Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Addendum 2 BDC09-24/25 Grayton Beach State Park - Boardwalk Replacement

Closed
BDC09-24/25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes such as epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements including paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract is awarded based on the lowest price, with pricing required for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to strict bonding requirements based on proposal value, including bid, payment, and performance bonds for projects exceeding 150,000 dollars. Compliance with the Davis-Bacon Act, ADA accessibility guidelines, and specific military standards for piping and labeling is mandatory. Project administration will be managed through Wide Area WorkFlow for invoicing, and quality assurance will be enforced via a three-phase control process and a final acceptance inspection involving the Contracting Officer and a Quality Control Manager.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator services, fire protection, plumbing, mechanical, electrical, sitework, and crane operations. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform comprehensive water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors, including dormitories, offices, and conference rooms. The scope of work encompasses architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on Best Value, evaluated through a weighted system consisting of price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory pre-bid site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Compliance with OSHA, EPA, ADA, and NFPA-101 Life Safety Code is required, and the contractor must provide a one-year guarantee of workmanship.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation is seeking proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces, including sixteen residential rooms and bathrooms, common areas, and mechanical rooms, to return them to safe residential use. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that all restored mechanical, plumbing, electrical, fire/life-safety, and security systems are tested and approved. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include payment and performance bonding for the full project value, as well as general liability insurance of 1 million dollars per occurrence and 3 million dollars general aggregate. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This contract pertains to the replacement of the boardwalk at Grayton Beach State Park, with a solicitation posted by the Florida Department of Environmental Protection. The project is valued between $500,000 and $1,500,000 and involves constructing or refurbishing the boardwalk to meet specific design and accessibility standards. Bidders are required to acknowledge and include the signed addendum with their submissions by August 22, 2024, to avoid rejection. The addendum clarifies that handrails are only necessary on slope sections of the boardwalk, not on landings, and addresses discrepancies between the geotechnical report and the site plans, explaining that two potential boardwalk configurations were evaluated, with shape modifications driven by elevation and ADA requirements. The primary point of contact for the project is Laurinda Micheels, reachable via email or phone, and interested parties can access detailed bid information through the Florida Vendor Marketplace.

Documents

1
PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida Department of Environmental Protection (DEP)
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
August 13, 2024 NOTICE TO APPLICANTSADDENDUM NO. TWO (2) Grayton Beach State Park - Boardwalk ReplacementDEP BID NO. BDC09-24/25 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION. NOTICEIt will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Laurinda Micheels, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.____________________________________Signature of Contractor and Date The following statements supersede & supplement the corresponding items in the specifications & drawings: 1. Question: The plans do not list a linear foot for the aluminum/magnesium grab rail. On sheet C200 it shows them on both sides of the boardwalk. Will they continually run on both sides the entire length ? Answer: Handrails are only required on the portions of the boardwalk labeled “Slope” and are not required on the portions labeled “Landing”. 2. Question: The geotechnical report is showing 2 proposed boardwalks rather than one. The proposed boardwalk is also a different shape than the proposed boardwalk in the site plans C103. Is there a reason for the discrepancy? Answer: The geotechnical investigation was performed for two different potential alternatives. HA-3 and HA-4 were performed generally in the vicinity of the current proposed boardwalk. The shape changed due to elevation requirements for crossing the dune line in combination with ADA accessibility requirements. In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS