This Solicitation opportunity from New Jersey was posted on September 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves the construction of a final cap system at a designated portion of the ACUA Landfill located within the ACUA Hanemann Environmental Park in Egg Harbor Township, New Jersey. The project, titled "ACUA Landfill Final Cap - Phase 2," is a solicitation issued by the Atlantic County Utilities Authority (ACUA) with a response deadline of October 31, 2024. The work encompasses a comprehensive scope, including the removal of existing vegetation, earthwork, installation of a geosynthetic lining system, soil cover, and final vegetation planting. Additionally, it involves the construction of stormwater conveyance systems, gas and leachate collection systems, access roads, and all related activities necessary to complete the final cap system in accordance with detailed plans and specifications. The project budget ranges from five million to fifteen million dollars, indicating a substantial infrastructure undertaking.
The contractual framework is guided by standard specimen agreements from ACUA, which specify the contractor's responsibilities for delivering and installing the required systems and materials. These agreements emphasize key contractual elements such as performance security, insurance requirements, warranties, adherence to the New Jersey Prevailing Wage Act, recordkeeping, and payment conditions. The contracts are designed to be flexible, subject to annual funding availability, and may include renewal options. The primary point of contact for the project is John Conover, reachable via email and phone, and the project details are accessible through the designated procurement portal. Overall, this contract represents a significant environmental infrastructure project aimed at finalizing landfill closure measures in compliance with regulatory and safety standards.
HighAI Summary for ACUA Landfill Final Cap - Phase 2 Technical Specifications: Technical specifications for the Atlantic County Utilities Authority (ACUA) Landfill Final Cap - Phase 2, revised 08-19-24. The document outlines the scope of work including survey work, gas/leachate collection system installation, geosynthetic component placement, soil grading, and stormwater management. It includes detailed divisions for general requirements, sitework, and concrete, as well as quality control and site access protocols.
PDF
PDF, High priority: read this first14 pages · specifications
HighAI Summary for ACUA Project 2024-SW-15: Landfill Final Cap Phase 2: Technical plan set and topographic survey for the Atlantic County Utilities Authority (ACUA) Landfill Final Cap Phase 2 (Project #2024-SW-15). The document includes a cover sheet, site and grading plans, soil erosion and sedimentation control details, and a 2023 annual topographic survey by ARM Group Inc. dated May 10, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Atlantic County Utilities Authority - General Conditions of the Construction Contract: General Conditions of the Construction Contract prepared by the Atlantic County Utilities Authority, revised 2024-09-09. This document establishes the legal and operational framework for construction projects, covering contract time, liquidated damages, bonds, insurance, payment terms, change orders, and contractor responsibilities.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Bid 2024-SW-15: ACUA Landfill Final Cap - Phase 2: Invitation to Bid (ITB) issued by the Atlantic County Utilities Authority (ACUA) for the construction of a final cap system at the ACUA Landfill in Egg Harbor Township, NJ. Released on September 17, 2024, with a bid opening date of October 31, 2024. The scope includes vegetation removal, earthwork, geosynthetic lining, soil cover, stormwater conveyance, and gas/leachate collection systems. The project is partially funded by the American Rescue Plan Act and requires compliance with New Jersey prevailing wage laws and SED participation requirements.
PDF
PDF, High priority: read this firstimplementation-procedures
HighAI Summary for Build America, Buy America Act Implementation Procedures for EPA Office of Water: This November 3, 2022 memorandum outlines the EPA Office of Water's procedures for implementing the Build America, Buy America (BABA) Act under the Bipartisan Infrastructure Law. It supplements OMB Guidance M-22-11 with specific clarifications for EPA water infrastructure programs. The document details the application of BABA requirements to various EPA water infrastructure investment programs, effective for funds obligated on or after May 14, 2022. It includes sections on general guidance, product coverage, co-funding, waivers, compliance documentation, and program-specific issues, along with example contract and assistance agreement language. The procedures aim to ensure domestic sourcing of iron, steel, manufactured products, and construction materials, supporting resilient U.S. supply chains and manufacturing jobs.
PDF
PDF, High priority: read this first20 pages · special-notice
HighAI Summary for Implementation of American Iron and Steel Provisions of P.L. 113-76: This memorandum from the EPA outlines the implementation of the American Iron and Steel (AIS) provisions of P.L. 113-76, Consolidated Appropriations Act, 2014. It details the requirement that Clean Water and Drinking Water State Revolving Fund assistance recipients use U.S.-produced iron and steel products for relevant projects funded from January 17, 2014, through the end of Fiscal Year 2014. The document explains project coverage, product definitions, waiver conditions, and exemptions, including projects with engineering plans approved before the enactment date. It provides a Q&A format for guidance on compliance and waiver requests, emphasizing EPA's management and oversight role.
PDF
PDF, High priority: read this first8 pages · wage-determination
HighAI Summary for Labor Standards Provisions for Federal and Federally Assisted Contracts - 29 CFR Part 5: This document, last revised on 01/02/2018, details labor standards provisions applicable to federally financed and assisted construction contracts under Title 29, Labor, Chapter I, Part 5 of the Code of Federal Regulations. It includes mandatory contract clauses for contracts exceeding $2,000 related to construction, alteration, or repair of public buildings or works financed wholly or partly by federal funds. Key provisions cover minimum wage requirements, classification of laborers and mechanics, fringe benefits, payroll deductions, and withholding payments to ensure compliance with the Davis-Bacon Act and related labor laws. The document mandates posting wage determinations and Davis-Bacon posters at work sites and outlines procedures for approving additional labor classifications and wage rates.
PDF
PDF, High priority: read this firstmandatory-eeo-language
HighAI Summary for Mandatory Equal Employment Opportunity Language - Atlantic County Utilities Authority: This document outlines the Mandatory Equal Employment Opportunity Language for construction contracts under Atlantic County Utilities Authority, referencing N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27-1.1 et seq. It mandates non-discrimination in employment based on various protected characteristics and requires contractors and subcontractors to ensure equal employment opportunities in recruitment, hiring, and employment practices. The document details obligations such as posting notices, notifying labor unions, and making good faith efforts to employ minority and women workers consistent with targeted employment goals. It also describes procedures for cooperation with unions and direct hiring efforts if union referrals are insufficient. The document is critical for compliance with state and federal equal employment opportunity laws and regulations, including the Americans with Disabilities Act.
PDF
PDF, High priority: read this first5 pages · payment-and-performance-bond
HighAI Summary for Payment and Performance Bond - Atlantic County Utilities Authority: This document is the Payment and Performance Bond required by Atlantic County Utilities Authority under P.L. 1996, c. 81. It is a statutory form to be executed after contract award, binding the Principal and Surety to ensure faithful performance and payment of claims related to the contract. The bond includes conditions, obligations, and stipulations protecting the Obligee and beneficiaries. It also contains a Surety Disclosure Statement and Certification detailing surety capital, surplus, underwriting limitations, and reinsurance information. The document requires authorized signatures and attachments such as Power of Attorney and Surety Disclosure Statement. The bond ensures financial security for contract completion and lawful claims payment.
PDF
PDF, High priority: read this first6 pages · reporting-form
HighAI Summary for SED Participation Building Phase Quarterly Reporting Form: This document is the SED Participation Building Phase Quarterly Reporting Form (OEO-002) issued by the New Jersey Department of Environmental Protection's Office of Equal Opportunity and Public Contract Assistance. It provides instructions and a form for quarterly reporting on the utilization of Socially and Economically Disadvantaged Businesses (SEDs) including MBEs and WBEs during the building phase of projects financed through New Jersey environmental infrastructure programs. The form requires detailed information about project sponsors, contractors, contract numbers, project descriptions, SED participation goals, subcontract awards, and signatures. It is intended for contracting agencies and contractors to submit quarterly reports within 15 days after each fiscal quarter to ensure compliance with SED utilization requirements under New Jersey regulations.
PDF
PDF, High priority: read this first2 pages · contract-document
HighAI Summary for SPECIMEN Contract Agreement - Atlantic County Utilities Authority: This document is a specimen contract agreement between the Atlantic County Utilities Authority (ACUA) and a contractor. It outlines the contractor's obligations to furnish, deliver, and install goods or services as per the specifications and bidding documents. The agreement includes clauses on performance security, insurance, warranties, contract duration, compliance with the New Jersey Prevailing Wage Act, record keeping, and payment terms. The contract is subject to annual fund availability and may include renewal options. The document is a formal contract template intended for execution upon award.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for ACUA Landfill Final Cap - Phase 2 SED Utilization Plan: Dated July 2024, this document outlines the Socially and Economically Disadvantaged (SED) Utilization Plan for the ACUA Landfill Final Cap - Phase 2 project. It establishes a goal of at least 10% award of contracts to SED-owned small businesses, defines contractor obligations for compliance, and details the reporting requirements and oversight responsibilities of the project compliance officer.
PDF
PDF, Low priorityappendix
LowAI Summary for Appendix A Americans with Disabilities Act of 1990 Compliance: This document is Appendix A related to the Americans with Disabilities Act of 1990 (ADA) as part of a contract with the Atlantic County Utilities Authority. It outlines the contractor's obligations to comply with Title II of the ADA, prohibiting discrimination based on disability in services provided by public entities. The contractor agrees to defend, indemnify, and hold harmless the owner against any claims or violations of the ADA arising during contract performance. The document details procedures for notification of claims, the contractor's responsibility for legal costs, and clarifies that owner approval of services does not relieve the contractor of ADA compliance obligations.
PDF
PDF, Low priorityother
LowAI Summary for Appendix B New Jersey Anti-Discrimination Provisions: This document is Appendix B from Atlantic County Utilities Authority detailing New Jersey Anti-Discrimination Provisions pursuant to N.J.S.A. 10:2-1 et seq. It outlines contractor obligations to prevent discrimination based on race, creed, color, national origin, ancestry, marital status, gender identity or expression, affectional or sexual orientation, or sex in hiring and employment practices related to the contract. It includes penalties for violations and conditions for contract cancellation or termination due to discrimination. The document also notes exceptions for awarding contracts to small, minority, or women's business enterprises as per state law.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Atlantic County Utilities Rider for Federal Funds: This document is a rider for purchases funded in whole or in part by federal funds for Atlantic County Utilities (NJ). It outlines compliance requirements per 2 CFR 200, specifically focusing on the procurement of recovered materials (EPA guidelines) and Equal Employment Opportunity (EEO) clauses for federally assisted construction contracts.
PDF
PDF, Low priority3 pages · contract-document
LowAI Summary for Environmental Maintenance Bond Document: This document is an Environmental Maintenance Bond in accordance with N.J.A.C. 7.22-10.11 (p). It binds the Principal and Surety to the Owner for $25,000 or 50% of the price bid for materials fulfilling environmental specifications. The bond ensures faithful performance of the contract, indemnifies the Owner against damages or costs arising from the work, and obligates the Surety to complete the work if the Principal fails. The bond remains effective for one year after final acceptance of the work. It includes provisions for modifications, waivers, and assignments without impairing the Surety's obligations. The document requires signatures and seals from the Principal and Surety, with instructions for execution depending on the Contractor's legal status.
PDF
PDF, Low priority2 pages · bond
LowAI Summary for General Maintenance Bond Sample Form: This document is a sample General Maintenance Bond form outlining the obligations of the Principal and Surety to the Obligee. It guarantees remedy of defects from materials, workmanship, or contract non-compliance for one year after final acceptance. The bond includes execution instructions, requirements for individual and corporate principals, and notes on premium rates and attachments such as Power of Attorney and Financial Statement. The bond is dated and signed by involved parties under seal.
PDF
PDF, Low priority9 pages · regulation
LowAI Summary for NJAC 7:22 Subchapter 9 - Awarding Contracts to Socially and Economically Disadvantaged Small Businesses: This document is Subchapter 9 of NJAC 7:22, establishing procedures for awarding contracts for state-assisted environmental infrastructure projects to small business concerns owned and controlled by socially and economically disadvantaged individuals (SED). It outlines the scope, purpose, and definitions related to the SED program, including contract types, project sponsors, and compliance requirements. The subchapter aims to implement policies ensuring at least 10% of contracts are awarded to SED businesses, detailing standards for contracting agencies and project sponsors under state financial assistance programs. The document provides definitions for key terms such as 'contract,' 'contractor,' 'project sponsor,' and 'set-aside contract,' among others.
LowAI Summary for SED Participation Monthly Progress Report OEO-003: This document is the SED Participation Monthly Progress Report (OEO-003) used by the New Jersey Department of Environmental Protection's Office of Equal Opportunity and Public Contract Assistance. It is designed to monitor the utilization progress of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SED) in the Environmental Infrastructure Financing Program. The report requires contractors to provide updates on solicitation, bidding, negotiation, and subcontract awards involving SEDs for the reporting month. It includes sections for contractor and project details, and requires signatures from the contractor and project compliance officer.
PDF
PDF, Low priority1 page · other
LowAI Summary for State Treasurer's List of Debarred, Suspended, & Disqualified Bidders: This document provides information about the current list of firms and individuals debarred under the New Jersey Prevailing Wage Act from participating in Public Works Contracts in New Jersey. It directs readers to an online resource for the most up-to-date list of debarred, suspended, and disqualified bidders.
Bids are solicited for the construction of a final cap system on a portion of the ACUA Landfill located at the ACUA Hanemann Environmental Park in Egg Harbor Township, NJ. The work includes, but is not limited to removal of existing vegetation, earthwork, installation of a final cap system including a geosynthetic lining system, soil cover, and final vegetation, stormwater conveyance system construction, gas and leachate collection system installation, access road construction, and all associated work. All work to be performed according to the plans and specifications.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award