Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on February 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Accessible Camping & Paths at Butchers Pen Campground

Awarded
AD-07950State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution, implementing simple dimming controls, replacing ballasts, lamps, and ceiling fans, and replacing variable air volume systems. The project also requires correcting plumbing deficiencies and ensuring all work adheres to ADA accessibility guidelines and seismic-resisting system standards. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to prevailing wage rates. Key administrative requirements include submitting submittals within 14 days of award, providing a comprehensive safety plan, and managing all construction and demolition waste.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additional requirements include the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, as well as site improvements such as paving, drainage upgrades, and hazardous materials abatement. The work is divided into two primary pricing line items: building renovation and the removal and replacement of paving. The contract has an estimated value between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price. Bidders must submit responses by November 23, 2026, and an optional pre-bid meeting is scheduled for November 2, 2026. The project mandates strict adherence to quality control through a three-phase control process and requires a Contractor Quality Control Plan approved by the Contracting Officer. Bonding requirements are tiered, with proposals over 150,000 dollars requiring bid, payment, and performance bonds. Compliance with the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines is mandatory. Invoicing must be processed through Wide Area Work Flow using NAVFAC Form 4330/54.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 28, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must complete six specific GFEs prior to the bid opening date to avoid being deemed non-responsive. Mandatory requirements include providing proof of public notification via an online publication for 30 consecutive days and a print newspaper for one day, as well as evidence of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA). While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, failure to include the required publicity and agency assistance proof within the initial bid package will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of mechanical, electrical, and underground stormwater retention systems. An additional option for the P1016 Consolidated RDT&E Systems Facility includes the construction of a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. This solicitation is set aside for various small business categories and requires adherence to Davis Bacon Wage Rates, while remaining exempt from sales tax. Bidders must provide pricing across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, and plumbing, with responses due by November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and necessary electrical and vanity/cabinet repairs. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, EPA, and local Massachusetts building codes. The contract is a small business set-aside and requires a single lump sum bid, though the lowest price does not guarantee an award. Evaluation is based on best value, weighted by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submissions include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a Massachusetts contractor's license, and wage rate certification. The contract is subject to the Davis-Bacon Act and Executive Orders regarding minimum wage and paid sick leave. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30. Key deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed and a final punch list to be corrected within 14 days of the substantial completion walk-through.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, common areas, and mechanical and utility rooms. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained throughout the process. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include providing payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the successful testing of restored mechanical, plumbing, electrical, and life-safety systems, the removal of all debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 4 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, foundations with rigid inclusions and load transfer mats, reinforced concrete floors, and comprehensive grounding, lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and buildings 524 and 393. Site work encompasses clearing, rock excavation, grading, fill, and the mitigation of impacts on existing wetlands. Infrastructure improvements include access roads, paved loading areas, landscaping, and a full electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is issued by J & J Contractors, Inc., with a project duration of 1828 calendar days. The opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Florida Fish and Wildlife Conservation Commission (FWC) has officially awarded the contract for the project titled "Accessible Camping & Paths at Butchers Pen Campground" to Dodd Construction LLC, following their solicitation number AD-07950. The agency issued a notice of this award on February 12, 2024, with the posting period lasting until February 15, 2024, excluding weekends and holidays. Any interested parties who wish to challenge or protest this decision must submit a written notice within 72 hours of the posting, adhering to the provisions outlined under Chapter 120 of the Florida Statutes. Failure to file a protest within this timeframe or to post the required security will result in a waiver of the right to contest the award. The project falls under NAICS code 236220, indicating construction related to commercial and institutional building construction, and is managed by the Florida Fish and Wildlife Conservation Commission. The contract involves work at the Butchers Pen Campground in Florida, with the primary point of contact being Ruth Heggen, reachable via email at [email hidden] or by phone at [phone hidden]. Additional details about the solicitation and award can be accessed through the Florida Vendor Marketplace online portal.

Documents

1

FWC 23/24 - 47C: Accessible Camping Pads & Paths Bid Tabulation

PDF, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida Fish and Wildlife Conservation Commission (FWC)
Contacts1 person available
OfficeN/A

Full Description

Show more
This is the Commission’s notice of its Agency Decision to award solicitation number FWC 23/24-47C to Dodd Construction LLC.Pursuant to Chapter 120, Florida Statutes (F.S.), the posting of this Notice of Agency Decision/Award will begin on February 12, 2024 at 10:00 AM and will end 72 hours later on February 15, 2024 at 10:00 AM. (excluding Saturdays, Sundays, and state holidays).Any person who is adversely affected by the agency decision or intended decision shall file with the agency a notice of protest in writing within 72 hours after the posting of the notice of decision or intended decision. Saturdays, Sundays and state holidays shall be excluded in the computation of the 72-hour time periods.Failure to file a protest within 72 hours, the time prescribed in section 120.57(3), F.S., or failure to post the bond or other security required by law within the time allowed for filing a bond, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.

More opportunities from Florida Fish and Wildlife Conservation Commission (FWC)

Same awarding agency

NAICS: 441222
SLED
New Carolina Skiff E21 DLX CC with New Motor and New Trailer
Solicitation # FWC 26/27-18
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for one new, turnkey-ready 2026 or newer Carolina Skiff E21 DLX CC vessel. The package must include a new 2026 or newer Suzuki DF140BTXW outboard engine and a new aluminum tandem-axle I-beam trailer. The vessel must be professionally rigged and tested for immediate field deployment, featuring marine-grade stainless steel hardware, marine tinned copper wiring, and specific labeling for the bilge, navigation, anchor, lights, and accessory systems. The preferred completion date for this project is April 1, 2027, with a final required completion deadline of June 1, 2027. The contract will be awarded to the responsive and responsible bidder offering the lowest price. To be considered, vendors must be registered in the MyFloridaMarketPlace and SunBiz systems and submit sealed physical bids by October 23, 2026, at 2:30 PM ET; digital submissions are strictly prohibited. Required documentation includes a Bidder Acknowledgment form, a list of subcontractors, and certifications regarding forced labor and scrutinized company status. The agreement is governed by the Commission's Purchase Order Terms and Conditions, which include a 10 percent payment reduction for failed deliverables and a 15-calendar day notice period for termination for convenience. Compliance with the Build America, Buy America provision and the Americans with Disabilities Act is mandatory.
Boat Dealers

POSTED

22 days ago

DEADLINE

in about 15 hours
View Details
NAICS: 237990
SLED
Apalachicola Bay Oyster Restoration
Solicitation # FWC 26/27-31
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for the Apalachicola Bay Oyster Restoration project in Franklin County, Florida. With an estimated budget of 3,500,000 dollars, the project requires a contractor to coordinate the acquisition, delivery, staging, and barge deployment of restoration materials, such as uniformly sized concrete, mixed-layer concrete, or crushed lime rock, to restore degraded oyster reef habitats. All deployment must be completed by barge between May 1 and September 1, with a final project completion deadline of September 1, 2027. Work is restricted to weekdays between sunrise and 30 minutes before sunset and must be performed at designated sites in central Apalachicola Bay. The contract will be awarded to the responsive and responsible bidder offering the lowest total price. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems and provide at least three verifiable references for similar work. Submissions must be delivered in a sealed envelope to the FWC office in Tallahassee; digital submissions are considered non-responsive. Awarded contractors must provide a performance bond and insurance documentation before starting work and must comply with the Build America, Buy America provision and U.S. Coast Guard safety requirements. Payments are issued in arrears upon verification of work and are subject to a 0.7 percent MyFloridaMarketPlace transaction fee.
Other Heavy and Civil Engineering Construction

POSTED

27 days ago

DEADLINE

in 9 days
View Details
NAICS: 238910
SLED
Lake Miccosukee Mechanical Muck Management
Solicitation # FWC 26/27-11
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for mechanical muck management at Lake Miccosukee in Leon and Jefferson Counties, Florida. The project requires a contractor to use heavy equipment to disturb and turn over the lake bottom to expose fresh, moist muck, which expedites the deterioration and oxidation process and prevents the formation of buoyant floating tussocks. Work will be performed in approved sites, including Hwy 90, Live Oak Point, and Rococo Shoreline. The estimated project budget is 355,000 dollars for a one-year term, with the possibility of one renewal year. All treatments and final invoices must be submitted by June 4, 2027, with partial payments available every two weeks for verified work. To be considered, bidders must be registered in the MyFloridaMarketPlace and SunBiz systems and submit physical bids by October 27, 2026, as digital submissions are deemed non-responsive. Award will be granted to responsive and responsible contractors based on financial ability, experience, and reliability. Key deliverables include daily GPS tracking of work activities and the submission of tracks, polygons, and acreage calculations using compatible software such as OnX, Avenza, or Google Earth. The contractor must comply with various federal and state regulations, including the Clean Air Act, Water Pollution Control Act, and the Build America, Buy America provision, and must provide necessary insurance documentation before initiating work.
Site Preparation Contractors

POSTED

about 1 month ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS