-10 and specific technical drawings. The project must be completed by April 2, 2027, and includes a one-year warranty on all work and materials. To be eligible for award, suppliers must be active on state contract CSP900922 (DAS Index No. MAC110), maintain good standing with other agency projects, and have attended the mandatory pre-bid meeting held on November 3, 2026. The contract will be awarded to the lowest responsive and responsible bidder, provided their offer is mathematically and materially balanced. Bidders must submit their proposals via the OhioBuys portal by November 19, 2026. Payment is processed through the Orphan Well Project Management Contractor Portal and requires mutual agreement on work completion between the contractor and the Division's Project Representative. For federally funded portions of the project, contractors must comply with the Buy American Act and submit payroll reports with each invoice.
Dnr900200 Oil And Gas Dnrfra

POSTED

12 days ago

DEADLINE

in 12 days
View Details
NAICS: 213111
SLED
DS-761-270000000007-1 | Wellmaster Newaygo & Mecosta OW Plug Project 22 wells
Solicitation # 270000000007
The State of Michigan Department of Environment, Great Lakes, and Energy has issued Request for Quotation DS270000000007 for the plugging, drilling, re-drilling, and site restoration of orphan wells in Newaygo and Mecosta Counties, specifically targeting the Troyer 1-7A and Daniels 1-1B locations. The scope of work includes setting up workover rigs, cleaning and electronically logging wellbores, and performing bottom-up cementing to seal zones and protect freshwater aquifers. Additionally, the contractor is responsible for decommissioning abandoned tanks and vessels, including steam cleaning and scrap preparation, and removing all associated flowlines, electric lines, buildings, and debris. Proposals are due by November 24, 2026, following a mandatory pre-proposal meeting on November 10, 2026. Eligibility is limited to prequalified vendors, and awards are based on a technical evaluation of key personnel, owned equipment, technical experience, and a vendor questions worksheet, with a minimum scoring requirement of 80 points. The project is subject to the Davis-Bacon Act and specific Department of Labor wage determinations for heavy construction classifications. Bidders must provide a detailed project timeline divided into site preparation, mobilization/demobilization, plugging, and site restoration, along with unit pricing for all rated items in the provided pricing matrix.
Con Hall

POSTED

12 days ago

DEADLINE

in 17 days
View Details
NAICS: 213111
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Dnr900200 Oil And Gas Dnrfra

POSTED

15 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS