This Pre-Solicitation opportunity from Department Of The Interior was posted on June 13, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

A-E Phased Modernization Study & Concept Design

Awarded
140G0119Q0160Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 10 hours ago

DEADLINE

in 16 days

General Info

Contract Value

$198,332.92

NAICS

541330 - Engineering Services

Place of Performance

VA

Set-Aside

SBA

Awardee

STRANG INC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Ofc Of Acqusition Grants-National
ContactsNo contacts available
OfficeRESTON, VA, 20192, USA
Office AddressRESTON, VA, 20192, USA
ContactsNo contact information available

Full Description

Show more
Amendment 0001 to Request for Qualifications (06/13/2019) NOTE: The page limit for the submission is increased to 35 pages. Questions and Responses: 1. Do the Part II¿s count towards the page limit? No, Part II does not count toward the page limit. 2. Does the small business set aside indicate that only small businesses may respond to this solicitation or that they are favored if they meet this requirement? Only a small business may be awarded this contract. 3. Will this contract: a) have the ability to carry over into the design and construction for the winning firm, or b) preclude the winning firm from pursuing the design and construction phase work. a. This specific contract will not have the ability to carry over into the design and construction. b. The awardee of this contract will not be precluded from competing for the design and construction phase A-E services. 4. With the Part I and II Forms, cover letter and front and back covers are these all included in the response or are they excluded from the page limit? Part I and cover letter are included in the page limit. Part II is not included in the page limit. 5. Is the response limited to 25 pages meaning 50 faces (front and back) of each page? Is the response limited to 25 faces? The page limit applies to page faces that include text. If a page does not include text (i.e. the back side of a page with text), it does not count toward the page limit. The Department of Interior, U.S. Geological Survey (USGS) has a requirement for A-E Services to perform a Phased Modernization Study at National Wildlife Health Center (NWHC), Madison, WI. See the Statement of Work below for a description of the NWHC and the A-E services required. This notice is an invitation for all eligible A-E firms who have the qualifications required to perform the work to submit a completed SF 330. The associated solicitation number is 140G0119Q0160. This requirement is being issued as set aside for small business competition. The applicable North American Industry Classification System (NAICS) code is 541330. The associated small business size standard is $15.0M. There is not an incumbent contractor. USGS intends to award a firm fixed price purchase order under the Simplified Acquisition Threshold for this requirement. All A-E firms responding to this announcement shall submit a completed SF 330. Please provide your firm's DUNS number on the form. All contractors doing business with the Government are required to be registered in the System for Award Management (SAM). For additional information, or to register with SAM, access http://www.sam.gov. All A-E firms responding to this announcement will be evaluated on the following criteria: 1. Specialized experience and technical competence in the type of work required. Provide the following information: a. Experience designing research laboratories with significant specialized expertise in laboratory programming, planning and design. b. Experience in research laboratory design, biocontainment design including BSL-3, BSL-3Ag, Vivaria and support facilities dedicated exclusively to scientific investigation and research on wildlife diseases. c. Experience designing facilities inspected by the Centers for Disease Control and Prevention (CDC) and US Department of Agriculture (USDA) Federal Select Agent Program (FSAP), including familiarity with AAALAC accreditation requirements. d. Experience with campus master planning and phased replacement facility planning. e. Demonstrated experience in developing conceptual budgets at the programming, master planning and predesign stages, including total project costs both hard and soft. f. History of designing within budget limitations. g. Cost estimation accuracy, as demonstrated with previous projects of similar size and scope that have been built in the past 3-5 years. h. Experience designing sustainable facilities, maximizing energy efficiency with specialized expertise in the Guiding Principles for Sustainable Federal Buildings and green building systems. Firms shall validate their sustainable abilities and practices through completed construction projects, green building awards, professionals with environmental-related certifications as part of the team, and/or use of innovative green technologies in design. 2. Professional qualifications necessary for satisfactory performance of the required services. Education, training, professional registration, certifications, overall and relevant experience, and longevity with the firm of key management and technical personnel. See Experience criteria in Item 1 and the Statement of Work for the qualifications required. 3. Capacity to accomplish the project in the required time. 4. Past performance on contracts with government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. 5. Geographic location and facilities of the working office(s) which would provide the professional services and familiarity with the area in which the project is located. The Government will not maintain a bidders list for this request for qualifications. However, vendors are strongly encouraged to utilize and review the "Interested Vendors List" tab found on the FedBizOpps website for this notice. Only electronic (contact@example.gov) responses will be accepted. Responses are due on Tuesday, June 25, 2019 at 3:30 pm CDT. Limit submission to no more than 25 pages. Please direct any questions or concerns to contact@example.gov. STATEMENT OF WORK: The U. S. Geological Survey (USGS) has a requirement for Architectural-Engineering (A-E) services. The services provided shall include Biosafety Level 3 (BSL-3) laboratory programming, planning and concept design, campus planning, construction phasing scenario planning, cost estimating and an update to the 2016 master plan. The NWHC completed a Master Plan study in 2016, as a part of this task the A-E shall include a review and update of the 2016 Master Plan with an emphasis on phased construction. THE 2016 MASTER PLAN STUDY WILL NOT BE PROVIDED TO FIRMS FOR THE PURPOSE OF SUBMITTING QUALIFICATIONS. THE STUDY WILL BE PROVIDED TO THE SELECTED FIRM. The A-E shall demonstrate extensive specialized expertise with facility programming, planning and design of BSL-3 laboratories, animal research facilities, research laboratories and office space, along with significant experience with campus planning and phased construction projects. The services to be provided: 1. Lab / Office Space Programming and Planning. 2. Concept Design and Campus Planning. 3. Construction Phasing Scenarios and Cost Estimating. I. BACKGROUND The NWHC is the only federal BSL-3 facility dedicated exclusively to scientific investigation and research on wildlife diseases that threaten human, animal, and environmental health. It is designated by the Department of the Interior (DOI) as a USGS mission essential facility and is also registered with and inspected by the Centers for Disease Control and Prevention (CDC) and US Department of Agriculture (USDA) Federal Select Agent Program (FSAP), the only facility in DOI with this designation. Built in approximately 1960, the NWHC is reaching the end of its usable life and requires replacement to meet current biosecurity requirements for work with highly infectious diseases and select agents (pathogens with potential to be weaponized against humans or livestock). The current enhanced BSL-3 laboratories are at risk for no longer meeting biosecurity requirements for the most harmful diseases and the original design of the building does not meet best practices for a modern high-level biocontainment facility. If not replaced within the next 5-10 years the laboratory may lose its FSAP registration, and DOI will lose the ability to conduct nationally and internationally important work on detecting, characterizing, monitoring, preventing, and controlling wildlife diseases, many of which can jump to livestock or humans. This project will support the DOI goals of reducing deferred maintenance, addressing major infrastructure needs, and enhancing the Department's capability to address safety and security concerns related to infectious wildlife diseases and their possible use as bioterrorism agents. When implemented, the project will address one of the highest USGS facility needs. The goal is to modernize the NWHC through the construction of replacement facilities using a phased approach. The modernized facility will include start-of-the-art BSL-3 laboratories, that support USGS and the Center¿s mission of research and surveillance on economically and ecologically harmful wildlife diseases. Phased Approach to Modernization The NWHC has conducted three master plans and business case analyses to explore the most feasible, cost-effective and least disruptive option for modernization, including comparing renovation versus new construction, owned versus leased facilities, and options for relocation. All studies have indicated that new construction on the current site is the most cost-effective option that minimizes disruption to continuity of operations. These studies have also calculated and verified the space needs for the modernized facility. The projected future space needs will be reviewed and revised as needed to align with proposed phasing strategies and confirmed as part of this study. A phased approach has the advantages of aligning with budgetary cycles and allowing for operations to continue while construction is ongoing. As outlined in the previous master plans the major space needs and costs (based on FY20 project costs) are outlined below. This study will include a comprehensive update of these costs based upon the space program and new phasing scenarios; ~$9 million in miscellaneous costs for pre-design and design. ~$25 million for enhanced BSL-3 laboratories. ~$11 million for enhanced BSL-3 necropsy suite. ~$3 million for BSL-2 biological support. ~$14 million for enhanced BSL-3 animal holding facility. ~$19 million for BSL-3 Ag animal holding facility. ~$11 million for office, office support space and warehouse. ~$9 million in miscellaneous soft costs, including demolition, disposal, and site improvements. Initial phases will be focused on the highest priority BSL-3 facilities. The master plan will describe the overarching concept for modernization of the NWHC using a phased approach, including the required space needs and space connectivity. The plan will also describe the most feasible and logical order for construction based on potential funding streams, mission priorities, current condition of the buildings, and land use. Plans for continuity of operations shall be considered as part of this study. The A-E shall consider cost-effective options for renovation and/or repurposing current space to maximize space usage at the Center. The study shall consider total project costs and propose timelines for design through occupancy of each phase. The 2016 Master Plan report and existing facility drawings are provided as part of this solicitation. Reports, drawings or blueprints are the property of the United States Government. Copying, dissemination, or distribution of these drawings, plans or specifications to unauthorized users is prohibited. Properly destroy documents when no longer needed. THE 2016 MASTER PLAN STUDY WILL NOT BE PROVIDED TO FIRMS FOR THE PURPOSE OF SUBMITTING QUALIFICATIONS. THE STUDY WILL BE PROVIDED TO THE SELECTED FIRM. Period of Performance The period of performance for the phased master plan study is six months from date of award. II. SCOPE OF WORK A. The A-E design team shall review the 2016 Master Plan report and visit the site to examine the existing conditions. B. The A-E shall conduct programming interviews with USGS science and facilities staff to review and validate the space requirements. C. The A-E shall generate phasing scenario concepts, minimum of three (3) for review and approval with USGS science and facilities staff. Concepts shall include campus site plans indicating the scope of each phase of work. D. The design concepts and estimated costs shall comply with the Guiding Principles for Sustainable Federal Buildings and DOI policy. The A-E shall provide a complete list of applicable codes and energy standards, FSAP regulations and current Biosafety level standards. E. The A-E shall meet with the USGS representatives as required to provide a complete program and concept design that will meet all campus planning objectives including but not limited to site utilities capacities and design, parking, vehicle and pedestrian flow, service access, secured access and storm water management. F. The A-E design firm shall provide all relevant A-E disciplines, laboratory expertise, supervision, materials, and any other items necessary for the completion of the design services. G. Attend a minimum of four (4) site visits, to gather information necessary from the existing conditions, conduct user meetings, make presentations and review progress. H. Work with the USGS Project Manager/COR to develop project cost estimates to best suit the phasing needs and funding constraints of the USGS. I. Provide required copies of planning drawings, concept renderings and final report PDF hard and soft copy as directed by the COR. III. ADMINISTRATIVE PROCEDURES (reserved) IV. SUBMITTALS The following submittals will be required: Programming Concept Design and Phasing Scenarios Progress Presentation Pre-final Report Submission Final Report The A-E shall provide Review Documents in hard copy and electronic files in both original (i.e., AutoCAD, MS Word, Excel) format and PDF format. A. First Submittal - Programming This shall be submitted 6 calendar weeks after award. 1. Space list with net and gross square footage 2. Special requirements and site program elements 3. Preliminary cost modeling B. Second Submittal - Concept Design and Phasing Scenarios This shall be submitted 16 calendar weeks after award. 1. Concept floor plans and campus site plan 2. Phasing scenario narratives 3. Design/Construction timelines 4. Cost estimates - design, construction, and other project related soft costs C. Third Submittal - Pre-final Report This shall be submitted 20 calendar weeks after award. 1. Final space and site program 2. Drawings - floor plans, site plans, 3d images as required to illustrate the proposed phased modernization scenarios 3. Phasing scenario narratives 4. Recommended phased modernization plan 5. Cost summary - Total Project Costs, design, construction, and other project related soft costs. D. Final Submittal - Final Report This shall be submitted 24 calendar weeks after award. 1. The A-E shall provide four (4) hard copy files and one (1) electronic files of the Final Report in both original (i.e., AutoCAD, MS Word) format and PDF format.

More opportunities from Department Of The Interior → Ofc Of Acqusition Grants-National

Same awarding agency

NAICS: 238220
Federal
Z--EROS Removal and replacement of chilled and conden
Solicitation # 140G0126Q0288
Request for Quote 140G0126Q0288 is a total small business set-aside issued by the Department of the Interior, USGS/EROS Science Center in Sioux Falls, South Dakota. The project requires a professional firm to remove and replace chilled water, condenser water, and heating water piping serving the 1996 building addition. Key technical requirements include installing a new condenser water network with pumps and VFDs, sizing the chilled water system to support two 1996 York chillers at a maximum capacity of approximately 600 tons, and replacing pneumatic controls in the penthouse with multi-position electric actuators. The contractor must execute the work in phases to ensure that facility offices and computer rooms remain fully operational, and weekend work is prohibited. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, evaluating firm-fixed-price offers for technical acceptability and past performance. The period of performance is scheduled from November 4, 2026, to July 31, 2027, with work expected to be completed within 180 calendar days of award. Compliance with the Davis-Bacon Act for wage determinations and the Buy American Requirement for construction materials is mandatory. Required submissions include a technical approach for phased construction, a completed SF 1442, a detailed bid schedule, and a bid guarantee via SF 24. Final payment is contingent upon the submission of a Release of Claims via Form DI-137.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

14 days ago

DEADLINE

in 7 days
View Details
NAICS: 541990
Federal
D--Intent to Award
Solicitation # 140G0126Q0188
The U.S. Geological Survey intends to award a sole source purchase order to EarthScope Consortium, Inc. for the long-term archiving, curation, and dissemination of continuous Global Navigation Satellite System data generated by USGS-supported monitoring stations, with a period of performance spanning from August 1, 2026, through June 30, 2031, including four one-year option periods. This action is justified under FAR 13.106-1(b)(1) due to EarthScope Consortium’s unique status as the sole nationally recognized, USGS-approved repository for GNSS data that meets the agency’s Fundamental Science Practices requirements for trusted, discipline-appropriate data management. EarthScope operates the GAGE geophysical data facilities, which already provide scalable, production-level infrastructure, standardized workflows, and metadata frameworks used by USGS and other federal and academic partners, eliminating the need for redundant or incompatible systems. The decision follows comprehensive market research that confirmed no other entity can provide equivalent services without prohibitive cost, delay, or fragmentation of data standards. The requirement includes routine annual archiving for active stations and a single ingestion of historical data from a legacy station, with all services delivered through an existing, certified cyberinfrastructure that ensures data integrity and broad accessibility. EarthScope’s established role as the primary national hub for GNSS data, its deep integration with USGS science operations, and its proven compliance with federal data governance policies make it the only viable source for this critical function. The contracting office has determined that competition would be impractical due to the specialized technical, scientific, and infrastructure requirements, and future competitions would only be considered if new repositories are formally recognized as meeting USGS FSP standards or if the agency develops an internally managed archive of equivalent capability. Questions regarding this intent to award must be submitted to the Contract Specialist by June 29, 2026, and the action will proceed under simplified acquisition procedures without soliciting competitive bids.
All Other Professional, Scientific, and Technical Services

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS