This Government Contract opportunity from Illinois was posted on October 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
825-020-165-01 | Upgrade Elevators
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation 825-020-165-01, managed by the Capital Development Board for Southern Illinois University, involves the complete modernization of two traction elevators in the James Neckers Building 0063. The project focuses on Elevator 1, a five-stop 4,000-pound unit with basement equipment, and Elevator 2, a four-stop 2,000-pound unit with a penthouse machine room. The scope includes all necessary structural, architectural, mechanical, electrical, fire alarm, and accessibility modifications to ensure compliance with the Illinois State Fire Marshal Elevator Safety Division codes and the Illinois Stretch Energy Code. The total appropriated amount and estimated project cost are 1,759,000 dollars. The selected A/E team must include an elevator consultant experienced in modernization and is encouraged to utilize independent cost estimators to ensure the design remains within budget, as designers may be responsible for redesigns if bids exceed funding. Key requirements include the use of non-proprietary equipment where possible, the assessment and application for utility incentives and energy grants, and the management of potential hazardous materials. The contract mandates 500,000 dollars in professional liability insurance and sets a combined MBE/WBE goal of 18 percent. Proposals are due by October 27, 2026, with final selections scheduled for presentation at the Board Meeting on January 12, 2027.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- CBP#4282 Pump and Hydraulic System RepairsOpen now, due in 9 days
- Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)Open now, due in 10 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Contract opportunity posted
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
The scope of work provides for the complete modernization of two existing traction elevators. Elevator #1 is a five-stop, 4,000-pound traction elevator with basement-mounted equipment serving front and rear entrances. Elevator #2 is a four-stop, 2,000-pound traction elevator with a machine room in the penthouse. The work shall include complete modernization of both elevators and their machine rooms to bring the systems into compliance with the current elevator code issued by the Office of the Illinois State Fire Marshal, Elevator Safety Division. The project shall include all required structural, architectural, mechanical, electrical, fire alarm, communication, accessibility, and code compliance modifications necessary to support the elevator modernization work. The modifications may include work to the building's electrical service, ventilation, and adjacent building components impacted by construction. Non-proprietary elevator equipment shall be used wherever possible. The A/E team shall include an elevator consultant with experience in elevator modernization and replacement projects. Hazardous materials may be encountered. The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project. The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding. If applicable, the design will need to comply with the Illinois Stretch Energy Code.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS