This Solicitation opportunity from Illinois was posted on October 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
825-030-079-01 | Investigate & Correct Water Infiltration - Alumni Hall
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation 825-030-079-01, managed by the Capital Development Board for Southern Illinois University, focuses on the investigation and correction of water infiltration at Alumni Hall. The project targets the 33,500 square foot lower level of the six-story facility, which has suffered multiple water events impacting academic use. The scope of work includes the demolition of interior walls, ceilings, and flooring to facilitate field investigations, the testing and abatement of hazardous materials, and the structural analysis and potential repair or replacement of a severely corroded steel beam. If funding permits, the project may expand to include converting the lower level into instructional classroom spaces. The estimated total project cost and appropriated amount are 1,300,000 dollars. The selected Architect/Engineer is responsible for ensuring the design remains within budget, utilizing independent cost estimators, and complying with the Illinois Stretch Energy Code where applicable. Additionally, the A/E must identify and apply for all eligible utility incentives, energy grants, and rebates. Professional liability insurance of 500,000 dollars is required. Proposals are due by October 27, 2026, with selections scheduled for presentation at the Board Meeting on January 12, 2027.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 26 days
- Building 262 Renovations FLETC GlyncoOpen now, due in 11 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
The scope of work provides for investigation and correction of water infiltration in Alumni Hall. The water infiltration has caused severe corrosion of a steel structural beam, and the beam needs to be structurally analyzed and may need repair or replacement. The scope also includes demolition of interior walls and finishes in the affected areas. The project includes the renovation of the existing 33,500 square foot lower level as required to mitigate multiple locations of water intrusion. The building is approaching 50 years in age and has suffered multiple water events that have impacted department faculty office use and classroom availability. With the recent completion of the Health Sciences Building in 2025, the School of Nursing was relocated out of Alumni Hall, thereby freeing up space to relocate the Department of Psychology from the lower level to the former School of Nursing space upstairs.
The Department of Psychology currently occupies most of the lower level and is the department most directly impacted by the water events. The Attention and Behavior Clinic has already relocated upstairs. Once the rest of Psychology relocates by this coming winter, the lower level will be free of all academic units to fully investigate and mitigate water intrusion issues. Expediting the effort as much as possible to take advantage of breaks and avoid major disruptions in an academic building will be critical.
Once the water intrusion has been identified and corrected, the scope includes converting the lower level to instructional classroom spaces if funding allows.
Project Program - The project program includes investigations and remediation of the existing lower level to locate and prevent future water intrusion. See below for additional details:
- Remove existing interior walls, ceilings, and flooring in the office and classrooms spaces. - Field investigate multiple areas of intrusion, previously discovered and yet unknown. - Complete testing and abatement of hazardous materials in the lower level as required to make repairs. - Complete repairs as required to address the issues discovered. This could include exterior and interior construction as determined by the investigation results. - Build out the lower level for instructional classrooms spaces if budget allows. Hazardous materials may be encountered. The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding. If applicable, the design will need to comply with the Illinois Stretch Energy Code.