This Solicitation opportunity from Bowling Green State University - Campus Construction was posted on April 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
9110 REBID - Domestic Water System - BTSU to Williams
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the extension and replacement of an existing waterline system at Bowling Green State University’s active campus area. Specifically, the work includes extending approximately 300 linear feet of 8-inch and 6-inch waterlines east of Lot 7a, passing through the Shatzel tunnel, and reconnecting to an existing 6-inch waterline within the tunnel. Along with the waterline installation, the project requires sidewalk removal and replacement, waterproofing of exposed tunnels, and restoration of landscaping and seeding disturbed during construction. The contractor must ensure the isolation of the work zone from the public due to the active campus environment. Additionally, the contractor is responsible for providing a detailed sequencing plan aimed at minimizing both the number and duration of waterline and utility outages throughout the project. The solicitation is classified under the Bowling Green State University Campus Construction department and is a rebid, with a response deadline set for mid-April 2026. The scope emphasizes maintaining campus safety and operational continuity while upgrading the domestic water system from BTSU to Williams.
General Info
Agency
Place of Performance
Set-Aside
Documents
9AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 6 days
- Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 16 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Full Description
REBID
This work will occur within an active area of BGSU campus. Isolation of the work zone to the public is required. Extension of approximately 300 linear feet of an 8 in and 6 in waterline east of Lot 7a. Waterline extension will traverse through Shatzel tunnel and reconnect to an existing 6in waterline in a tunnel. Waterline replacement inside of the existing tunnels at point of relocated waterline. Sidewalk removal and replacement for installation of waterline will be required. Tunnels exposed will be waterproofed. Landscaping and seeding impacted will be replaced.
The Contractor will be required to provide a detailed sequencing plan to limit the number and duration of waterline and utility outages.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS