This Solicitation opportunity from Department Of Defense was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
AATTC Trailer Reconfiguration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract, titled "AATTC Trailer Reconfiguration," involves a multi-phase project focused on upgrading and modifying trailer facilities at the AATTC site in Saint Joseph, Missouri. The work is divided into three phases: the first phase includes interior upgrades to the South trailers, followed by exterior improvements to those same trailers in phase two. The third phase entails the decommissioning and removal of the North trailer group, alongside repairs to the decking that connected the North and South trailer groups, construction of new guardrails and stairs on the decking, and removal of cameras, wiring, skirting, and lockable access panels from the North trailers. This solicitation, designated under the NAICS code 236220, is a total set-aside for small businesses and is managed by the Department of Defense office located in Saint Joseph, Missouri. The posted date for the solicitation is January 9, 2026, with a response deadline of January 27, 2026. Primary and secondary contacts for the project are MSgt Amanda Glise and Adam D. Danner, respectively. The contract encompasses facility upgrades and structural modifications critical to improving and consolidating the trailer setup at the base.
General Info
Place of Performance
Saint Joseph, MO, 64503, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
AATTC North and South Trailer Reconfiguration
Phase 1 involves interior facility upgrades to AATTC South trailers.
Phase 2 focuses on exterior facility upgrades to the AATTC South trailers.
Phase 3 - Decommission and remove North trailer group.
09 Jan 2026 - Added missing document.
21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time.
22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work.
Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026.
28 Jan 2026 - Uploaded Solicitation W50S7G26RA0050002 conformed, Amendment 0002, Revision 02 of the Statement of Work, Question and Answers dated 28 January 2026 and three photos (decking north trailer side, decking south trailer side and additional floor box). *** NOTE: Solicitation W50S7G25RA0050002 Conformed contains revised contract line item descriptions for proposal pricing.***
29 Jan 2026 - Uploaded Sign-in sheet from the Site Visit held on January 27th, 2026. Uploaded an informational drawing for the south trailer group, "ULYB262003 South Trailer Group First Floor Plan"
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
