Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

770279_HWOC_UIC

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Holmes Western Oil Corporation is seeking approval from the California Department of Conservation, Geologic Energy Management Division to rework existing oil well API #0401924069, known as Well 8-3, located in the Jacalitos Oil Field in Fresno County, California. The project is scoped as a minor, four-day operation during the spring season with no new construction or surface expansion required. All activities will be contained within existing facilities, utilizing temporary equipment including a Production Rig, Rig Pump, Cement Truck, Bins, Storage Tank, and Tubing, with transportation handled by vehicles for personnel, supplies, and waste. The rework will involve the use of 350 barrels of produced water sourced from the nearby Jacalitos Production Facility, transported via vacuum truck, and 22.8 barrels of fresh water provided by the cementing service company. The project has been determined eligible for categorical exemptions under the California Environmental Quality Act, specifically Classes 1, 2, and 4, due to its minimal environmental impact, alignment with existing operations, and lack of significant land alteration or vegetation disturbance. Regulatory oversight and permitting authority reside entirely with CalGEM, which will issue the necessary approval for the well rework based on compliance with established state regulations, including California Code of Regulations sections 15301, 15302, and 15304, as well as Health and Safety Code sections 1684.1 and 1684.2. Inspection and acceptance will occur at the well site upon completion of operations, with the contractor responsible for ensuring all activities adhere to environmental and operational standards. No formal contract value, line-item pricing, or federal acquisition regulation clauses are documented, as this is not a federal procurement but a state-regulated environmental permitting action. There are no identified payment offices, accounting codes, invoicing systems, contracting officers, or procurement evaluation factors, and no federal entity identifiers, size certifications, or affirmative representations are included. The project is managed through the state’s environmental review system, with all correspondence directed to CalGEM’s central office in Bakersfield, and public access available via the CEQANet portal.

General Info

Holmes Western Oil to rework Well 8-3 in Fresno County using existing facilities with minimal environmental impact, per CalGEM approval.

Agency

California Conservation, Department of

NAICS

213111 - Drilling Oil and Gas WellsView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

770279_HWOC_UIC CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Catherine CalantasOffice Technician

Full Description

Show more
HWOC proposes to rework existing well Section 8 8-3. The project is expected to take 4 days and will be completed during the Spring season. Construction related activities are not required. All equipment will be contained within existing facilities and there will be no expansion of existing former use. Temporary equipment needed for the project includes a Production Rig, Rig Pump, Cement Truck, Bins, Storage Tank, Tubing. Vehicles needed to transport personnel, deliver supplies and materials, and transport waste will also visit the project site. Reworking the well will require the use of 350 bbls (14,700 gallons) of produced water and the use of 22.8 bbls (957.6 gallons) of fresh water. Produced water will come from our Jacalitos Production Facility, approximately 0.49 miles from the well location. The produced water will be transported to the project location by vacuum truck. Fresh water will be provided by the cementing service company. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving a permit for Holmes Western Oil Corporation to rework the well listed below, in the Jacalitos Oil Field. API # Well Name 0401924069 8-3

Similar Contracts

Same NAICS industry code

NAICS: 213111
New
Construction of the Monitoring Well AR-MW-04 IEUA 1158 Reservoir Site
Solicitation # construction-monitoring-well-ar-mw-04-ieua-1158-reservoir-site
The Inland Empire Utilities Agency is seeking qualified subcontractors to support the construction of a nested monitoring well designated AR-MW-04 at the 1158 Reservoir Site in California. The scope of work involves furnishing, installing, commissioning, and starting up a single borehole containing three 4-inch diameter monitoring well casings nested within one another, extending to a depth of approximately 1,000 feet. This project is designed to support environmental monitoring efforts and requires precise technical execution to ensure proper well construction and functionality in accordance with regulatory and operational standards. The solicitation is reserved exclusively for small business concerns under various SBA-designated categories including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business. The North American Industry Classification System code is 213111, indicating it falls under oil and gas drilling services. Proposals must be submitted by September 9, 2026, and all inquiries should be directed to Jordan Villalobos at the provided contact information. Performance of the work is required at the specified reservoir site in California, and interested parties are expected to demonstrate capacity to meet technical, safety, and scheduling requirements for subsurface well construction.
Inland Empire Utilities Agency

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 213111
New
Federal
Well Drilling and Casing InstallationThe contract requires the drilling of a water well to a specified depth, including the installation of suitable casing and screens to ensure structural integrity and water quality. Pump installation must be completed, followed by comprehensive pump testing to verify performance and flow rates under operational conditions. All work must adhere strictly to ASTM D1785 and D2241 standards for polyvinyl chloride piping and pressure ratings, as well as the California Plumbing Code to meet regulatory and safety requirements. Upon completion, the contractor must submit detailed as-built reports and official test results documenting the well’s construction, materials used, and performance metrics. This is a small business set-aside subcontract under NAICS code 213111 for water well drilling services, issued by the USDA Forest Service through its CSA Southwest 6 office. The solicitation was posted on August 7, 2026, with a response deadline of September 1, 2026, at 6:00 PM. The place of performance and specific location details are not provided in the data, but the project is governed by federal procurement regulations and requires full compliance with state and national technical standards. Participation is restricted to certified small businesses as defined by the SBA, and all deliverables must be submitted in a timely and accurate manner to fulfill contractual obligations.
Csa Southwest 6 Usda-Fs

POSTED

about 24 hours ago

DEADLINE

in 24 days
View Details
NAICS: 213111
New
SLED
Sentinel Peak Resources California LLC, Midway Sunset (Band Lease), CalGEM PFID 785461Sentinel Peak Resources California LLC plans to drill a single exploratory oil and gas well on BLM-administered public lands within the Midway Sunset Oilfield, approximately 2.5 miles northwest of Fellows, California, alongside Highway 33 between Sunrise Cogen Road and Mocal Road. The project entails minimal surface disturbance, involving the grading of a 200-foot by 100-foot well pad, resulting in only 0.50 acres of permanent land impact. No additional infrastructure such as flowlines or production facilities will be constructed, as this is strictly an exploratory effort. The entire project is scheduled to be completed in ten days, with two days of grading using 10-hour workdays, six consecutive days of 24-hour drilling operations, and two final days of completion work at 10 hours per day. The project is being managed under the California Department of Conservation, with primary oversight and environmental coordination handled by the agency through its California Energy and Geology Division. The project is associated with CalGEM PFID 785461 and has been posted as a forecast on August 7, 2026. Point of contact for environmental planning and regulatory matters is Mikayla Vaba at the Department of Conservation, while Thomas Cruise of Sentinel Peak Resources serves as the company agent. The Bureau of Land Management is also involved through its California office, ensuring compliance with federal land use requirements. All activities are confined to the established well pad footprint and do not extend beyond the scope of exploratory drilling, with no long-term operational impacts anticipated.
California Conservation, Department of

POSTED

1 day ago

DEADLINE

N/A
View Details