Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

901-987 North Rengstorff Avenue Residential Development Project - Modification to Approval Resolution

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Leghorn Street, Plymouth Street, Mountain View, CA, 94043

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The Project Applicant has requested and the City Council of the City of Mountain View has approved modifications to the Approval Resolution (Resolution No. 19054), comprised of amendments to two (2) project conditions of approval for a previously-approved 15-story, 455-unit multifamily residential building (Builder's Remedy) on an approximately 54,782 square foot (1.26-acre) site located at 901, 913, and 987 N. Rengstorff Avenue in the City of Mountain View, as proposed by the project applicant.

More opportunities from California → City of Mountain View

Same awarding agency

NAICS: 925120
New
SLED
R3 Zoning District Update Project
Solicitation # 2025070500
The R3 Zoning District Update is a large-scale urban planning initiative managed by the City of Mountain View, California, designed to modernize zoning regulations across approximately 8,350 parcels covering 1,260 acres. The project aims to align citywide development with recent state housing laws and the 2023–2031 Housing Element programs. By updating these regulations, the city intends to foster diverse housing options, including middle-income ownership opportunities, enhance design quality, and permit neighborhood-serving commercial uses. The long-term impact of the update is significant, with the potential for full buildout to add between 10,000 and 16,000 residential units by the year 2050. The project has undergone a comprehensive environmental review process in compliance with the California Environmental Quality Act (CEQA), resulting in a Final Environmental Impact Report. This review identified potential significant impacts related to greenhouse gas emissions, air quality, and transportation. To address these concerns, the city has established a Mitigation Monitoring and Reporting Program that includes specific measures for air quality, biological resources, cultural resources, and geological hazards. The project is currently moving forward following the completion of the Draft EIR and the formal transmittal of environmental documents to the State Clearinghouse.
Administration of Urban Planning and Community and Rural Development

POSTED

about 23 hours ago

DEADLINE

N/A
View Details
NAICS: 236210
New
SLED
749 West El Camino Real Mixed-Use Project
Solicitation # 2023050251
The 749 West El Camino Real Mixed-Use Project in Mountain View, California, involves the demolition of an existing restaurant and bank building, along with associated parking and landscaping, to develop two new structures. The project consists of a two-story bank building and a six-story mixed-use building featuring 299 multi-family residential units, including 33 reserved for low- to very-low-income households, and up to 13,465 square feet of ground-floor commercial space. The development includes two levels of underground parking, a public plaza on El Camino Real, and the preservation of existing artwork from the original site. The project utilizes the State Density Bonus Law to achieve a floor-area-ratio of approximately 3.05 and adheres to Tier 1 development standards of the El Camino Real Precise Plan. The project is subject to strict environmental and safety compliance measures, including a construction health risk assessment for nearby residential units and a toxic assessment report for soil contaminants. Key infrastructure requirements include the installation of 458 total bicycle parking spaces, ADA-compliant curb ramps, and safety improvements to the Castro and El Camino intersection. Construction mandates prohibit the closure or narrowing of sidewalks and require traffic control plans approved by the Public Works Department in accordance with the California Manual of Uniform Traffic Control Devices. Additionally, the project must comply with CALGreen Tier 2 electric vehicle requirements, implement a Travel Demand Management program, and provide replacement trees for any removed Heritage Trees. The project was approved by the City Council on November 18, 2025, following a Final Environmental Impact Report.
Industrial Building Construction

POSTED

about 23 hours ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS