Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ADA-Compliant Ramp Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Transportation Yard A Gate Modifications
Solicitation # 090226-1
Solicitation 090226-1 involves modifications to Gate A at the Twin Rivers Unified School District Transportation Yard located at 1400 Grand Avenue, Sacramento, California. The scope of work encompasses site demolition, earthwork, trenching, backfilling, asphalt paving, and site concrete work. Key deliverables include the installation of chain link and decorative metal fences and gates, the addition of four 10-foot square tubing posts, and the relocation and secure anchoring of existing Knox Boxes. The project requires strict adherence to technical standards, including ASTM F 1083 for steel pipe, ASTM C94 for 2,500 p.s.i. concrete, and ASTM D 6628 for pavement markings. All field welding must be performed by a Certified Structural Welder. The awarded contractor is responsible for all site safety and must submit a Site Safety Plan in compliance with DSA Bulletin BU 24-05. Specific operational requirements include maintaining clear utility markings, storing cement in weather-tight buildings, and ensuring accessibility compliance via ADA and CCR Title 24 warning surface tiles. Project oversight involves coordination with the District Construction Manager for underground work and notification of the Inspector, Architect, and DSA 48 hours prior to concrete placement. A mandatory pre-bid conference was scheduled for September 14, 2026, with a final response deadline of September 23, 2026.
TWIN RIVERS UNIFIED SCHOOL DISTRICT

POSTED

1 day ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract titled ADA-Compliant Ramp Installation seeks to secure a subcontractor for the design and construction of pedestrian ramps that fully comply with the Americans with Disabilities Act standards. Work includes slope grading to meet specified incline requirements, installation of level landing areas at top and bottom of ramps, application of detectable warning surfaces for individuals with visual impairments, and inclusion of handrails wherever mandated by ADA guidelines. All elements must be constructed to ensure safe, accessible, and durable public access in accordance with federal accessibility regulations. The project is located in San Bernardino, California, with a postal code of 92415-0835, and is being managed under the Landdevcontracts - Public Works - Land Development & Contracts division of California. The solicitation was posted on August 4, 2026, and responses are due by September 3, 2026. The North American Industry Classification System code for this effort is 238990, categorizing it under other heavy and civil engineering construction. This is a subcontract opportunity with no set-aside designation, and interested parties must submit proposals through the provided online portal before the stated deadline.

General Info

Install ADA-compliant ramps with handrails, detectable surfaces, and proper slopes in San Bernardino, California by September 3, 2026.

Agency

California → Landdevcontracts - Public Works - Land Development & ContractsView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

San Bernardino, CA, 92415-0835, USA

Set-Aside

NONE

Documents

This scope was carved out of PWG126-LANDD-6469.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

South Fontana ADA Ramps Project - Phase 2

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Landdevcontracts - Public Works - Land Development & Contracts
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Landdevcontracts - Public Works - Land Development & Contracts
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design and construction of ADA-compliant pedestrian ramps including slope grading, landing areas, detectable warning surfaces, and handrails where required.

More opportunities from California → Landdevcontracts - Public Works - Land Development & Contracts

Same awarding agency

NAICS: 237990
SLED
RFP - Environmental Permitting Water Infrastructure Project (Oak Glen) - Birch Creek Cutoff Walls
Solicitation # PWG126-LANDD-6444
The Request for Proposal PWG126-LANDD-6444 is issued by the California Land Development and Contracts agency within the Public Works department for the Environmental Permitting Water Infrastructure Project located at Oak Glen, specifically focusing on the Birch Creek Cutoff Walls in San Bernardino, California. The solicitation was posted on September 3, 2026, with a deadline for questions by 3:00 pm on September 23, 2026, and a final response deadline of September 30, 2026. Michael Reyna serves as the primary point of contact for this local government procurement. A critical component of this contract is strict adherence to California Labor Code sections 1770 et seq. regarding prevailing wage requirements. Contractors must comply with the General Prevailing Wage Determinations issued by the Director of Industrial Relations, which specify wage rates, employer payments, and overtime conditions for various crafts including heavy construction and dredging. Mandatory requirements include the maintenance of certified payroll records, the posting of wage schedules, and compliance with specific limits on working hours to avoid penalties. These regulations ensure that all workers on the project are compensated according to the official state wage schedules.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS