Z--PARK CENTER WELL VALVE REPLACEMENT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Bureau of Land Management is seeking a qualified small business contractor to perform emergency repairs on the Park Center Well in Colorado, specifically to replace the failed primary and secondary control valves and modify the manifold piping to enable future rig connectivity. This solicitation, numbered 140L1726Q0022, is a Total Small Business Set-Aside under NAICS code 237110 with a size standard of $45 million, requiring all offerors to be certified as small businesses and maintain current representations in SAM.gov. The work involves a specialized live-well intervention to manage a 200 PSI artesian flow without a functional primary shut-off, including the temporary crane relocation of the well house, adherence to strict environmental discharge permits, and compliance with multiple industry standards including ANSI B16.1, ASTM A536, AWWA C115, and Colorado state water well construction regulations. The contract is firm fixed price, subject to the Davis-Bacon Act wage standards for CO20260003, and requires full compliance with the Buy American Act for construction materials. All proposals must be submitted in two separate volumes: a technical proposal addressing key personnel qualifications, schedule realism, past performance, and a quality control plan, and a priced volume containing a single FOB destination price inclusive of all labor, materials, equipment, overhead, profit, and transportation costs, excluding taxes. The initial response deadline was extended multiple times, with the final proposal submission due by August 7, 2026, and the period of performance shifted to August 21, 2026 through October 30, 2026. A site visit was scheduled for July 9, 2026, and supplemental well drawings and revised schedule of items were distributed to support proposal development. Contractors must conduct hydrostatic testing of the new manifold at 300 PSI for a minimum of two hours with zero leakage, engage an independent testing lab approved by the Contracting Officer for concrete and material tests, and provide a minimum two-year manufacturer and installer warranty on all replaced components. Invoicing must be done electronically via the IPP.gov system, with progress payments allowed for mobilization up to 50% of the mobilization bid amount or 5% of the original contract amount, whichever is less, and final payment contingent on full performance, site cleanup, and submission of abandonment documents to the State of Colorado. All test reports must include specific
General Info
Agency
NAICS
Place of Performance
Latitude 38.521286, Longitude -105.214619, CO, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The purpose of this amendment is to extend the suspense date to Friday, August 14, 2026 at 1700 MDT and to change the period of performance to 08/21/2026-10/30/2026. All other terms and conditions remain unchanged.
AMENDMENT A00003
The purpose of this amendment is to allow for a site visit Thursday, July 9, 2026 at 1030 MDT and to extend the suspense date to Wednesday, July 15, 2026 at 1200 MDT. All other terms and conditions remain unchanged.
AMENDMENT A00002
The purpose of this amendment is to provide well drawings to support proposal development and revise the schedule of items (Attachment 3) to support work tasks. The suspense for proposals is extended to 0800 MDT on Monday 24 June 2026 All other terms and conditions remain unchanged.
AMENDMENT A00001
This amendment includes the schedule of items as Attachment 3. All other terms and conditions are unchanged.
The Bureau of Land Management requires emergency repair of the Park Center Well. Please see the SOO in the attachments for more information. This is an initial RFQ which may result in amendments. Questions are required to be submitted no later than 7/13/2026 1700 MD.
Requests for Site Visits shall be made with the Contracting Specialist.
Basic Contracting Requirements:
1. Active Registration - www.sam.gov - check it now please. If having issues with your sam.gov registration, don't pay anyone. Free assistance is available at your local APEX Accelerators -https://www.apexaccelerators.us/#/
2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments
3. Part 13 - Simplified Acquisition Procedures
4. Part 36 - Construction
5. Davis Bacon Act Wage Standards for CO20260003
6. Total Small Business Set Aside for NAICS 237110Water and Sewer Line and Related Structures Construction- Size Std: $45M
7. Type of Contract - Firm Fixed Price
