ADA Ramp
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Choctaw Nation Housing Authority is soliciting bids for the installation of an ADA-compliant concrete ramp at a residence located at 413 Burney, Colbert, OK 74733. The project requires the construction of a concrete ramp approximately 20 feet long with a minimum thickness of 4 inches, reinforced with 3/8 rebar or wire mesh, and finished with a broom texture. The ramp must feature black metal pipe handrails on both sides with a gripping surface between 34 and 38 inches, maintaining a 36-inch clear width between rails. The contractor is responsible for all measurements, material counts, permits, and line locates, ensuring all work meets or exceeds 2019 IRC standards. Site preparation includes the removal of a lattice fence, posts, steppingstones, and debris, with the final requirement to restore the yard to mowing condition. Bids must be submitted exclusively through the Housing Bid Board by 4:30 p.m. on October 24, 2026. To be considered valid, all quotes must be itemized and include a price expiration date. Preference in the award process will be given to Indian organizations and Indian-Owned economic enterprises. Additionally, Davis Bacon rules and requirements apply to this project if the total funding is $2,000 or above. Prospective contractors are required to visit the project site before bidding, as change orders for conditions identifiable during a site visit will not be approved. The estimated award date is November 24, 2026, with a start date to be negotiated upon award.
General Info
Place of Performance
colbert, OK, 74733, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Special Instructions: Home is a wood frame with siding on slab 1 bedroom 1 bath 900sq' All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed. CW Andrea Strawn # 580-326-7521 Insp. Mark Hopkins # 580-570-9771
Concrete: The home needs ADA concrete ramp at least 4" thick and use 3/8 rebar or wire mesh in it and wide enough so you can leave 36" in between the handrails put handrails on both sides from the front door Threshold come out past the flower beds two feet then turn back to the driveway Needs to be approximately twenty feet long with a broom finish and black metal pipe handrails the top gripping surface must be between 34" and 38". Slope the end of the ramp down into the ground and leave thick enough so it doesn't break. There is a lattice fence there with post that will need to be removed, other steppingstones, sticks and debris all removed from the job site make yard back to mowing condition
Similar Contracts
Same NAICS industry code
More opportunities from Oklahoma → Choctaw Nation Housing Authority
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
