ACC002 Utilities and Infrastructure

Active
W911KB269A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence through a voluntary Request for Information to gauge industry interest and capability for the Phase I of the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson, Alaska. This multi-hundred-million-dollar project involves massive civil earthworks totaling approximately 10 million cubic yards, installation of a new 20 MVA electrical substation, comprehensive utility networks for over 25 future buildings, and construction of heavy-duty airfield pavements, a dedicated airfield lighting vault, and a new POL tank farm with truck fill stand. The acquisition will be executed under Other Transaction Authority (10 U.S.C. § 2808a) using a Construction Manager at Risk (CM@R) delivery model, distinct from traditional contracting, to enable flexibility in adopting innovative construction technologies and fast-track execution. The estimated total project value ranges between $400 million and $600 million, with a phased approach beginning with preconstruction services and transitioning to construction upon agreement on a Guaranteed Maximum Price. Respondents are expected to provide detailed insights into their technical capabilities, particularly regarding innovative materials and methods that could enhance resilience, reduce cost, or accelerate delivery, as well as their prior experience with OTAs and CM@R processes. The government is specifically interested in understanding how collaborative preconstruction engagement, open-book pricing, phased bonding, and flexible payment milestones can improve outcomes on large-scale infrastructure in challenging environments like Alaska. Key questions address risk allocation, compensation structures if the project “off-ramps” before construction, data rights ownership, long-lead item procurement strategies, supply chain constraints in the region, and subcontractor integration models. The Alaska District is evaluating whether the CM@R-OTA combination offers advantages over traditional procurement and seeks feedback on bonding timelines, funding gap mitigations, and market conditions that may affect responsiveness. All responses must be submitted by July 24, 2026, to the designated points of contact, with no obligation or reimbursement provided to participants, and participation does not guarantee future eligibility for a solicitation.

General Info

U.S. Army seeks industry input for $400M–$600M CM@R-OTA infrastructure project in Alaska with innovative construction methods.

Agency

Department Of Defense → W2SN Endist AlaskaView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

EARECKSON AS, AK, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Alaska
Contacts2 people available
OfficeANCHORAGE, AK, 99506-0898, USA
Organization / Agency
Department Of Defense → W2SN Endist Alaska
View Agency Profile
Office AddressANCHORAGE, AK, 99506-0898, USA

Full Description

Show more

REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE


Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future.



NAICS Code: 237110 – Water and Sewer Line and Related Structures Construction
(Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.)



Small Business Size Standard: $45 Million


PROJECT OVERVIEW
The U.S. Army Corps of Engineers (USACE), Alaska District, has a requirement for Preconstruction Services and construction for the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson (JBER), Alaska. This project executes Phase I of a multi-phase recapitalization program to prepare a 500+ acre site and establish the critical civil, utility, and airfield infrastructure. Due to complex topography and concurrent MILCON construction schedules, the work must be highly sequenced to ensure uninterrupted operational capabilities and facilitate staggered facility occupancy dates. Key deliverables may include:


  • Mass Civil Earthworks: Excavation of approximately 10 million cubic yards of material to grade the 500+ acre site.
  • Comprehensive Campus Utilities: Installation of a new 20 MVA electrical substation and utility networks (water, sewer, electrical, communications) for 25+ future MILCON buildings.
  • Airfield & Logistics Infrastructure: Construction of heavy-duty airfield pavements, a dedicated airfield lighting vault, and a new POL tank farm with a truck fill stand.
  • Phased Project Execution: Structured sequencing of utility upgrades and site preparation to allow concurrent facility construction.

Estimated Acquisition Magnitude: $400,000,000 to $600,000,000


Planned Acquisition Strategy: Construction Manager at Risk via Other Transaction Authority (OTA)


The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Construction Manager at Risk (CM@R).


  • Phase 1: Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the project’s scope, constructability, budget, quality, schedule, and in coordination with the Designer of Record (DOR).
  • Phase 2: Construction - Upon reaching an agreed-upon level of design (e.g., 65% to 95%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the construct the facility via alternative methods.

INFORMATION REQUESTED


1. Company Profile:


  • Firm Name, Address, and Point of Contact (Name, Title).
  • Phone Number, Email Address, and Unique Entity ID (UEI).
  • Socioeconomic Status (Large, Small, 8(a), SDVOSB, etc.).

2. Other Transaction Authority (OTA) & Statutory Compliance:


  • Innovative Technologies: The authority for this OTA (10 U.S.C. § 2808a) is focused pecifically designed to bring the fast-paced, iterative, and flexible principles of Other Transaction Authority (OTA), which traditionally governs research and technology prototyping, into the physical infrastructure and military construction (MILCON) domain. Describe any innovative materials, methods, or technologies your firm could propose for a project of this scale that could lead to cost savings, schedule acceleration, or enhanced facility performance and resilience.
  • OTA Experience: Describe your firm's previous experience (if any) executing prototype projects under an OTA.
  • Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies on traditional military construction projects? How could the flexibility of an OTA help overcome these barriers?
  • What project characteristics make CM@R-OTA particularly advantageous or disadvantageous for this requirement?

3. Construction Manager at Risk/ Early Contractor Involvement:


  • Baseline Definition: Delivery method in which a construction manager (CM) is engaged early in the project to provide preconstruction services, including cost estimating, scheduling, and constructability reviews. 
  • Collaborative Framework: What collaborative mechanisms encourage close cooperation between the owner, CM, and design team, which can minimize costly redesign and delays.
  • Describe your experience executing CM@R or other highly collaborative delivery methods.
  • How do you approach "open-book" pricing and transparency during Phase 1 (Pre-Construction) to build trust and ensure the Government is receiving fair market value?

4. Guaranteed Maximum Price (GMP), Risk Allocation & Compensation:


  • Phase 1 Off-Ramp Risk: If the Government and the contractor cannot reach an agreement on the GMP or final design (the "off-ramp"), what specific compensation structures (e.g., stipends, time-and-materials for design effort) would adequately compensate your firm for pre-construction efforts?
  • Payment Milestones: Because an OTA allows for flexible payment structures, what milestone payment arrangement during Phase 1 (e.g., monthly progress, completion of design percentages, deliverable-based) best supports your firm's cash flow and resource allocation?
  • Data Rights: Under an OTA, data rights and intellectual property can be negotiated. What data rights structure for the final design deliverables (if an off-ramp is taken) would provide a fair balance between the Government's need to construct the facility and your firm's proprietary design methods?
  • In your experience with CM@R, at what design milestone (e.g., 35%, 65%, 95%) is it most advantageous to lock in the GMP for a complex airfield and utility infrastructure, and why?
  • How do you handle the procurement of long-lead items (e.g., switchgear, specialized fire pumps, large span steel) prior to establishing the final GMP?
  • What level of cost growth would you typically expect between conceptual planning and GMP establishment?

5. Horizontal Utilities and Infrastructure Construction Expertise:


  • Describe your specific experience with airfield development projects of similar size and complexity, including heavy utility and power infrastructure, large-scale grading, and specialized airfield & fueling assets.
  • What are the greatest supply chain, scheduling, or technical risks you foresee for a project of this type at JBER, and how would the CM@R delivery method help mitigate them?
  • Are there specific trades, materials, equipment, or subcontractor resources in the JBER/Alaska market that are currently constrained?
  • Would early contractor involvement through CM@R materially improve the Government’s ability to manage these market risks? Why or why not?

6. Teaming & Subcontractor Integration:


  • Under a CM@R model, how and when do you plan to on-board your critical subcontractors (e.g., Electrical, POL)?
  • Will you compete these subcontracts openly during Phase 1, or do you prefer bringing in established partners from day one?

7. Feedback on the Acquisition Strategy & Alternatives:


  • Does the proposed CM@R-OTA strategy incentivize your firm to participate? Why or why not?
  • Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better site infrastructure, faster delivery, or lower cost?
  • Have current market conditions increased the value of collaborative delivery methods compared to traditional procurement methods? If so, how?

8. Bonding Capability:


  • Phased Bonding Approach: Would a phased bonding structure—where the contractor is only required to bond the value of the Phase 1 effort initially, and construction bonds are deferred until the execution of Phase 2—effectively mitigate this risk?
  • Surety Timelines: If construction bonds are deferred to Phase 2, what is the maximum duration your surety would hold a commitment open between the finalization of the GMP and the Notice to Proceed for construction?
  • Funding Gap Mitigations: If funding for construction is delayed beyond an anticipated window (e.g., 90-180 days post-design completion), what mechanisms (e.g., formalized escalation clauses, right to off-ramp without penalty) would your firm require to maintain the agreement?
  • Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture.

SUBMISSION INSTRUCTIONS: Please email your responses in PDF format to Jason Linn at Jason.Linn@usace.army.mil and Theresa Afrank at Theresa.M.Afrank@usace.army.mil by 24 July 2026 at 2:00PM Alaska Time. 

Similar Contracts

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting the restoration of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build delivery method. This project aims to preserve the integrity of the aging infrastructure by repairing the water main without extensive excavation, leveraging CIPP’s minimal disruption approach to ensure continued service reliability. The work will focus on repairing and lining the existing pipe to extend its operational life, aligning with long-term asset management goals for critical utility systems supporting airport infrastructure. The solicitation is classified under NAICS code 237110 for Water and Sewer Line and Related Structures Construction, indicating the scope is specific to underground utility rehabilitation. Primary point of contact for inquiries is Moraa Omwega, reachable via phone or email, with Ray Moreno serving as the Project Manager. The contract opportunity is currently in the forecast phase with no solicitation number assigned yet, and no details provided on set-aside status or place of performance beyond the general location along the Airport Expressway. Stakeholders are encouraged to monitor the official portal for when the formal solicitation is published and to prepare for bidding according to Design-Bid-Build procedural requirements.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
West Congress (Radam/St. Elmo) Water & WW Pipeline RenewalThe City of Austin is seeking bids for the renewal of approximately 3,404 linear feet of water pipeline and 1,329 linear feet of wastewater pipeline in the West Congress neighborhood, specifically in the Radam and St. Elmo areas. The water pipeline replacement includes 197 linear feet of 6-inch diameter, 1,118 linear feet of 8-inch diameter, and 2,089 linear feet of 12-inch diameter pipe, while the wastewater pipeline will be renewed with 423 linear feet of 6-inch, 754 linear feet of 8-inch, and 152 linear feet of 12-inch pipe. This project is solicited under IFB 6100 CLMC1162, with bids due by August 20, 2026, and the solicitation was published on July 13, 2026. The work is intended to improve infrastructure resilience and service reliability within the neighborhood, with all work to be performed on-site in the designated area. The contract is open to qualified contractors without a specific set-aside designation, and the City of Austin’s Public Works and Transportation Department is managing the procurement. Interested parties should direct project-specific inquiries to Micheal Singleton at 512-974-2979 or micheal.singleton@austintexas.gov, and solicitation-related questions to Steve Cocke at 512-974-7998 or steven.cocke@austintexas.gov. For information regarding small and minority business participation or compliance documentation, contact Donna Powell-Maddox at 512-974-6668 or smbrcompliancedocuments@austintexas.gov. All responses must be submitted through the City’s online procurement portal at the provided link, and bidders are expected to comply with all applicable local regulations and standards for utility construction. The project represents a significant infrastructure upgrade aimed at supporting long-term public health and system efficiency in a high-priority urban corridor.
City of Austin

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Y--NGWSP Turnout BuildingsThe U.S. Bureau of Reclamation, through the Upper Colorado Regional Office of the Department of the Interior, is seeking qualified contractors for the construction of turnout buildings as part of the Navajo Gallup Water Supply Project (NGWSP), with work to be performed across multiple sites including Sanostee, Newcomb, Naschitti, BBN9, Coyote Canyon, Rock Springs, and Window Rock. This presolicitation under solicitation number 140R4026B0002 targets small businesses and seeks market interest prior to issuing a formal contract. The scope includes building and installing precast concrete turnout structures with full foundations, sitework involving buried piping, steel fencing, access roads, gravel surfacing, and drainage systems, along with critical connectivity to existing steel supply and distribution pipelines. Each turnout building must include an identical control system supporting DNP 3.0, Modbus Serial, Modbus TCP, and HART protocols, and a synchronized IP-based digital video surveillance system for remote monitoring. All work must adhere to stringent geotechnical, material, and construction specifications, including compliance with Reclamation Safety and Health Standards, the Architectural Barriers Act, the Americans with Disabilities Act, and federal Buy American requirements, with Alternate 1 of FAR 52.223-3 governing hazardous material identification. Contractors must submit detailed proposals demonstrating bonding capacity, business size and socioeconomic status, and proven experience as a prime contractor on comparable projects. Key personnel—including a project manager, site superintendent, safety representative, and quality control supervisor—must be preapproved and meet specific experience thresholds, with changes requiring 48 hours’ notice and government consent. All materials must be stored, transported, and handled in accordance with manufacturer guidelines and federal regulations, with coating materials restricted to 5-gallon containers and CLSM requiring batch tickets per ASTM C94. CLSM must achieve a 7-day compressive strength between 50 and 150 lb/in², with 70% of test cylinders exceeding 75 lb/in², while surface coatings must pass rigorous ASTM tests for abrasion, impact, adhesion, salt fog/UV exposure, and cathodic disbondment. Documentation deliverables include as-built drawings, operations and maintenance manuals, final bills of materials, and test certifications, all submitted via electronic invoicing through the Contract Document Management System. Proposals are due by August 12, 2026, and must be emailed to the contracting specialist
Upper Colorado Regional Office

POSTED

about 21 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
Federal
Z--PARK CENTER WELL VALVE REPLACEMENTThe Bureau of Land Management is seeking a qualified small business contractor to perform emergency repairs on the Park Center Well in Colorado, specifically to replace the failed primary and secondary control valves and modify the manifold piping to enable future rig connectivity. This solicitation, numbered 140L1726Q0022, is a Total Small Business Set-Aside under NAICS code 237110 with a size standard of $45 million, requiring all offerors to be certified as small businesses and maintain current representations in SAM.gov. The work involves a specialized live-well intervention to manage a 200 PSI artesian flow without a functional primary shut-off, including the temporary crane relocation of the well house, adherence to strict environmental discharge permits, and compliance with multiple industry standards including ANSI B16.1, ASTM A536, AWWA C115, and Colorado state water well construction regulations. The contract is firm fixed price, subject to the Davis-Bacon Act wage standards for CO20260003, and requires full compliance with the Buy American Act for construction materials. All proposals must be submitted in two separate volumes: a technical proposal addressing key personnel qualifications, schedule realism, past performance, and a quality control plan, and a priced volume containing a single FOB destination price inclusive of all labor, materials, equipment, overhead, profit, and transportation costs, excluding taxes. The initial response deadline was extended multiple times, with the final proposal submission due by August 7, 2026, and the period of performance shifted to August 21, 2026 through October 30, 2026. A site visit was scheduled for July 9, 2026, and supplemental well drawings and revised schedule of items were distributed to support proposal development. Contractors must conduct hydrostatic testing of the new manifold at 300 PSI for a minimum of two hours with zero leakage, engage an independent testing lab approved by the Contracting Officer for concrete and material tests, and provide a minimum two-year manufacturer and installer warranty on all replaced components. Invoicing must be done electronically via the IPP.gov system, with progress payments allowed for mobilization up to 50% of the mobilization bid amount or 5% of the original contract amount, whichever is less, and final payment contingent on full performance, site cleanup, and submission of abandonment documents to the State of Colorado. All test reports must include specific
Colorado State Office

POSTED

about 21 hours ago

DEADLINE

in 25 days
View Details