Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Presolicitation opportunity from Government of Canada was posted on March 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ACAN - Building Automation System (BAS) Controller Upgrade

Closed
25-58297International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Inland Empire Job Corps-Request for Quote Electrical Repairs
Solicitation # Inland Empire Job Corps Electrical Repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform electrical and fire alarm repairs at the Inland Empire Job Corps Center in San Bernardino, California. Under NAICS code 238210, the scope of work includes installing GFCI protection in cafeteria and academic areas, repairing open-ground conditions, installing filler plates in panelboards, and updating circuit directories and feeder labeling for multiple panelboards. All work must comply with National Electrical Code (NEC), NFPA, and applicable federal, state, and local regulations. The contract is a fee-for-service arrangement requiring a lump sum bid, and performance is subject to Service Contract Labor Standards wage determinations for Riverside and San Bernardino counties. Interested offerors must submit a bid sheet, a completed supplier packet including Form W-9 and self-certification, three professional references for similar projects, and proof of insurance by 3:00 PM PT on November 12, 2026. The opportunity is open to various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone, with required SBA certification letters for those claiming specific statuses. Award selection is based on best value as determined by MTC. Successful contractors must maintain general liability insurance of at least 1,000,000 dollars and worker's compensation with employer's liability of 500,000 dollars, while adhering to strict federal guidelines regarding information security, the Buy American Act, and the prohibition of trafficking in persons.
Inland Empire Job Corps

POSTED

about 2 hours ago

DEADLINE

in 3 days
NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project requires the installation of emergency shut-off switches on power tools in the Maintenance and Glazing shops located in Edinburgh, Indiana. Specifically, the contractor must install mushroom-head push-button switches and new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panels with 60A shunt-trip main circuit breakers in both shops. All installations must include a minimum of 30% spare branch breakers and a manual reset function following power failures. Work must comply with FNC guidelines, national building codes, and EPA and OSHA regulations, with Indiana state regulations prevailing if more stringent. The procurement is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. A mandatory site visit was scheduled for November 10, 2026, and proposals are due by November 20, 2026, via email to Tammy Swallows. Bidders must submit a single lump sum contract bid and provide a valid Indiana Contractor's License, W9, and certification of compliance with Davis Bacon Act wage rates. Award will be based on best value, evaluated by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Contractors are required to maintain specific insurance coverages, including general liability of at least 1 million dollars per occurrence and automobile liability. Payment terms are Net 30. Upon receiving a Notice to Proceed, the contractor has 10 days to provide a sequenced construction schedule. The contract includes a one-year workmanship guarantee starting from the date of substantial completion. Final acceptance requires a walk-through and the correction of any punch list items within 14 days.
Atterbury Job Corps. – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The project scope encompasses three primary areas: performing visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices to improve safety during collection, and conducting oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems, assess monitoring instrumentation, develop preventive maintenance checklists, and provide on-site training for agency staff. All work must be performed at designated agency facilities in Rancho Cucamonga and Chino, adhering to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards. The agency intends to make a single award to the most capable and cost-effective offeror. Evaluation criteria include a proven track record of at least two similar projects within the last five years, personnel qualifications, the proposed staffing plan, and the ability to meet the project timeline. Proposals must be submitted electronically via the PlanetBids portal by December 23, 2026, and must include a comprehensive set of documents, including a company profile, project methodology, and various certifications such as a Non-Collusion Statement and Workers Compensation Certificate. Payment will be processed electronically via ACH within 30 days of invoice approval by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project, with an estimated value between $25,000 and $100,000, requires a qualified electrical contractor to inspect, repair, and certify emergency lighting systems in accordance with NFPA 101 (2024 Edition), NFPA 70, and OSHA regulations. Key deliverables include the application of durable tracking labels to each fixture and the integration of fixture data and a recurring 30-day functional testing schedule into the facility's Computerized Maintenance Management System. Bids are due by December 1, 2026, and will be awarded based on overall best value. Mandatory requirements for submission include a physical site visit, a signed bid form, and a detailed cost breakout. For bids of $25,000 or more, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The contract is subject to the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and FAR standards regarding work hours, safety, and small business certifications. Compliance with Executive Order 13706 for paid sick leave and strict records management per DOL 2018-03 is also required.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 22 days
NAICS: 238210
New
SLED
Audio & Visual Project
Solicitation # 27-4090-01
Burnet County is soliciting sealed bids for solicitation number 27-4090-01 to provide and install audio and visual equipment for the District and County Court at Law courtrooms. The project requires the contractor to furnish all labor, materials, equipment, and supervision to implement sound and visual presentation systems. Key technical specifications include control processors with a preferred capacity of 16 inputs and 8 outputs, sound and video control panels for the judge, the bench, and the bailiff, and a dedicated output for the court reporter. The successful bidder must commence work within ten calendar days of the contract execution. The contract will be awarded to the lowest responsible bidder based on factors including purchase price, vendor experience, quality of goods, safety records, and the total long-term cost to the county. Bidders must submit a bid bond for five percent of the contract amount, and performance and payment bonds are required for contracts exceeding 100,000 dollars and 25,000 dollars respectively. Compliance requirements include the Texas Ethics Commission Form 1295, certifications regarding non-discrimination against firearm entities for applicable contracts, and verification that the entity is not doing business with prohibited foreign organizations. Responses must be submitted by November 24, 2026, to the Burnet County Purchasing Office.
BURNET COUNTY

POSTED

about 11 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The National Research Council of Canada seeks to upgrade its building automation systems across 75 buildings within the National Capital Region to the Schneider EcoStruxure platform. Currently, there are approximately 21,400 control points monitored under the legacy Andover Continuum system, which has reached the end of its life. The upgrade aims to consolidate all control points into a unified EcoStruxure platform to ensure system compatibility and uninterrupted service, as most buildings have already transitioned to this system. The contract requires authorized suppliers to replace Andover components such as Netcontroller servers, IOU modules, and TCX and SCX controllers with Schneider equivalents, recreate key system functionalities including user groups, graphics, alarms, and reporting, and integrate with various third-party systems. Post-deployment verification and decommissioning of the old controllers are also part of the scope. Ainsworth Inc., located in Ottawa, has been pre-identified as a potential supplier, but other qualified suppliers may submit statements of capabilities by the March 20, 2026 deadline. The contract duration is set for two months, from March to May 2026, with the work centered on the site at M24-D, 1200 Montreal Rd, Ottawa. The project emphasizes collaboration with Schneider Electric’s technologies and integration expertise, ensuring that the upgraded BAS supports existing infrastructure and future operational needs. The National Research Council of Canada manages the solicitation, and interested suppliers must demonstrate their authorization and technical capacity to deliver the required upgrades in compliance with detailed specifications.

General Info

NRC seeks suppliers to upgrade 75 buildings' automation to Schneider EcoStruxure by May 2026.

Documents

2
PDF, High priority: read this first3 pages · acan
High
PDF, High priority: read this first4 pages · presolicitation
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline time changed from 7:00 PM UTC to 2:00 PM UTC on Mar 20, 2026. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → National Research Council of Canada
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Abeera AkramPoint of Contact

Full Description

Show more
Background: The National Research Council of Canada (NRC) operates 76 buildings across 5 sites in the National Capital Region (NCR): Montreal Road Campus, Sussex, Uplands Campuses, Greenbank and Carleton Place. These buildings are primarily monitored and controlled under the Andover Continuum Building Automation System platform. There are approximately 21,400 total control points in the NCR, of which 18,558 control points across 75 buildings have been upgraded to the Schneider EcoStruxure platform in conjunction with an additional 290 points of the 301 utility sub-metering points now managed under the EcoStruxure Power Monitoring Expert platform. The Andover Continuum Building Automation System Platform, proprietary to Schneider Electric system, is a legacy platform and has reached the end of its life. To ensure ongoing system compatibility and interoperability with the existing NRC infrastructure while removing potential disruptions in service, NRC wishes to issue a contract to upgrade all control points within the Continuum Platform to a consolidated system under the Schneider EcoStruxure platform. The new system must be compatible with EcoStruxure, proprietary to Schneider Electric system, to ensure compatibility with the majority of buildings that are already operating on the Schneider EcoStruxure platform. Any interested supplier must demonstrate by way of a statement of capabilities that it meets the following requirements: - Authorized Partner for Schneider Electric’s Building Automation System EcoStruxure Solution, EcoStruxure Lite Solution, TAC I/A, Barber-Coleman, Andover Continuum and Field Devices portfolio (Invensys, Barber Colemen, valves, actuators etc.) to deliver and install the required upgrades to building M24-D, 1200 Montreal Rd, Ottawa. - Be able to replace Andover Netcontroller servers with Schneider AS-P Automation servers and integrate into existing BAS. - Be able to replace Netcontroller Input/Output Units (IOU) modules with Schneider AS-P IOU modules. - Be able to replace Andover TCX and SCX controllers. - Re-create: Users Groups (Administration), Graphics, Trend groupings and charts, Alarm, objects, Schedules, demand response programs, energy metering/power manager, report manager functions. - Integration to 3rd-party systems. (ABB, Accutrol, Aircuity, Belimo, Carel, Daiken, Danfoss Drives, FieldServer, JCI, McQuay, Mestek, Onicon, Phoenix Controls, Price, Reliable Controls, Schneider Electric, etc). - Post deployment verification and commissioning of proper operation of each field controller. - Decommissioning of existing Andover Netcontroller and BCX controllers. Name and address of the pre-identified supplier: Ainsworth Inc. 69 Auriga Drive, Ottawa, Ontario K2E 7Z2 Suppliers who consider themselves fully qualified and available to provide the goods, services or construction services described in the ACAN may submit a statement of capabilities in writing to the contact person identified in this notice on or before the closing date of this notice. The statement of capabilities must clearly demonstrate how the supplier meets the advertised requirements. The proposed contract is for a period of 2 months, from March 2026 to May 2026.

More opportunities from Government of Canada → National Research Council of Canada

Same awarding agency

NAICS: 238140
New
International
Masonry Conservation S-77 Sections A and B
Solicitation # 26-58147
The National Research Council Canada is soliciting bids for masonry conservation services at Building S-77, located at 100 Sussex Drive in Ottawa. The project focuses on restoring the building envelope and preventing further deterioration of the facade, which primarily consists of Wallace sandstone with a Scotstown granite pedestiment. The scope of work includes stone descaling, repointing of the parapet and floors 1 through 3, stone resetting, and conservation of the exterior face of original multi-lite steel casement windows, along with localized repairs to sealant and flashing. The estimated contract value ranges from 500,001 to 2,000,000 dollars. The contract will be awarded to the responsive bidder with the lowest price following a two-step evaluation process consisting of a pass/fail technical review and a subsequent financial evaluation. Bidders must provide a technical submission and a financial submission, including bid security, a list of subcontractors, and certifications for Canadian materials. Awarded contractors are required to provide performance and labour and material payment bonds, as well as proof of insurance. Performance will be monitored based on workmanship, project management, and health and safety standards, with unsatisfactory results potentially leading to the suspension of future bidding privileges. All materials must be handled and stored according to strict quality and weather protection standards, and the contractor is responsible for all transportation costs.
Masonry Contractors

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 333517
New
International
Purchase of a Dual Laser Cutter/ Engraver
Solicitation # 26-58199
The National Research Council of Canada is soliciting offers for the purchase of a dual laser cutter and engraver to support prototyping activities involving the cutting of large plastic sheets and the engraving of plastics, painted metals, and bare metal parts. The required system must feature a material processing bed of at least 900mm x 600mm, an enclosed and interlocked processing area, an aluminum grid cutting bed, and a vacuum table bed. Key performance specifications include a positional accuracy of 10 micrometers or better, an engraving speed of at least 4000 mm/s, a vision system for fiducial alignment with 100um precision, and a standalone HEPA/activated carbon air-filtration unit with a minimum flow capacity of 850 cubic meters per hour. The equipment must be compatible with a 240V outlet and possess CSA or equivalent electrical certification. The contract term is established from January 1, 2024, through December 31, 2027, with all deliverables due by March 31, 2027. Delivery is governed by Incoterms 2020 DAP Ontario. Award selection is based on the lowest evaluated price among offers that meet all mandatory technical criteria. Proposals must be submitted electronically as two separate attachments, a Technical Offer and a Financial Offer, with a maximum email size of 10MB. Payments will be processed via the Receiver General for Canada within 30 days of receiving an undisputed invoice. The contractor is responsible for all insurance costs and must comply with environmentally preferable packaging standards and integrity verification requirements.
Machine Tool Manufacturing

POSTED

1 day ago

DEADLINE

in 24 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS