Advanced Water Purification Facility Switchgear Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Advanced Water Purification Facility Switchgear Replacement Project, managed by Monterey One Water, involves the repair, maintenance, and minor alteration of existing electrical utility structures and mechanical equipment at the Regional Treatment Plant in Marina, California. The scope of work includes grading, erosion control, and the installation of junction boxes, conduits, electrical cables, asphalt, and concrete. A primary objective of the project is the installation of a replacement integrated power assembly and the startup and commissioning of new 21 kilovolt medium voltage switchgear. The project requires establishing critical electrical connections to M1W, PG&E, and ReGen electric transmission systems to ensure the sewerage utility facilities meet current reliability, health, and safety standards. This effort is classified as a forecast under NAICS code 238210 and is exempt under Class 1 Section 15301 as it does not expand the existing use of the facilities. Alison Imamura, Principal Engineer, serves as the primary point of contact for the lead agency.
General Info
Agency
NAICS
Place of Performance
14811 Del Monte Blvd., Marina, Marina, CA, 93933Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
