Advance Notice: Maintenance Dredging of New York Harbor, Sandy Hook Federal Navigation Channel
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves maintenance dredging of the Sandy Hook Channel in New York Harbor, a federal navigation project managed by the U.S. Army Corps of Engineers, New York District. The scope includes removing approximately 190,000 cubic yards of sand and gravel from critical shoaled areas to a depth of -35 feet Mean Lower Low Water (MLLW), plus 2 feet of overdepth, to restore navigable channel dimensions. The dredged material will be transported and placed at the Sea Bright Offshore Borrow Area off the coast of New Jersey. The work aims to ensure safe and efficient navigation for military, commercial, and recreational vessels while utilizing the dredged material beneficially. Mechanical dredging using a clamshell bucket, supported by multiple ocean-going barges, tug boats, and ancillary equipment, is recommended based on prior dredging operations. The contractor must begin work within five calendar days after receiving the notice to proceed and complete all basic work within 60 calendar days, maintaining an average production rate of at least 8,000 cubic yards per day. The estimated contract value ranges from $1 million to $5 million, with solicitation availability scheduled for June 2026, bids due in July 2026, and award targeted for August 2026. Liquidated damages are set at $3,260 per calendar day for delays beyond contract completion. This is an unrestricted procurement under NAICS code 237990, with work taking place near Highlands, New Jersey. The primary points of contact are Brian Winters and Nicholas P. Emanuel from the U.S. Army Corps of Engineers.
General Info
Agency
NAICS
Place of Performance
Highlands, NJ, 07732, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Synopsis of Proposed Dredging - Maintenance Dredging of Sandy Hook Channel, New York Harbor, Federal Navigation Project.
Background Information
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York Harbor, Sandy Hook Federal Navigation Channel. The dredged material would be dredged and subsequently transported to and placed at the Sea Bright Offshore Borrow Area (SBOBA), 5 miles southeast of Sandy Hook Point, NJ. The proposed maintenance dredging would remove approximately 190,000 cubic yards of selected critical shoals from the Sandy Hook Channel. Dredging would be required to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable overdepth. The dredged material is expected to consist primarily of sand and gravel.
The purpose of the proposed work is to alleviate the effects of shoaling and restore the authorized project dimensions, thereby providing safe and economical use of Sandy Hook Channel by military, commercial and recreational boating interests while providing future beneficial use of the dredged material.
Based on past dredging cycles, it is recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket. Additionally, multiple ocean-going barges, tug boats and ancillary equipment will be needed to perform the dredging, transport and placement activities. The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the placement site is located.
The Contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and to prosecute said work diligently and to complete all basic work ready for use not later than ninety (60) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day.
The work is estimated to cost between $1,000,000 and $5,000,000. Solicitation for the subject project is expected to be available in June 2026, with bid opening in July 2026. It is the intention of the government to award in August 2026 and issue the NTP within fourteen (14) calendar days of the award date.
Liquidated Damages of $3,260.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.
This is an unrestricted Procurement.