Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on March 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Administration Building West Restroom Renovations

Closed
40956State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a total small business set-aside solicitation for a single firm fixed price contract. The scope of work involves a comprehensive interior modernization of Building 262, including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling with new plumbing fixtures and partitions, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume systems, and upgrading lighting controls. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Proposals are due by November 18, 2026, and will be evaluated using a best suited negotiate methodology, where price, past performance, and corporate relevant experience are of equal importance. To be considered, offerors must provide two to four past performance questionnaires for projects completed within the last five years, with at least two projects valued at no less than one million dollars. Contractors are required to provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or three million dollars. Personnel must undergo background checks and adhere to strict security and safety regulations, including DHS and FBI fingerprinting. All work must comply with prevailing wage determinations and sustainability principles, with final acceptance based on government inspections and adherence to the provided technical specifications and drawings.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes and epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Mechanical and electrical upgrades encompass new HVAC systems, rooftop air-handling units, exhaust extraction, compressed air systems, updated electrical distribution, lighting, and building automation controls. Site improvements include paving removal and replacement, drainage upgrades, and hazardous materials abatement. The project is divided into two primary pricing line items: building renovation and paving work. Award will be based on the lowest price, with specific evaluation considerations for Buy American statute compliance. Contractors must adhere to strict technical standards, including MIL-STD-101 for piping and ASME A13.1 for color coding. Bonding requirements are tiered by proposal value, with bid, payment, and performance bonds required for projects 150 thousand dollars and over. Invoicing must be processed through Wide Area Workflow. Key deliverables include a comprehensive submittal register of shop drawings and product data, as well as final operation and maintenance manuals and as-built drawings.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses all site preparations and improvements, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utilities. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in 21 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for proposals for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors, including dormitories, offices, and conference rooms. The scope of work requires the contractor to restore these areas to their original condition through architectural repairs, including drywall replacement, painting, ceiling tile and flooring installation, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA standards, EPA and OSHA regulations, and applicable Massachusetts state and local building codes. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit, provide a detailed cost breakdown, and submit proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring specific minimum wage payments and paid sick leave for employees. Additionally, the contractor must provide a one-year guarantee on workmanship and a 20-year manufacturer warranty for LVP flooring. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 8 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return sixteen residential rooms, bathrooms, and common areas to safe residential use. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, as well as the temporary removal and re-installation of HVAC equipment such as furnaces and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposers must provide detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing that remains firm for 60 days. Award requirements include a minimum one-year workmanship warranty and the provision of payment and performance bonds for the full project value within ten days of award. Additionally, contractors must maintain general liability insurance with minimum coverage of 1 million dollars per occurrence and 3 million dollars general aggregate.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 11 days

Documents

4
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstifb
High
PDF, Low prioritysign-in-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Apr 9, 2025 to Mar 26, 2025.

Deadline changed

Response deadline changed from Mar 26, 2025 to Mar 28, 2025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → St. Johns River Water Management Dist
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The St. Johns River Water Management District headquarters (DHQ) is located at 4049 Reid Street, Palatka, FL 32177. The restrooms at the west end of the Administration Building are the original facilities and are showing significant signs of wear and tear, including deteriorated grout, tiles, and fixtures, all in need of replacement. The proposed project includes full renovation of the “Administration Building West” restrooms/showers. The anticipated project completion date is September 30, 2025.A Mandatory Pre-Bid Conference (on-site) is scheduled for March 13, 2025, at 11:00 AM, at: District Headquarters, 4049 Reid Street, Palatka FL 32177The purpose of the pre-bid conference is to view the project area and todiscuss the requirements of this solicitation. Participation is required tobe eligible to submit a response to this solicitation.The estimated project budget is $98,000.Exhibits accompanying this solicitation are as follows and are available upon signature of a District Standard Non-Disclosure Confidentiality Agreement:Exhibit 1: Enlarged Plan – Domestic WaterExhibit 2: Enlarged Plan – Sanitary Waste

More opportunities from Florida → St. Johns River Water Management Dist

Same awarding agency

NAICS: 332312
New
SLED
42871QR27 FABRICATION AND DELIVERY OF ALUMINUM WALKWAYS FY 2026-27
Solicitation # 42871QR27
The St. Johns River Water Management District is soliciting quotes for the fabrication and delivery of three 18-foot-long aluminum walkways, including handrails, swing gates, and specified ancillary support beams. The project has an estimated budget of $40,000, and all deliverables must be delivered to the Apopka Field Station in Mount Dora, Florida, by March 1, 2027. The scope of work is limited to fabrication and delivery; installation and the furnishing of H-piles, concrete footers, and sluice gates are explicitly excluded. The supplier is required to provide aluminum with a mill finish and must submit shop drawings for approval by the District Project Manager prior to fabrication. The contract will be awarded to the lowest responsive and responsible respondent. To be considered, applicants must demonstrate at least three years of experience fabricating and delivering aluminum walkways in Florida and provide evidence of completing at least two similar projects within the last three years. Required submittals include a quote form, a similar projects form, a certificate of authority to do business in Florida, and a non-collusion affidavit. Payment will be processed electronically via ACH following registration with PaymentWorks, Inc., in accordance with the Local Government Prompt Payment Act. Final acceptance is subject to an inspection by the District Project Manager upon delivery.
Fabricated Structural Metal Manufacturing

POSTED

7 days ago

DEADLINE

in 9 days
View Details
NAICS: 332996
New
SLED
42878 - Purchase and Delivery of Corrugated Aluminum Pipe
Solicitation # 42878QR27
The St. Johns River Water Management District is soliciting competitive pricing for the purchase and delivery of corrugated aluminum pipe and related materials, including bands and gaskets, to support culvert installation projects within its Fiscal Year 2026-27 Work Plan. The estimated budget for this work is 45,000 dollars, with all materials required to be delivered to the Lake George Field Station in Seville, Florida, by February 5, 2027. The scope includes specific quantities of 30-foot pipe lengths in 18-inch, 24-inch, 30-inch, and 36-inch diameters. All materials must comply with FDOT Section 945 and the current Florida Department of Transportation Standard Specifications for Road and Bridge Construction. The contract will be awarded to the lowest responsive and responsible respondent based on the total cost reflected in the cost schedule. To be considered responsive, applicants must provide all required documentation, including a certificate of authority to do business in Florida, proof of E-Verify registration, and an affidavit of non-collusion. The submission deadline is November 17, 2026, at 2:00 PM. The resulting agreement will be formalized as a Purchase Order, and the selected vendor must provide the District Project Manager with at least 48 hours of advance notice prior to delivery during standard business hours.
Fabricated Pipe and Pipe Fitting Manufacturing

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS