Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on January 7, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

99 -- Remove existing drywall ceiling and mold, re-apply/spray insulation on duct work,and install new drop ceiling

Closed
21082887S1CEILINGFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

238310 - Drywall and Insulation Contractors

Place of Performance

USCG Sector Key West (Barracks)100 Trumbo Point RD Key West, FL 33040, VA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → LOG-9
Contacts1 person available
OfficeNORFOLK, VA, 23510, USA
Office AddressNORFOLK, VA, 23510, USA

Full Description

Show more
UEPH Ceiling Repair 1. SCOPE 1.1. Scope. This work item describes the requirements for the Contractor to remove UEPH lobby ceiling, insulate ventilation system, and install new drop ceiling. 2. APPLICABLE DOCUMENTS (a) State of Florida Building Codes, 2004 Edition with revisions. 3. REQUIREMENTS 3.1. General. The Contractor shall remove existing drywall ceiling in the UEPH Lobby, clean all active mold from all surfaces, spray insulate all duct work, and install new drop ceiling. The ceiling is 8ft high above the floor and covers approximately 600 sq ft. Each process listed here must be inspected and approved by the Contract Officer Technical Representative (COTR). 3.1.1 Notification. Give written notification to the COTR, forty-eight hours before starting work. 3.1.2 Additional protective covering. All work areas will be protected to prevent damage to all adjacent walls, equipment and floors. 3.2 Interferences. Interferences include, but are not limited to; overhead wiring and piping. 4. QUALITY ASSURANCE 4.1 Visual inspection. After completion of work and at the presence of Coast Guard Inspector, the Contractor will visually inspect the finished product as designated by the Coast Guard Inspector. 4.2 Operational test. The Contractor shall demonstrate proper operation of all disturbed systems and ensure all ducts do not collect condensation for a minimum of 48 hours before installation of new drop ceiling. 5. LOGISTICS 5.1. Lodging. 5.1.1. Contractors are responsible for all contractor and sub-contractor lodging for the duration of the work item. 5.2. Storage. 5.2.1. Government will furnish one approximately 10x10? storage area designated by the COTR for storage of tools and equipment needed onsite for the duration of the project. 5.3. Parking and Gate Passes 5.3.1. Coast Guard COTR will designate ?ONE? parking area for a large box style van or smaller vehicle to be used for the duration of the project, other parking spaces can be used temporarily for dropping off or picking up supplies, equipment, or materials on an as needed basis. Additional parking will be available for up to six additional vehicles in the Long Term Parking area near the CG Base entrance beside Building 48. 5.3.2. All vehicles that will drive onboard Government Property must have a valid permit, and insurance. Vehicles must be registered with US Coast Guard Sector Engineering Office prior to any attempts to drive on base. 5.3.3. All personnel that will be working on-board US Coast Guard Property must be registered and assigned passes through the NAVY Security Office. Request for passes must be initiated through the US Coast Guard Sector Engineering Office. 6. REPORTS 6.1. Progress Reports and Change Requests. 6.1.1. The contractor shall designate a time once per week to provide progress reports to the Coast Guard COTR. 6.1.2. The contractor shall provide Condition Found Reports either electronic or on paper to the Coast Guard COTR prior to conducting any additional work not described in the scope of work provided. COMPLETION DATE: Timeframe: This job is to be completed as soon as possible, with a commence date on or around 30 January 2008. SITE VISIT can be scheduled during the week of 14-18 January, 2008. To schedule a site visit during this time please call CWO Kevin Mckenna @ (305) 295-1445. You may contact the US Coast Guard Sector Engineering Office for information concerning this scope of work, Gate and Parking Passes, and clarification during the project. Hours of operation for the US Coast Guard Sector Engineering Office are 0730 through 1530. (7:30 am to 3:30 pm). Phone (305) 295-1445 CWO Kevin McKenna Fax (305) 292-8770

More opportunities from Department Of Homeland Security → LOG-9

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS