This contract involves construction services to correct Facility Condition Assessment deficiencies at Mill Springs National Cemetery. Managed by the Department of Veterans Affairs National Cemetery Administration, the project encompasses a wide range of repairs and upgrades, including HVAC replacement, lightning protection, insulation, and accessibility improvements at Maintenance Building 3001. Additionally, the scope includes extensive site work such as road resurfacing, irrigation installation, drainage reconstruction, monument repair, and the demolition and replacement of the committal shelter and associated hardscaping. The current contract, held by SIGO VALIANT JV LLC, is valued at 1,654,620.50 dollars with a potential end date of November 13, 2026. The project is structured as a firm fixed price agreement with a period of performance of 270 calendar days from the notice to proceed. This opportunity is predicted to be a full and open competition recompete, with a high confidence level for a full recompete process.
General Info
Place of Performance
VA, 425444451, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Current Contract: 36C78625C0022 Incumbent: SIGO VALIANT JV LLC Contract Value: $1,654,620.5 Potential End Date: 2026-11-13T00:00:00.000Z Competition: FULL AND OPEN COMPETITION Pricing: FIRM FIXED PRICE Classification: full-recompete (Confidence: high - 90/100)
Facility Condition Assessment (FCA) Deficiencies Corrections Repairs, Mill Springs National Cemetery. The Price schedule is hereby change Delete sub-CLIN I through XIII in its entirety. Price schedule modified from from: PRICE/COST SCHEDULE Item Information CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 0001 861CM30111 1.00 JB $__________________ $__________________ Base Bid All work shown or specified within the drawings and specifications. The Contractor shall provide all Management, Supervision, Labor, Materials, Equipment, Parts, Tools, etc., required, and necessary to complete and provide construction services to Correct Cemetery Facility Condition Assessment (FCA) Deficiencies, as stated and described herein, at Mill spring National Cemetery. The Contract Period of Performance (POP) is two hundred and seventy (270) Calendar Days from issuance of the Government s Notice to Proceed letter. NOTICE: A contract award will be made to the responsible bidder who submitted the lowest responsive bid for ALL work specified. A single award will be made on the Grand Total Base Bid Amount for all work, inclusive of the thirteen (13) stated items. Bidder must provide a breakdown cost for each of the below listed items (which will be included in the Grand Total Base Bid Amount). GRAND TOTAL BASE BID AMOUNT $__________________ DESCRIPTION QUANTITY UNIT AMOUNT ITEM I 1.00 JB $__________________ Maintenance Building 3001 HVAC: Work includes updating, repairing, and replacing HVAC system as well as installing an air handling unit ITEM II 1.00 JB $__________________ Maintenance Building 3001 Lightning Protection: Work includes repairing lightning protection ITEM III 1.00 JB $__________________ Maintenance Building 3001 Insulation: Work includes installing attic fiberglass insulation between the attic wood rafters ITEM IV 1.00 JB $__________________ Maintenance Building 3001 Accessibility: Work includes removal of existing ramp and railings and replace with new concrete ramp and ramp and railing ITEM V 1.00 JB $__________________ Maintenance Building 3001 Signage: Work includes installing exterior identification signage ITEM VI 1.00 JB $__________________ Site Conditions Road Repairs: Work includes mill and re-surface around North Drive, East Drive, South Drive, and Center Drive see Civil Site Plan ITEM VII 1.00 JB $__________________ Site Conditions Guardrail/Signage: Work includes installing post and chain from east of POW/MIA flagpole to Committal Shelter one area as well as Site Wayfinding for POW/MOA assembly area ITEM VIII 1.00 JB $__________________ Site Conditions Irrigation: Work includes installing new irrigation system per plans in areas of section A through M . ITEM VIIII 1.00 JB $__________________ Site Conditions Drainage: Work includes removal of trees and debris in two drainage ditches northeast of maintenance building and burial sections and reconstruct with Rip Rap and filter fabric lined ditches per plans and specs ITEM X 1.00 JB $__________________ Site Conditions Flower Watering Stations: Work includes the removal of two older model flower watering stations and replacing with standard Flower Watering Station with Flower Vase and Trash Receptacles ITEM XI 1.00 JB $__________________ Site Conditions Monuments/Private, Non-Military Headstones: Work includes repairing monuments / private non-military headstones ITEM XII 1.00 JB $__________________ Site Conditions Committal Shelter: Work includes demolition of the existing committal shelter down to the ground surface and the demolition of the concrete pad and railing adjacent to rock retaining wall. Retaining wall is to be protected during demolition for reuse. Clean and repoint mortar in face of retaining wall. Install new safety railing. Work also includes placement of new hardscape seating area, benches, sidewalk and landscaping as specified in the civil site plan ITEM XIII 1.00 JB $__________________ Site Conditions Wayfinding/Signage: Work includes installation, repair or replacement for signage. Military service seals at the New Committal Shelter in the expansion area are to be removed and repositioned with addition of a new U.S. Space Force seal. Install per plans and specs Price Schedule changes to: PRICE/COST SCHEDULE Item Information CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 0001 861CM30111 1.00 JB $__________________ $__________________ Base Bid All work shown or specified within the drawings and specifications. The Contractor shall provide all Management, Supervision, Labor, Materials, Equipment, Parts, Tools, etc., required, and necessary to complete and provide construction services to Correct Cemetery Facility Condition Assessment (FCA) Deficiencies, as stated and described herein, at Mill spring National Cemetery. The Contract Period of Performance (POP) is two hundred and seventy (270) Calendar Days from issuance of the Government s Notice to Proceed letter. NOTICE: A contract award will be made to the responsible bidder who submitted the lowest responsive bid for ALL work specified. A single award will be made on the Grand Total Base Bid Amount for all work, inclusive of the thirteen (13) stated items. Bidder must provide a breakdown cost for each of the below listed items (which will be included in the Grand Total Base Bid Amount). GRAND TOTAL BASE BID AMOUNT $__________________
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Veterans Affairs → National Cemetery Administration (36C786)
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS