822-010-140-01 | Upgrade Fire Protection and Fire Alarm Systems Phase 1
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Northern Illinois University is soliciting a consultant for the Upgrade Fire Protection and Fire Alarm Systems Phase 1 project at its DeKalb campus. The project focuses on upgrading outdated fire suppression and fire alarm systems across several academic buildings to ensure safety and compliance with current codes. The selected architect/engineer will be responsible for evaluating existing systems, providing recommendations, and managing the design and installation of necessary improvements. The total estimated project cost and appropriated amount are $5,000,000. The consultant must collaborate with the university to finalize the scope based on building priority and must ensure the design remains within budget, with a requirement for professional liability insurance of $1,000,000. The scope includes identifying and applying for utility incentive programs, energy grants, and rebates, and complying with the Illinois Stretch Energy Code where applicable. The project is subject to the Illinois Works Jobs Program Act Apprenticeship Initiative for all prevailing wage eligible work. Socioeconomic goals for the A/E team include a 20% combined MBE/WBE goal, requiring participation from both types of firms, and a 3% combined PBE/VBE goal. There is no specified set-aside status for this solicitation. The project manager is Gary Maus, and the design process requires updated estimates at each stage in accordance with the Design and Construction Manual.
General Info
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- AI contract breakdown13 sections, Uniform Contract Format
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
The scope of work for this project provides for upgrades to fire suppression and fire alarm systems in several campus academic buildings. The existing systems are outdated and, in some cases, in need of significant repair and/or replacement to meet current code requirements. These upgrades are necessary to ensure students, faculty and staff are safe in these heavily used buildings. The scope of work is for the selected consultant to first evaluate existing systems, provide recommendations for what is required, followed by design and installation of necessary improvements. Buildings have been prioritized for needed repairs and upgrades for inclusion in this project. The NIU will provide the selected consultant with most current prioritization when the project begins, the consultant will collaborate with the NIU to finalize the scope in alignment with the project budget. Hazardous materials may be encountered.
The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding.
If applicable, the design will need to comply with the Illinois Stretch Energy Code. The following A/E goals are applicable to the A/E team:
More opportunities from Northern Illinois University
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
