Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

904143133 Lake Hughes Repair and Maintenance Project (Notification of Streambed Alteration, No. EPIMS-LAN-57363-R5)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Streambed Alteration Agreement EPIMS-LAN-57363-R5 with Southern California Edison for the Lake Hughes Repair and Maintenance Project. Located on Fish Creek in Los Angeles County, the project involves vegetation trampling to access Pole 970456E, the removal of a southern plate anchor, and the installation of a new anchor within three feet of the original site. These activities will result in 0.008-acre of temporary impacts to Fremont Cottonwood, Salix gooddingii-Salix laevigata Forest and Woodland, and Upland Mustards/Star-thistle Fields. The scope includes traversing 275 feet of the creek bed and channel, with a requirement to restore all project areas to pre-project contours and ecology upon completion. The project is expected to be completed within approximately five workdays during dry weather. Compliance is governed by Fish and Game Code sections 1600, 1602, 1605, 5650, and 5652. Key requirements include the appointment of qualified biologists and monitors, whose resumes must be submitted 15 days prior to surveys. Mandatory deliverables include pre-project biological survey reports due 48 hours before initiation and a Final Construction Report submitted via the EPIMS portal within 60 days of completion. The agreement mandates strict environmental protections, including the use of biodegradable erosion control materials, immediate reporting of non-compliance within 24 hours, and reporting special-status species observations to the CNDDB within five days. The project is exempt under CEQA Class 1 as it involves minor maintenance of existing public utility structures.

General Info

Southern California Edison to conduct limited anchor replacement and vegetation trampling at Fish Creek with full restoration and strict compliance reporting.

Agency

California → Fish and Wildlife, Region 5 - South Coast, San Diego

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Streambed Alteration Agreement EPIMS-LAN-57363-R5 Fish Creek

PDFcontract-document

EPIMS-LAN-57363-R5 CEQA Notice of Exemption

PDFceqa-notice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 5 - South Coast, San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 5 - South Coast, San Diego
Office AddressN/A
Contacts
Andrew ChambersSenior Environmental Scientist (Specialist)
Warnetta LoganSenior Manager, Environmental Partners & Planners - Planning North

Full Description

Show more
The California Department of Fish and Wildlife has executed Streambed Alteration Agreement EPIMS Notification No. EPIMS-LAN-57363-R5, pursuant to Section 1602 of the Fish and Game Code to Southern California Edison (Permittee), as represented by Warnetta Logan. The project consists of vegetation trampling to facilitate access to Pole 970456E, the removal of Pole 970456E’s southern plate anchor, and the installation of a new anchor within three feet of the anchor slated for removal previously mentioned. Project activities will result in 0.008-acre of temporary impacts to Fremont Cottonwood Forest and Woodland, Salix gooddingii - Salix laevigata Forest and Woodland, and Upland Mustards/Star-thistle Fields Herbaceous Semi-Natural Alliances. Project site access will require traversing approximately 275 feet of Fish Creek’s bed, left bank, and channel, which includes crews accessing the project location on foot and operation of hand tools. Project activities will require crushing and trampling of herbaceous and subshrub vegetation during access and operations, as well as ground disturbance associated with the anchor removal and installation processes. The project also includes the restoration of all project areas, including the regrading of channel areas back to their pre-project contours where applicable, removal of project generated wastes, and the restoration of channel ecology and morphology upon completion of the project.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Federal
Asbestos Abatement Services
Solicitation # 2031ZA26N00066
The Bureau of Engraving and Printing is conducting market research via a Sources Sought notice to identify qualified small business contractors for asbestos-containing material removal services at the Eastern Currency Facility in Washington, D.C. The government intends to establish a three-year Firm-Fixed-Price Blanket Purchase Agreement starting November 22, 2026, with individual task orders issued based on an established pricing schedule. The scope of work involves abatement services within the Main and Annex Buildings, requiring strict adherence to federal and local regulations, including NESHAPS, OSHA, and District of Columbia Municipal Regulations. Contractors must implement rigorous quality control and packaging standards, such as double-bagging waste in 6-mil polyethylene bags and maintaining materials in a wet state. Key deliverables include providing abatement plans and cost estimates within five days of inspection and uploading clearance results to the DOEE Asbestos e-Permitting System within 24 hours of completion. Due to the secure nature of the facility, personnel must obtain access to the Controlled Industrial Area, maintain strict confidentiality, and adhere to stringent security protocols, including the prohibition of weapons on site. Interested respondents must submit a capability statement and specific socioeconomic information by September 25, 2026, to assist the government in determining the final acquisition strategy.
Office Of The Chief Procurement Officer

POSTED

about 13 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS