Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

8th Street Re-Opening and Improvements Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 8th Street Re-Opening and Improvements Project is a forecast infrastructure initiative managed by the California State University Board of Trustees and the City of Marina. Located in Seaside, California, the project focuses on roadway improvements along 8th Street between 3rd Avenue and 5th Avenue. The scope of work includes the reconstruction and rehabilitation of the existing roadway, installation of new pavement, striping, traffic signage, and the construction of curb, gutter, and sidewalks. A significant portion of the project is dedicated to enhancing accessibility through ADA-compliant curb ramps, bicycle lanes, and a multi-use path to improve pedestrian and vehicular circulation. Additional technical requirements include the installation of a comprehensive storm drainage system featuring pipelines, catch basins, manholes, and infiltration chambers, as well as necessary utility adjustments and relocations. The project is categorized under NAICS code 237310 and is exempt from CEQA under sections 15301, 15302, 15303, 15304, and 15061(b)(3) due to the minor nature of the alterations. Primary points of contact include Matthew McCluney, Director of Campus Planning and Development, and Andrea Abrego, Environmental and Grants Manager. The project aims to benefit the California State University, Monterey Bay community, the City of Marina, and the general traveling public.

General Info

Reconstruct 8th Street in Marina with ADA ramps, bike lanes, storm drainage, and improved pedestrian crossings.

Agency

California State University Board of Trustees

Place of Performance

8th Street and 3rd Avenue; 8th Street and 5th Avenue, Seaside, CA, 93955

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia State University Board of Trustees
Contacts3 people available
OfficeN/A
Organization / Agency
California State University Board of Trustees
Office AddressN/A
Contacts
Matthew McCluneyDirector of Campus Planning and Development
Andrea AbregoEnvironmental and Grants Manager
Edrie Delos SantosConsultant Engineer

Full Description

Show more
The proposed project consists of roadway improvements along 8th Street between 3rd Avenue and 5th Avenue in the City of Marina, Monterey County. The project includes reconstruction and rehabilitation of the existing roadway; construction and replacement of curb, gutter, sidewalk, ADA-compliant curb ramps, bicycle lanes, and a multi-use path; installation of new pavement, pavement markings, traffic signage, and striping; and improvements to intersections, including curb returns and pedestrian crossings. The project also includes installation of a new storm drainage system consisting of pipelines, catch basins, manholes, infiltration chambers, and associated drainage facilities; grading; utility adjustments and relocations as necessary; demolition and replacement of existing pavement and other roadway improvements; and restoration of disturbed areas. Construction would occur within the existing roadway corridor on California State University, Monterey Bay-owned property and existing public rights-of-way. The purpose of the project is to rehabilitate existing transportation infrastructure, improve pedestrian, bicycle, and vehicular circulation, enhance accessibility in compliance with the Americans with Disabilities Act (ADA), improve stormwater drainage, and maintain the long-term functionality of the roadway. The primary beneficiaries of the project include California State University, Monterey Bay; the City of Marina; campus students, faculty, staff, and visitors; adjacent property owners; and the traveling public.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including land surveying, site photography, tunneling, boring, jacking, micro tunneling, and the installation of utilities, cathodic protection, and steel casing. Additional requirements encompass site preparation, shoring, subsurface investigation, SWPPP, asphalt paving, landscaping, and the supply of ready mix and precast concrete. The solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 18 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 19 hours ago

DEADLINE

in 11 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS