Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

822-010-139-01 | Upgrade Electrical Infrastructure

Open
822-010-139-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Northern Illinois University is seeking an Architect/Engineer (A/E) for the upgrade and replacement of critical electrical service equipment at its DeKalb campus to ensure safe and reliable power. The project focuses on updating outdated electrical systems at Swen Parson Hall, Davis Hall, the Health Services Center, and the West Heating Plant, as well as replacing deteriorating insulation in medium voltage service loops. Much of the existing equipment dates back to the 1940s through the 1960s and currently fails to meet OSHA and NFPA safety regulations. The project has an estimated total cost and appropriated amount of 5,000,000 dollars. The A/E is responsible for providing a design that remains within the project budget and must comply with the Illinois Stretch Energy Code where applicable. Key responsibilities include identifying and applying for utility incentive programs, energy grants, and rebates. To ensure budget adherence, the A/E is encouraged to use independent cost estimators and must verify estimates at each project stage according to the Design and Construction Manual. Requirements include a minimum of 1,000,000 dollars in professional liability insurance, and all prevailing wage eligible work must comply with the Illinois Works Jobs Program Act Apprenticeship Initiative.

General Info

NIU seeks an A/E to upgrade outdated electrical systems for $5 million.

NAICS

N/A

Place of Performance

IL, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstsow
High

Read the document

Due in 20 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 20 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorthern Illinois University
Contacts1 person available
OfficeIL
Organization / AgencyNorthern Illinois University
Office AddressIL
Contacts
Maus GaryProject manager

Full Description

Show more
The Northern Illinois University - DeKalb, is a 98-building campus established in 1895. Swen Parson Hall 020 (U1040) is a 158,987 square foot, 10-story building established in 1952. Davis Hall 007 (U1033) is a 73,050 square foot, 7- story building established in 1942. The Health Services Center 055 (U1058) is a 50,380 square foot, 4-story building established in 1966. The West Heating Plant (U1110) is a 31,300 square foot, 2-story building established in 1962.
The scope of work provides for replacement and upgrade of critical electrical service equipment required to ensure safe and reliable power. This includes, but is not limited to, improvements at Swen Parson Hall 020 (U1040), Davis Hall 007 (U1033), Health Services Center 055 (U1058), West Heating Plant 051 (U1110) and portions of the medium voltage service loops that deliver power throughout the campus. The buildings noted have outdated electrical service with some equipment dating back to the 1940s, 50s and 60s when they were originally constructed. The age of this equipment presents multiple challenges when it comes to repair work, and most do not meet safety regulations such as OSHA and NFPA. For the medium voltage service loop scope, conductors have been particularly identified for replacement as the insulation of the conductors is starting to deteriorate. Work will be prioritized based on available funding. Hazardous materials may be encountered.
The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding.
If applicable, the design will need to comply with the Illinois Stretch Energy Code. The following A/E goals are applicable to the A/E team:

More opportunities from Northern Illinois University

Same awarding agency

New
SLED
822-010-140-01 | Upgrade Fire Protection and Fire Alarm Systems Phase 1
Solicitation # 822-010-140-01
Northern Illinois University is soliciting a consultant for the Upgrade Fire Protection and Fire Alarm Systems Phase 1 project at its DeKalb campus. The project focuses on upgrading outdated fire suppression and fire alarm systems across several academic buildings to ensure safety and compliance with current codes. The selected architect/engineer will be responsible for evaluating existing systems, providing recommendations, and managing the design and installation of necessary improvements. The total estimated project cost and appropriated amount are $5,000,000. The consultant must collaborate with the university to finalize the scope based on building priority and must ensure the design remains within budget, with a requirement for professional liability insurance of $1,000,000. The scope includes identifying and applying for utility incentive programs, energy grants, and rebates, and complying with the Illinois Stretch Energy Code where applicable. The project is subject to the Illinois Works Jobs Program Act Apprenticeship Initiative for all prevailing wage eligible work. Socioeconomic goals for the A/E team include a 20% combined MBE/WBE goal, requiring participation from both types of firms, and a 3% combined PBE/VBE goal. There is no specified set-aside status for this solicitation. The project manager is Gary Maus, and the design process requires updated estimates at each stage in accordance with the Design and Construction Manual.

POSTED

about 23 hours ago

DEADLINE

in 20 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS