Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Adams Stream Crossings and Pond Spillway Project (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-22662-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Adams Stream Crossings and Pond Spillway Project, identified by Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-22662-R1C, is a project executed by the California Department of Fish and Wildlife with Michael Adams. Located in the Eel River watershed approximately 3.4 miles northeast of Covelo in Mendocino County, the project involves five specific encroachments. Four of these encroachments consist of upgrading existing culverts, while the fifth, designated as SC-2, involves replacing a spillway culvert for an on-stream pond. The scope of work for all encroachments includes excavation, removal of existing structures, replacement with properly sized culverts, backfilling and compaction of fill, and rock armoring to minimize erosion. Additionally, all crossings require the installation of a riprap apron below each outlet, with crossings SC-3 and SC-5 specifically requiring a 15-foot width at the end of the apron. The project is being conducted pursuant to Section 1602 of the Fish and Game Code and has received a categorical exemption under Class 1 of the California Code of Regulations, title 14, section 15301, as the work involves the replacement of existing uses without expansion. The performance area is situated within the Covelo East U.S. Geological Survey 7.5-minute quadrangle at Assessor's Parcel Number 032-160-53. While the specific contract value and financial terms are not provided in the documentation, the project is overseen by the California Department of Fish and Wildlife, Northern Region, with John Herrera serving as the Senior Environmental Scientist Specialist.

General Info

California Department of Fish and Wildlife upgrading culverts and spillways in Mendocino County.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

approximately 3.4 miles northeast of the town of Covelo, Covelo, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-22662-R1C Notice of Exemption for Adams Stream Crossings Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
John HerreraSenior Environmental Scientist Specialist
Michael AdamsPlease contact John Herrera of CDFW

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-22662-R1C, pursuant to Section 1602 of the Fish and Game Code to Michael Adams. The Project is limited to five encroachments. Four proposed encroachments are to upgrade existing culverts. Work for these encroachments will include excavation, removal of the existing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as specified in the most recent version of the Notification to minimize erosion. All crossings will have a riprap apron installed below each outlet with crossings SC-3 and SC-5 having a width of 15 feet at the end of the apron. The final proposed encroachment (SC-2) is to replace a spillway culvert for an on-stream pond. Work for this encroachment will include excavation, removal of the existing culvert, replacement with new properly sized culvert, backfilling and compaction of fill, and rock armoring as specified in the most recent version of the Notification to minimize erosion

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS