Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on January 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AFW Taxiway Hotel Extension - Phase I Construction

Awarded
26-0102State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 13 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-395-26-JM (Project No. 25-4261A) for the Water Treatment Plant Maintenance Package A Degasifier Package. The project involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work includes power washing vessel interiors, replacing media support grids and differential pressure gauges, vessel disinfection, and resealing access doors. To maintain continuous plant operations, work must be performed on one unit at a time. The project requires a prime contractor holding an active Florida General Contractor license, a project manager with at least five years of experience in similar projects, and a factory-trained service technician for field performance testing. The contract follows a strict timeline with substantial completion required within 180 calendar days and final project closeout within 210 calendar days from the Notice to Proceed. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the contract price. Award will be granted to the lowest responsive and responsible bidder. Key financial terms include a City Contingency Allowance of 86,000 dollars, with mobilization and demobilization capped at 5 percent and 2 percent of the cost, respectively. The final bid submission deadline was extended to November 18, 2026, at 3:00 PM via the OpenGov e-Procurement Portal.
Public Utilities

POSTED

about 15 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The AFW Taxiway Hotel Extension - Phase I Construction project, solicitation number 106744, is a small business set-aside contract issued by the City of Fort Worth for work at Perot Field Fort Worth Alliance Airport. The project involves the extension of the Taxiway Hotel on the northeast side of the airfield, requiring the construction of approximately 6,500 square yards of Portland Cement Concrete pavement, stabilized subbase, lime-treated subgrade, and asphalt shoulders. Additional scope includes the installation of taxiway edge and centerline lights, airfield signs, pavement markings, and both temporary and permanent erosion and sedimentation controls. The contract is awarded based on the Lowest Price Technically Acceptable (LPTA) methodology, with a small business goal of 30 percent of the bid amount. As-read bid results indicate a base bid of 3,776,997.76 dollars from Mario Sinacola & Sons Excavating, Inc. Performance begins within 10 days of the Notice to Proceed, with progress monitored monthly. The contractor is responsible for quality control, including the implementation of a Contractor Quality Control Program and adherence to ASTM and Federal Specifications, while the City manages quality assurance and final acceptance at the project site. Key deliverables include shop drawings, product data, and electronic as-built documentation. The contract mandates compliance with several regulatory requirements, including the Davis-Bacon Act for prevailing wages, Equal Opportunity clauses, and Clean Air and Water Pollution Control standards. Bidders must be prequalified and provide various bonds, including payment, performance, and maintenance bonds, to ensure project completion and financial security.

General Info

Contract Value

$3,776,997.76

Place of Performance

TX, USA

Set-Aside

NONE

Award Issued Date

Documents

2

Project 106744: Taxiway Hotel Extension - Phase I at Perot Field Fort Worth Alliance Airport

PDF, High priority: read this firstspecifications
High

AFW Taxiway Hotel Extension - Phase I Construction As-Read Bid Results

PDF, Low prioritybid-results
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
Contacts1 person available
OfficeTX, USA
Organization / AgencyTexas → City Of Fort Worth
Office AddressTX, USA
Contacts

Full Description

Show more
This project will extend Taxiway Hotel on the northeast side of Perot Field Fort Worth Alliance Airport, constructing approximately 6,500 square yards of Portland Cement Concrete pavement, stabilized subbase, lime-treated subgrade, asphalt shoulders, taxiway edge and centerline lights, airfield signs, airfield pavement markings, and temporary and permanent erosion and sedimentation controls.

More opportunities from Texas → City Of Fort Worth

Same awarding agency

NAICS: 238150
New
SLED
Meacham Airport Glazing Replacement CPN: 107016
Solicitation # 27-0020
The City of Fort Worth is soliciting competitive sealed proposals for the Meacham Airport Glazing Replacement project, located at 201 American Concourse, Fort Worth, Texas. The scope of work involves the renovation of the terminal building envelope, specifically the removal and replacement of all glazing, gaskets, sealants, and accessories from existing exterior aluminum storefront frames, curtain wall frames, and aluminum framed entrances. The estimated construction cost is approximately 2,705,670.00 dollars, and the project includes three optional alternates: the installation of new manual roller shades for the City of Fort Worth Aviation suite, similar shades for other tenant spaces, and the repainting of lobby gypsum board walls. Proposals must be submitted via the Bonfire portal by 2:00 PM on December 10, 2026. A pre-proposal conference is scheduled for November 12, 2026, and the deadline for inquiries is November 19, 2026. The City will select a contractor based on a best value evaluation, weighing references and experience (25 points) and previous work performed within the City of Fort Worth (5 points). A small business utilization goal of 30 percent is required, and proposers must submit a Small Business Utilization Plan to be considered responsive. Financial and legal requirements include a bid bond or cashier's check for 5 percent of the proposal amount, with payment and performance bonds required upon award for contracts exceeding 25,000 dollars. Proposers must also provide contractors general liability insurance and statutory workers compensation coverage. Proposals must include a separate 7.5 percent owner's contingency allowance, which remains under the sole control of the City. Technical compliance requires adherence to AAMA 501.2-25 testing standards for water penetration and strict adherence to manufacturer packaging and storage guidelines. Contractors are also required to pay prevailing wage rates and provide safety metrics, including OSHA TRIR and LTIR/EMR for the past three years.
Glass and Glazing Contractors

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS