This Special Notice opportunity from Department Of Defense was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ACC002 Utilities and Infrastructure

Closed
W911KB269A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, piping and fittings, traffic control, demolition, and preconstruction video services. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the project bid documents and specifications provided via the Inland Empire Utilities Agency bidding website.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence through a voluntary Request for Information to gauge industry interest and capability for the Phase I of the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson, Alaska. This multi-hundred-million-dollar project involves massive civil earthworks totaling approximately 10 million cubic yards, installation of a new 20 MVA electrical substation, comprehensive utility networks for over 25 future buildings, and construction of heavy-duty airfield pavements, a dedicated airfield lighting vault, and a new POL tank farm with truck fill stand. The acquisition will be executed under Other Transaction Authority (10 U.S.C. § 2808a) using a Construction Manager at Risk (CM@R) delivery model, distinct from traditional contracting, to enable flexibility in adopting innovative construction technologies and fast-track execution. The estimated total project value ranges between $400 million and $600 million, with a phased approach beginning with preconstruction services and transitioning to construction upon agreement on a Guaranteed Maximum Price. Respondents are expected to provide detailed insights into their technical capabilities, particularly regarding innovative materials and methods that could enhance resilience, reduce cost, or accelerate delivery, as well as their prior experience with OTAs and CM@R processes. The government is specifically interested in understanding how collaborative preconstruction engagement, open-book pricing, phased bonding, and flexible payment milestones can improve outcomes on large-scale infrastructure in challenging environments like Alaska. Key questions address risk allocation, compensation structures if the project “off-ramps” before construction, data rights ownership, long-lead item procurement strategies, supply chain constraints in the region, and subcontractor integration models. The Alaska District is evaluating whether the CM@R-OTA combination offers advantages over traditional procurement and seeks feedback on bonding timelines, funding gap mitigations, and market conditions that may affect responsiveness. All responses must be submitted by July 24, 2026, to the designated points of contact, with no obligation or reimbursement provided to participants, and participation does not guarantee future eligibility for a solicitation.

General Info

U.S. Army seeks industry input for $400M–$600M CM@R-OTA infrastructure project in Alaska with innovative construction methods.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

EARECKSON AS, AK, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Alaska
Contacts2 people available
OfficeANCHORAGE, AK, 99506-0898, USA
Office AddressANCHORAGE, AK, 99506-0898, USA

Full Description

Show more

REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE


Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future.



NAICS Code: 237110 – Water and Sewer Line and Related Structures Construction
(Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.)



Small Business Size Standard: $45 Million


PROJECT OVERVIEW
The U.S. Army Corps of Engineers (USACE), Alaska District, has a requirement for Preconstruction Services and construction for the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson (JBER), Alaska. This project executes Phase I of a multi-phase recapitalization program to prepare a 500+ acre site and establish the critical civil, utility, and airfield infrastructure. Due to complex topography and concurrent MILCON construction schedules, the work must be highly sequenced to ensure uninterrupted operational capabilities and facilitate staggered facility occupancy dates. Key deliverables may include:


  • Mass Civil Earthworks: Excavation of approximately 10 million cubic yards of material to grade the 500+ acre site.
  • Comprehensive Campus Utilities: Installation of a new 20 MVA electrical substation and utility networks (water, sewer, electrical, communications) for 25+ future MILCON buildings.
  • Airfield & Logistics Infrastructure: Construction of heavy-duty airfield pavements, a dedicated airfield lighting vault, and a new POL tank farm with a truck fill stand.
  • Phased Project Execution: Structured sequencing of utility upgrades and site preparation to allow concurrent facility construction.

Estimated Acquisition Magnitude: $400,000,000 to $600,000,000


Planned Acquisition Strategy: Construction Manager at Risk via Other Transaction Authority (OTA)


The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Construction Manager at Risk (CM@R).


  • Phase 1: Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the project’s scope, constructability, budget, quality, schedule, and in coordination with the Designer of Record (DOR).
  • Phase 2: Construction - Upon reaching an agreed-upon level of design (e.g., 65% to 95%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the construct the facility via alternative methods.

INFORMATION REQUESTED


1. Company Profile:


  • Firm Name, Address, and Point of Contact (Name, Title).
  • Phone Number, Email Address, and Unique Entity ID (UEI).
  • Socioeconomic Status (Large, Small, 8(a), SDVOSB, etc.).

2. Other Transaction Authority (OTA) & Statutory Compliance:


  • Innovative Technologies: The authority for this OTA (10 U.S.C. § 2808a) is focused pecifically designed to bring the fast-paced, iterative, and flexible principles of Other Transaction Authority (OTA), which traditionally governs research and technology prototyping, into the physical infrastructure and military construction (MILCON) domain. Describe any innovative materials, methods, or technologies your firm could propose for a project of this scale that could lead to cost savings, schedule acceleration, or enhanced facility performance and resilience.
  • OTA Experience: Describe your firm's previous experience (if any) executing prototype projects under an OTA.
  • Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies on traditional military construction projects? How could the flexibility of an OTA help overcome these barriers?
  • What project characteristics make CM@R-OTA particularly advantageous or disadvantageous for this requirement?

3. Construction Manager at Risk/ Early Contractor Involvement:


  • Baseline Definition: Delivery method in which a construction manager (CM) is engaged early in the project to provide preconstruction services, including cost estimating, scheduling, and constructability reviews. 
  • Collaborative Framework: What collaborative mechanisms encourage close cooperation between the owner, CM, and design team, which can minimize costly redesign and delays.
  • Describe your experience executing CM@R or other highly collaborative delivery methods.
  • How do you approach "open-book" pricing and transparency during Phase 1 (Pre-Construction) to build trust and ensure the Government is receiving fair market value?

4. Guaranteed Maximum Price (GMP), Risk Allocation & Compensation:


  • Phase 1 Off-Ramp Risk: If the Government and the contractor cannot reach an agreement on the GMP or final design (the "off-ramp"), what specific compensation structures (e.g., stipends, time-and-materials for design effort) would adequately compensate your firm for pre-construction efforts?
  • Payment Milestones: Because an OTA allows for flexible payment structures, what milestone payment arrangement during Phase 1 (e.g., monthly progress, completion of design percentages, deliverable-based) best supports your firm's cash flow and resource allocation?
  • Data Rights: Under an OTA, data rights and intellectual property can be negotiated. What data rights structure for the final design deliverables (if an off-ramp is taken) would provide a fair balance between the Government's need to construct the facility and your firm's proprietary design methods?
  • In your experience with CM@R, at what design milestone (e.g., 35%, 65%, 95%) is it most advantageous to lock in the GMP for a complex airfield and utility infrastructure, and why?
  • How do you handle the procurement of long-lead items (e.g., switchgear, specialized fire pumps, large span steel) prior to establishing the final GMP?
  • What level of cost growth would you typically expect between conceptual planning and GMP establishment?

5. Horizontal Utilities and Infrastructure Construction Expertise:


  • Describe your specific experience with airfield development projects of similar size and complexity, including heavy utility and power infrastructure, large-scale grading, and specialized airfield & fueling assets.
  • What are the greatest supply chain, scheduling, or technical risks you foresee for a project of this type at JBER, and how would the CM@R delivery method help mitigate them?
  • Are there specific trades, materials, equipment, or subcontractor resources in the JBER/Alaska market that are currently constrained?
  • Would early contractor involvement through CM@R materially improve the Government’s ability to manage these market risks? Why or why not?

6. Teaming & Subcontractor Integration:


  • Under a CM@R model, how and when do you plan to on-board your critical subcontractors (e.g., Electrical, POL)?
  • Will you compete these subcontracts openly during Phase 1, or do you prefer bringing in established partners from day one?

7. Feedback on the Acquisition Strategy & Alternatives:


  • Does the proposed CM@R-OTA strategy incentivize your firm to participate? Why or why not?
  • Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better site infrastructure, faster delivery, or lower cost?
  • Have current market conditions increased the value of collaborative delivery methods compared to traditional procurement methods? If so, how?

8. Bonding Capability:


  • Phased Bonding Approach: Would a phased bonding structure—where the contractor is only required to bond the value of the Phase 1 effort initially, and construction bonds are deferred until the execution of Phase 2—effectively mitigate this risk?
  • Surety Timelines: If construction bonds are deferred to Phase 2, what is the maximum duration your surety would hold a commitment open between the finalization of the GMP and the Notice to Proceed for construction?
  • Funding Gap Mitigations: If funding for construction is delayed beyond an anticipated window (e.g., 90-180 days post-design completion), what mechanisms (e.g., formalized escalation clauses, right to off-ramp without penalty) would your firm require to maintain the agreement?
  • Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture.

SUBMISSION INSTRUCTIONS: Please email your responses in PDF format to Jason Linn at contact@example.gov and Theresa Afrank at contact@example.gov by 24 July 2026 at 2:00PM Alaska Time. 

More opportunities from Department Of Defense → W2SN Endist Alaska

Same awarding agency

NAICS: 236220
New
Federal
ACC003 Weapons Generation Complex and Northern Flightline
Solicitation # W911KB27RWP01
The U.S. Army Corps of Engineers, Alaska District, is soliciting a Design-Build Team for the ACC003 Weapons Generation Complex (WGC) and Northern Flightline project at Joint Base Elmendorf-Richardson, Alaska. This initiative is part of the broader Fighter Town Recapitalization (FTR) Program, which aims to modernize and expand infrastructure while maintaining active airfield operations. The scope involves the construction of approximately sixteen new facilities, including hangars, operations buildings, and munitions storage magazines, as well as the demolition of legacy WGC facilities. A critical requirement is that the new WGC must be operational before the existing facility is decommissioned to ensure zero operational downtime. The project will be executed on pre-excavated sites with preconstructed utilities and is expected to be completed by the end of Fiscal Year 2032. This procurement is conducted as an Other Transaction (OT) Agreement under Title 10 U.S.C. 2808a, meaning it is not subject to the Federal Acquisition Regulation (FAR) unless expressly incorporated. The project utilizes a Progressive Design-Build (PDB) delivery model divided into two phases: Phase 1 focuses on design and preconstruction services, while Phase 2 covers final design, procurement, and construction. Selection is based on a qualifications-based approach involving a two-step process: a White Paper evaluation focusing on scale, complexity, cold-weather experience, and personnel qualifications, followed by Pitch Presentations evaluating conceptual execution, risk mitigation, and resource capability. Award may be a single whole-scope contract or split between two offerors.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
Federal
(EAR048) Repair Fire Alarm System Eareckson Air Station Facilities
Solicitation # W911KB27RWP12
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence for the site-wide repair and replacement of fire alarm systems at Eareckson Air Station on Shemya Island, Alaska. The project involves upgrading approximately 45 buildings by replacing antiquated, non-compliant systems with a standardized wireless or hybrid addressable architecture, specifically utilizing Monaco systems. This initiative aims to meet UFC 3-600-01 and NFPA 72 requirements while reducing reliance on buried fiber optic infrastructure. Key technical challenges include ensuring the system can withstand sub-arctic maritime conditions, such as hurricane-force winds and high salt-spray corrosion, and operating without interference from high-power military radar and telemetric systems. The estimated acquisition magnitude is between 27 million and 33 million dollars, with an anticipated performance period spanning fiscal years 2027 through 2030. The government intends to utilize a Progressive Design-Build delivery method via Other Transaction Authority under 10 U.S.C. section 2808a. The project will be executed in two phases: an initial design and pre-construction phase to refine requirements and develop a Guaranteed Maximum Price, followed by a construction phase authorized in staggered packages to minimize operational impact on the remote installation. This Request for Information is for market research purposes only and does not constitute a formal solicitation.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS