This Solicitation opportunity from California was posted on August 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of National City in California is seeking solicitations for the 8th And Roosevelt Active Transportation Corridor project, identified as CIP No. 19-44. This project falls under NAICS code 237310, focusing on highway, street, bridge, tunnel, and pipeline construction. The work will be performed within National City, California, 91950.
Interested parties must submit their responses by the deadline of May 30, 2026. The primary point of contact for this solicitation is Stephen Manganiello, who can be reached via email or phone for further inquiries regarding the submission process and project requirements.
General Info
National City seeks construction bids for 8th And Roosevelt corridor by May 30, 2026.
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix 2 - Certified Payroll Documents: This document provides guidelines and required forms for certified payroll reporting for contractors and subcontractors, specifically referencing California Department of Transportation (Caltrans) and DIR requirements. It includes a Statement of Compliance (CEM-2503), a Statement of Non-Performance, and an Authorized Signatory form, detailing the necessary documentation for wage payments, fringe benefits, and apprenticeship program compliance.
PDF
PDF, High priority: read this firstifb
HighAI Summary for CIP No. 19-44: 8th and Roosevelt Active Transportation Corridor: Notice Inviting Bids for Capital Improvement Project No. 19-44, involving pedestrian and bicycle facility improvements in the City of National City. The scope includes a new shared-use path, lighting, electrical infrastructure, and roadway improvements. Bids are due by May 22, 2026, via PlanetBids. The project is subject to the National City Project Labor Agreement and Davis-Bacon prevailing wages.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for CIP No. 19-44 - 8th and Roosevelt Active Transportation Corridor Owner-Contractor Agreement: A sample Owner-Contractor Agreement between the City of National City and a Contractor for the construction of the 8th and Roosevelt Active Transportation Corridor (CIP No. 19-44). The document outlines terms for turn-key construction, payment, performance time, non-discrimination, insurance requirements, and governing law under California jurisdiction. It includes a list of Contract Documents in Exhibit A, such as bid schedules, plans, and various standard specifications.
PDF
PDF, High priority: read this firstbid-bond-form
HighAI Summary for CIP No. 19-44 - Bid Security Form for Bond: A bid security bond form for the 8th and Roosevelt Active Transportation Corridor project (CIP No. 19-44) for the City of National City. The document requires a penal sum of 10% of the total bid amount and includes a California notary acknowledgment section.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for CIP No. 19-44 - Designation of Subcontractors: A bid document for the 8th and Roosevelt Active Transportation Corridor (CIP No. 19-44) requiring the bidder to list all subcontractors performing work exceeding 0.5% of the total bid, in compliance with the California Subletting and Subcontracting Fair Practices Act.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CIP No. 19-44 - Female and Minority Goals: This document outlines the female and minority utilization goals for Federal-aid construction contracts and subcontracts exceeding $10,000 for the 8th and Roosevelt Active Transportation Corridor (CIP No. 19-44). It provides specific percentage goals by economic area and county across California and mandates the submission of Form FHWA PR-1391 by August 15 for each July work is performed.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for CIP No. 19-44 - Verification and Execution Form: A mandatory Verification and Execution form for the 8th and Roosevelt Active Transportation Corridor project (CIP No. 19-44). The document requires bidders to certify the accuracy of their bid under penalty of perjury and agree to indemnify the City of National City. Failure to execute this document renders the bid non-responsive.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of National City - Construction Plans: Technical construction plans and specifications for the City of National City, featuring demolition notes, striping details based on 2018 Caltrans standards, and landscape construction legends. The document includes detailed instructions for utility verification, pavement removal, and hardscape material specifications.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for City of National City Project Labor Agreement (PLA): Project Labor Agreement (PLA) effective December 14, 2023, between the City of National City, the San Diego Building and Construction Trades Council, and signatory Craft Unions. The agreement establishes labor standards, wage and benefit requirements, and dispute resolution mechanisms for 'Covered Projects' (construction projects with an estimated award value of $1,000,000 or more). It includes provisions for union recognition, apprenticeship programs, and workforce dispatching to ensure stability and efficiency in the completion of city construction projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of National City - Standard Traffic Control Acknowledgment: This document outlines the mandatory traffic control requirements and standards for contractors working within the City of National City. It specifies compliance with MUTCD, Caltrans, and Greenbook standards, details the process for obtaining traffic control permits, establishes work hour restrictions (7am-5pm), and defines requirements for pedestrian ADA access, emergency vehicle access, and site maintenance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit 12-G: Required Federal-Aid Contract Language: This document provides mandatory contract language for Local Assistance Federal-aid construction projects. It outlines critical requirements including Disadvantaged Business Enterprise (DBE) participation, nondiscrimination statements, prompt payment, Buy America compliance, and quality assurance standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Form FHWA-1273 Required Contract Provisions: Revised October 23, 2023, Form FHWA-1273 outlines the required contract provisions for Federal-aid construction contracts. It mandates the physical incorporation of these provisions into all contracts and subcontracts, covering general requirements, nondiscrimination, Davis-Bacon Act compliance, safety standards, and EEO policies.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Geotechnical Pavement and Percolation Evaluation - 8th and Roosevelt Avenue: A geotechnical report dated September 17, 2021, prepared by Leighton Consulting, Inc. for Kimley-Horn and Associates. The document provides a pavement and percolation evaluation for the 8th and Roosevelt Development Project in National City, California. It includes subsurface investigation results, pavement section measurements, site geology analysis, groundwater observations, and infiltration rates to support the design of asphalt reconstruction and bio-retention basins.
PDF
PDF, Low priorityspecifications
LowAI Summary for AIRX Project X221503 - National City 8th St & Roosevelt Ave Potholing Report: A technical potholing report prepared by Utility Surveyors, Inc. (AIRX) for Kimley-Horn, detailing vacuum excavation and utility locating services performed between November 18 and November 22, 2022, at W. 8th Street and Roosevelt Avenue in National City, CA. The document includes procedures, site-specific details, and a tabulation report for 7 potholes used to verify the depth and alignment of underground utilities.
PDF
PDF, Low priorityother
LowAI Summary for Attachment A - PLA Letter of Assent: A template Letter of Assent for contractors to sign, confirming their agreement to be bound by the City of National City Project Labor Agreement (PLA) for work performed under a specific contract.
PDF
PDF, Low priorityclose-out-documents
LowAI Summary for CIP No. 19-44 - Appendix 3 Close-out Documents: A collection of close-out forms for the 8th and Roosevelt Active Transportation Corridor project (CIP No. 19-44) for the City of National City. The document includes templates for Contractor's Certification of Completion, Affidavit of Disposal, Consent of Surety for Final Payment, Contractor's Affidavit of Payment, and a Guarantee Agreement.
PDF
PDF, Low priorityother
LowAI Summary for CIP No. 19-44 - Contractor and Grantee Compliance with Economic Sanctions: A certification document for the 8th and Roosevelt Active Transportation Corridor (CIP No. 19-44) requiring contractors to certify compliance with Executive Order N-6-22 regarding economic sanctions, specifically relating to Russian entities and support for Ukraine, as required by California Public Contract Code section 2204.
PDF
PDF, Low prioritycertification
LowAI Summary for CIP No. 19-44 - Debarment and Suspension Certification: A certification form for the 8th and Roosevelt Active Transportation Corridor project (CIP No. 19-44) requiring bidders to certify under penalty of perjury that they are not currently suspended, debarred, or ineligible for federal agency contracts per 49 CFR Part 29.
PDF
PDF, Low priorityother
LowAI Summary for CIP No. 19-44 - Equal Employment Opportunity Certification: A certification form for the 8th and Roosevelt Active Transportation Corridor (CIP No. 19-44) requiring bidders and subcontractors to certify compliance with equal opportunity clauses and reporting requirements per Executive Orders 10925, 11114, and 11246.
PDF
PDF, Low priorityother
LowAI Summary for CIP No. 19-44 - Iran Contracting Act Certification: A certification form for the 8th and Roosevelt Active Transportation Corridor project (CIP No. 19-44) requiring contractors to certify compliance with the California Public Contract Code regarding investment activities in Iran for contracts exceeding $1,000,000.
PDF
PDF, Low priorityother
LowAI Summary for CIP No. 19-44 - Non-Collusion Affidavit: A Non-Collusion Affidavit for the 8th and Roosevelt Active Transportation Corridor (CIP No. 19-44). This document requires the bidder to certify under penalty of perjury that their bid is genuine, not collusive, and was not developed in coordination with other bidders to fix prices.
PDF
PDF, Low priorityother
LowAI Summary for CIP No. 19-44 - Non-Lobbying Certification for Federal-Aid Contracts: A certification document and Standard Form-LLL (Disclosure of Lobbying Activities) for the 8th and Roosevelt Active Transportation Corridor project (CIP No. 19-44). It requires the bidder to certify that no federal funds were used for lobbying and provides the necessary forms and instructions for disclosing lobbying activities pursuant to 31 U.S.C. 1352.
PDF
PDF, Low prioritysupporting-document
LowAI Summary for CIP No. 19-44 - Public Contract Code 10232 Statement: A certification form for the 8th and Roosevelt Active Transportation Corridor (CIP No. 19-44) requiring the contractor to state, under penalty of perjury, compliance with Public Contract Code Section 10232 regarding federal court findings of contempt related to National Labor Relations Board orders.
PDF
PDF, Low priorityquestionnaire
LowAI Summary for CIP No. 19-44 - Public Contract Code Section 10162 Questionnaire: A mandatory bidder questionnaire for the 8th and Roosevelt Active Transportation Corridor (CIP No. 19-44) requiring disclosure of any prior disqualifications or removals from government projects due to law or safety regulation violations per Public Contract Code Section 10162.
PDF
PDF, Low priorityother
LowAI Summary for CIP No. 19-44 - Public Contract Code Section 10285.1 Statement: A certification form for the 8th and Roosevelt Active Transportation Corridor (CIP No. 19-44) requiring bidders to declare under penalty of perjury whether they have been convicted of fraud, bribery, or antitrust violations within the preceding three years per California Public Contract Code Section 10285.1.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Office Bulletin #25-07 R2: Suspension of DBE Program: Issued January 2026 by the Caltrans Division of Local Assistance, this policy update (#25-07 R2) implements the US DOT's Interim Final Rule (IFR) regarding the suspension of Disadvantaged Business Enterprise (DBE) contract goal setting, participation counting, and reporting. It provides guidance to Local Public Agencies (LPAs) on updated federal requirements and clarifies that while certain monitoring activities are suspended, compliance with termination procedures and the Subletting and Subcontracting Fair Practices Act remains mandatory.
PDF
PDF, Low priorityaward
LowAI Summary for Permit 11-24-N-MC-1605 - City of National City: Encroachment Permit issued by the California Department of Transportation (Caltrans) to the City of National City on March 5, 2025. The permit authorizes work on Interstate 5 (postmiles R11.15 to R11.69) to provide traffic control for the construction of a shared-use path, landscape areas, and pedestrian lighting relocation. The permit includes specific requirements for environmental compliance (AB 617), air quality, and hazardous waste mitigation, and is valid until June 30, 2026.