This Government Contract opportunity from California was posted on March 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Advanced Wastewater Treatment (AWT) Rehabilitation Tertiary Filters

Closed
S2603State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including Metropolitan-furnished 54-inch and 132-inch valves and tie-ins ranging from 54 to 145.5 inches. Additional structural components include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, and various electrical and instrumentation upgrades. The technical requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned, minority-owned, and woman-owned enterprises. Bids are due by September 29, 2026. The prime contractor provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, and the procurement of materials. All subcontractor negotiations must be finalized 24 hours before the bid opening.
James W. Fowler Co.

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing mains. The work is located on Walnut Street, Ebony Lane, and 247th Place in California. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. The solicitation specifically encourages participation from SBA-certified HUBZone, DBE, MBE, and WBE firms, including the formation of consortiums for larger tasks. Selected subcontractors must execute the standard agreement and insurance requirements of W.A. Rasic Construction Company, Inc., and may be required to provide payment and performance bonds totaling 100 percent of their bid, with premium reimbursement up to 1.5 percent. The deadline for responses is October 19, 2026, at 1:00 PM, with Matt Metoyer serving as the primary point of contact.
W.A. Rasic Construction Company

POSTED

about 5 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

This contract involves a turnkey project focused on the replacement and rehabilitation of dual-media filter materials and related components within four gravity filters at the Santa Rosa Water Reclamation Facility. The scope includes the removal and disposal of existing filter media such as anthracite, sand, and gravel, followed by inspection and replacement of underdrain nozzles and gaskets, as well as a borescope inspection of air-scour piping. Additionally, the contract covers the replacement of eight mud valves, installation of new filter media that meets AWWA standards, startup support, testing, and all necessary labor, equipment, and materials to return each filter to full operational capacity in coordination with facility personnel. The contract, titled "Advanced Wastewater Treatment (AWT) Rehabilitation Tertiary Filters," is solicited by the Engineering/Contracts Department of the Rancho California Water District in California. Bidders are required to submit their responses by March 25, 2026, and must include a bid bond of 10%. The primary point of contact for the project is Kelly Childers, reachable via email or phone for further inquiries. The work is set to be performed on-site at the SRWRF, with a focus on adherence to quality standards and coordination with facility staff to ensure proper project execution and operational restoration.

General Info

Replacement and rehabilitation of dual-media filter materials and components at Santa Rosa WRF.

Agency

Engineering/Contracts Department of Rancho California Water DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

26266 Washington Avenue, Murrieta, CA 92562, CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Contract opportunity posted

Deadline changed

Response deadline time changed from 9:00 PM UTC to 10:00 PM UTC on Mar 25, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyEngineering/Contracts Department of Rancho California Water District
Contacts1 person available
OfficeCA, USA
Organization / Agency
Engineering/Contracts Department of Rancho California Water District
View Agency Profile
Office AddressCA, USA
Contacts

Full Description

Show more
Scope: The Project consists of a turnkey replacement of dual-media filter materials and associated components within four (4) gravity filters at the Santa Rosa Water Reclamation Facility (SRWRF). Work includes removal and disposal of existing anthracite, sand, and gravel media; inspection, and replacement of underdrain nozzles and gaskets; borescope inspection of air-scour piping; replacement of eight (8) mud valves; furnishing and installation of new filter media meeting AWWA standards; startup support; testing; and all related labor, equipment, materials, and incidentals necessary to restore each filter to full operational service in coordination with facility staff.
Bid Bond: 10.00%

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS