This Government Contract opportunity from Massachusetts was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ADA-Compliant Curb Ramps and Transitions
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract calls for the design and construction of ADA-compliant curb ramps, detectable warning surfaces, and slope transitions at intersections within the Town of Hopkinton, specifically along Main Street with a zip code of 01748. The work must adhere to all federal accessibility standards to ensure safe and equitable pedestrian access for individuals with disabilities, including proper ramp gradients, tactile warning surfaces, and seamless transitions between sidewalks and roadways. The project is classified as a subcontract under NAICS code 238910, indicating it falls under other specialty trade contractors, and is open for bid through the Massachusetts procurement system. The solicitation was posted on July 1, 2026, with a response deadline of July 15, 2026, giving potential bidders two weeks to submit proposals. While the contracting agency is the Town of Hopkinton under the Massachusetts state structure, no specific point of contact or set-aside provisions are provided, meaning the opportunity is open to all qualified subcontractors without preference for small businesses, minority-owned firms, or other categories. Performance of the work is localized to Main Street in Hopkinton, and all materials and methods must comply with current ADA guidelines and local municipal requirements for public infrastructure improvements.
General Info
Agency
NAICS
Place of Performance
Main Street Hopkinton, MA, 01748, USASet-Aside
Documents
This scope was carved out of IFB#DPW- 27- 440- 01.
The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.
Chestnut Street Sidewalk Improvement
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
