Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

24-ST-MWSS-Tidewater MNDI (1 of 24 well package)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Conservation, Department of

NAICS

213111 - Drilling Oil and Gas WellsView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

24-ST-MWSS-Tidewater MNDI CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Catherine CalantasOffice Technician

Full Description

Show more
Berry Petroleum Company, LLC proposes to sidetrack 24 existing oil wells in the heavily developed Midway-Sunset oil field to continue resource development. The project will result in a modification of existing wells, consistent with CCR 1684.1. Because the project will be a minor alteration of existing wells, there will be a negligible effect on the environment, consistent with CCR 1684.2. There will be no expansion of the previously approved use of the wells. Upon completion of the proposed work, the wells will be returned to service and produced into the existing facility infrastructure. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving 24 permit(s) for Berry Petroleum Company, LLC to sidetrack the well(s) listed below, in the Midway-Sunset Oil Field. API # Well Name 0403063778 “Unspecified” 41-24

Similar Contracts

Same NAICS industry code

NAICS: 213111
New
Construction of the Monitoring Well AR-MW-04 IEUA 1158 Reservoir Site
Solicitation # construction-monitoring-well-ar-mw-04-ieua-1158-reservoir-site
The Inland Empire Utilities Agency is soliciting subcontractors to support the construction of Monitoring Well AR-MW-04 at the 1158 Reservoir Site in California, requiring the furnishing, installation, and commissioning of a single nested monitoring well with three 4-inch diameter casings drilled to a depth of approximately 1,000 feet. This project is part of a broader environmental monitoring initiative and demands specialized expertise in deep well drilling, casing installation, and system startup to ensure accurate subsurface data collection. The work must be performed in strict compliance with technical specifications and regulatory standards relevant to groundwater monitoring infrastructure. This solicitation is designated for small business set-asides under the SBA, specifically targeting Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business concerns. The North American Industry Classification System code is 213111, indicating the project falls under drilling oil and gas wells. Proposals are due by September 9, 2026, with the solicitation posted on August 8, 2026. Primary contact for inquiries is Jordan Villalobos of the Inland Empire Utilities Agency, reachable via phone or email for further clarification regarding scope, requirements, or submission procedures.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 213111
New
Federal
Well Drilling and Casing InstallationThe contract requires the drilling of a water well to a specified depth, including the installation of suitable casing and screens to ensure structural integrity and water quality. Pump installation must be completed, followed by comprehensive pump testing to verify performance and flow rates under operational conditions. All work must adhere strictly to ASTM D1785 and D2241 standards for polyvinyl chloride piping and pressure ratings, as well as the California Plumbing Code to meet regulatory and safety requirements. Upon completion, the contractor must submit detailed as-built reports and official test results documenting the well’s construction, materials used, and performance metrics. This is a small business set-aside subcontract under NAICS code 213111 for water well drilling services, issued by the USDA Forest Service through its CSA Southwest 6 office. The solicitation was posted on August 7, 2026, with a response deadline of September 1, 2026, at 6:00 PM. The place of performance and specific location details are not provided in the data, but the project is governed by federal procurement regulations and requires full compliance with state and national technical standards. Participation is restricted to certified small businesses as defined by the SBA, and all deliverables must be submitted in a timely and accurate manner to fulfill contractual obligations.
Csa Southwest 6 Usda-Fs

POSTED

1 day ago

DEADLINE

in 24 days
View Details
NAICS: 213111
New
SLED
Sentinel Peak Resources California LLC, Midway Sunset (Band Lease), CalGEM PFID 785461Sentinel Peak Resources California LLC plans to drill a single exploratory oil and gas well on BLM-administered public lands within the Midway Sunset Oilfield, approximately 2.5 miles northwest of Fellows, California, alongside Highway 33 between Sunrise Cogen Road and Mocal Road. The project entails minimal surface disturbance, involving the grading of a 200-foot by 100-foot well pad, resulting in only 0.50 acres of permanent land impact. No additional infrastructure such as flowlines or production facilities will be constructed, as this is strictly an exploratory effort. The entire project is scheduled to be completed in ten days, with two days of grading using 10-hour workdays, six consecutive days of 24-hour drilling operations, and two final days of completion work at 10 hours per day. The project is being managed under the California Department of Conservation, with primary oversight and environmental coordination handled by the agency through its California Energy and Geology Division. The project is associated with CalGEM PFID 785461 and has been posted as a forecast on August 7, 2026. Point of contact for environmental planning and regulatory matters is Mikayla Vaba at the Department of Conservation, while Thomas Cruise of Sentinel Peak Resources serves as the company agent. The Bureau of Land Management is also involved through its California office, ensuring compliance with federal land use requirements. All activities are confined to the established well pad footprint and do not extend beyond the scope of exploratory drilling, with no long-term operational impacts anticipated.
California Conservation, Department of

POSTED

1 day ago

DEADLINE

N/A
View Details