Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on June 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Accessibility Improvements (Ramp and Pathway)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238190
New
SLED
B159 Provide Overhead Protection from Spalling Concrete
Solicitation # N400857570886
Solicitation N400857570886, titled Provide Overhead Protection from Spalling Concrete, B159, is a construction project at MCAS Cherry Point in Havelock, North Carolina. The scope of work involves the provision and installation of two debris nets approximately 23 feet above the floor in Building 159 to collect broken concrete from the ceiling. The project must be completed within 120 calendar days after the award, with the basis for award being the lowest price. Proposals are due by 1200 local time on September 15, 2026, and pre-proposal inquiries must be submitted by September 10, 2026. The contract is subject to the Davis-Bacon Act and the Buy American Requirement for Construction Materials. Bonding requirements vary by proposal value, with no bonds required for amounts up to 35,000 dollars, payment bonds for amounts up to 150,000 dollars, and bid, payment, and performance bonds for amounts exceeding 150,000 dollars. Key deliverables include a salvage plan, a list of contact personnel, and a detailed schedule of prices to be submitted within 15 days of the award. Quality control must comply with FAR 52.246-12, and safety requirements must adhere to USACE EM 385-1-1 (2024). Contractors are also required to provide computer cybersecurity compliance statements and submit digital photographs with monthly invoices.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 238190
New
Federal
Supply & installation of metal guardrails & handrails for a U.S Mission Residence in Marseille.
Solicitation # 19FR6326Q0098
The US Embassy Paris is soliciting a firm-fixed price contract for the supply and installation of metal guardrails and handrails at the US Consulate General residence garden in Marseille, France. The project requires the fabrication of carbon steel railings with hot-dip galvanizing and powder coating suitable for marine environments, adhering to both US and French building codes, including IBC 2024 and Eurocodes. The contractor must hold a valid Qualibat certification for structural and architectural metalwork and provide a minimum 10-year anti-corrosion warranty. Performance is mandatory, with work beginning within 20 calendar days of award and completion required within 90 calendar days. Eligible offerors must be registered in the System for Award Management and possess a permanent business address and telephone listing in France. Technical requirements include at least five years of experience with five similar projects and the provision of an English-speaking supervisor on site. Award will be granted to the lowest priced, acceptable, and responsible quoter. Proposals must be submitted electronically in English by September 10, 2026. Payment will be made monthly based on the value of labor and materials completed and in place, with a modified prompt payment period of 30 days.
US Embassy Paris

POSTED

1 day ago

DEADLINE

in 6 days
NAICS: 238190
New
SLED
Vallejo Home Complex Exterior Preservation and Fire HardeningThe California Department of Parks and Recreation is seeking a contractor for the Vallejo Home Complex Exterior Preservation and Fire Hardening project at Sonoma State Historic Park in Sonoma, California. This effort focuses on critical preservation repairs and fire resiliency upgrades to protect the buildings and their internal collections. The scope of work is divided by structure, with the Vallejo Home requiring exterior preservation including the repair of historic wood, restoration of carved eave trim, siding, porches, and dormers, and the installation of bird-deterrent measures following an assessment of woodpecker damage. The Hermitage and Delirio buildings will undergo roof replacement and fire hardening, which includes removing failing wood shingles, repairing framing and sheathing, and installing Class A fire-resistant roofing, ember-resistant vents, and fire-resistant underlayment. Across all structures, the project includes general envelope protection measures such as sealing penetrations, flashing upgrades, drainage corrections, and enhanced weatherproofing. All work must be performed in accordance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties and the 1995 Guidelines for Preserving Rehabilitating Restoring And Reconstructing Historic Buildings by Weeks And Grimmer. This project is categorized as a forecast under NAICS code 238190 and has been granted a Notice of Exemption under CEQA Section 15331 for the restoration of historical resources. The primary point of contact for this effort is Environmental Coordinator Caitlin Powers.
California Parks and Recreation, Department of

POSTED

2 days ago

DEADLINE

N/A

AI Contract Overview

Show more

This contract involves the design and installation of an ADA-compliant ramp and accessible pathway leading to the building entrance. The project requires ensuring the ramp includes the proper slope and handrails, while the pathway must feature durable surface materials that are compatible with the historic character of the building. This work is intended to improve accessibility in accordance with ADA standards while preserving the aesthetic integrity of the site. The contract, titled "Accessibility Improvements (Ramp and Pathway)," is a subcontract opportunity posted by the Vermont Department of Economic Development. The solicitation was announced on June 4, 2026, with a response deadline set for June 30, 2026. It falls under NAICS code 238190, which pertains to specialty trade contractors. While specific location details and contact points are not provided, interested parties can access further information through the Vermont Business Registry.

General Info

Design and install ADA-compliant ramp and pathway preserving historic building aesthetics.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

238190 - Other Foundation, Structure, and Building Exterior ContractorsView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73829.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Strafford Town Office Renovation RFP

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design and installation of an ADA-compliant ramp and accessible pathway to the building entrance, including proper slope, handrails, and durable surface materials compatible with historic character.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS