Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on July 1, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Addendum 2 BDC47-23/24 Gasparilla Island - Sea Grape Restroom

Closed
BDC47-23/24State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price project involves comprehensive renovations including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume systems, and upgrading lighting controls and plumbing fixtures. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Proposals are evaluated based on price, past performance from the last five years, and corporate relevant experience, with all non-cost factors holding equal importance to price. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict security protocols, including FBI fingerprinting and background checks for personnel. All work must comply with ADA accessibility guidelines and prevailing wage rates as specified in Wage Determination GA20260315.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Required pricing scopes are extensive, covering everything from demolition, abatement, and structural steel to mechanical, electrical, plumbing, and crane services. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a single lump sum contract for water damage restoration at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge that affected the first, second, and third floors, including dormitories, offices, and conference rooms. The scope of work requires the contractor to perform architectural repairs, including drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA standards, OSHA safety regulations, and EPA guidelines, with Massachusetts state laws prevailing if they are more stringent than federal regulations. The award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must have attended a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a Massachusetts contractor's license, and wage rate certification. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave provisions. Payment terms are Net 30, and final acceptance requires a one-year material and workmanship warranty and a release of liens from all subcontractors.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of its North Wing dormitory in Troutdale, Oregon. The project focuses on restoring spaces damaged by water intrusion to return them to safe residential use. The scope of work includes repairs to sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms, specifically involving drywall installation, joint finishing, and painting for approximately 300 square feet of floor area. The contractor is responsible for all labor, materials, and equipment, including the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing that remains firm for 60 days. Awardees must provide payment and performance bonding for the full project value, along with proof of liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD requires the removal of all debris, successful system testing, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This contract pertains to the Gasparilla Island Sea Grape Restroom project, with bid number BDC47-23/24, issued by the Florida Department of Environmental Protection. The project solicitation was posted on July 1, 2024, with a response deadline set for July 10, 2024. The contract is valued between $50,000 and $150,000 and involves construction activities within Florida, specifically under the NAICS code 236220. Bidders are required to acknowledge receipt of Addendum No. 2 by signing and submitting it along with their bid to the designated contact, Alisha Sadler, to avoid potential rejection. The addendum clarifies a specific issue regarding the mechanical louver specified in the project documents, confirming the availability of the Airolite K605D model in the required size, with shop drawing approvals needed for any alternative products. This ensures that all bidders are aware of the updated specifications and procedural requirements. The contract emphasizes adherence to the revised specifications and maintains the integrity of the original project documents, with additional contact details provided for further inquiries.

Documents

1
PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida Department of Environmental Protection (DEP)
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
July 1, 2024NOTICE TO APPLICANTSADDENDUM NO. TWO (2)Gasparilla Island Sea Grape RestroomDEP BID NO. BDC47-23/24TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.NOTICEIt will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Alisha Sadler, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid._______________________________________Signature of Contractor and Date The following statements supersede & supplement the corresponding items in the specifications & drawings:1. Question: pertaining to the mechanical louver specified: It appears that the manufacturer for the Airolite K605D 28H x 72 W does not offer this product size or have it in production. Please advise if there is an alternative. Answer: This product is available based on the website: https://www.airolite.com/products/louvers/sightproof-louvers/k605d The attached pdf states on the first page section “Standard Construction”, sub section Minimum size and the sub section Maximum single section size. Shop drawing submittals and approvals will be required for “as equal” products.In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS