Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Aggregate Material Supply

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract is for the supply of crushed aggregate that must meet AASHTO standards for gradation, durability, and plasticity, intended for use in both base and surface courses of pavement systems. It is structured as a subcontract under a Total Small Business Set-Aside, meaning only small businesses qualify to bid, in accordance with FAR 19.5. The NAICS code 327320 identifies this as a concrete product manufacturing opportunity, indicating the materials will be produced and processed in alignment with federal construction specifications. The solicitation was posted on July 16, 2026, with a response deadline of August 13, 2026, at 9:00 PM. The contracting agency is the USDA Forest Service under the Department of Agriculture, with the work to be performed within a location yet to be specified. While no physical address or point of contact details are provided in the data, the opportunity is accessible through the SAM.gov portal, and participation requires strict adherence to material performance criteria and small business eligibility requirements.

General Info

Small business subcontract for AASHTO-compliant crushed aggregate supply to USDA Forest Service, due August 13, 2026.

Agency

Department Of Agriculture → Csa East 13 Usda-FsView Agency

NAICS

327320 - Ready-Mix Concrete ManufacturingView NAICS

Place of Performance

PA, USA

Set-Aside

SBA

Documents

This scope was carved out of 12445526Q0103.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ALF Vault Toilet Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa East 13 Usda-Fs
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Agriculture → Csa East 13 Usda-Fs
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of crushed aggregate meeting AASHTO gradation, durability, and plasticity requirements for base and surface courses.

More opportunities from Department Of Agriculture → Csa East 13 Usda-Fs

Same awarding agency

NAICS: 237310
New
Federal
Monongahela NF FR78 Dogway Bridge Replacement
Solicitation # 12445526Q0104
This contract is a Request for Quotation (RFQ) issued under FAR Part 12 for the replacement of three existing vented ford low water crossings on Forest Road 78 within the Monongahela National Forest in Webster County, West Virginia. The project involves removing the current structures at Miles Post 0.39, 1.11, and 1.6 and installing new single-span bridges with concrete abutments, timber decks, and gravel approaches. In-stream work and dewatering are required at all three locations, necessitating strict environmental and safety controls. The solicitation is a Total Small Business Set-Aside under NAICS code 237310, with a size standard of $45 million in annual revenue, and is open only to responsible small business concerns. Evaluation will follow a Lowest Price Technically Acceptable (LPTA) approach, where the lowest-priced offer that meets all technical requirements will be selected, with no trade-offs permitted between price and non-price factors. Contractors must submit a comprehensive set of plans and certifications prior to mobilization, including a Safety Plan, Sediment and Erosion Control Plan, Dewatering & Diversion Plan, Traffic Control Plan, Quality Control Plan, Hazardous Spill Plan, Fire Plan, Construction Schedule, and certifications for weed-free materials and compaction test results. Shop drawings, engineering calculations, load ratings, and as-built drawings are also required, alongside adherence to specified standards such as AASHTO M 145, AWPA UC4C for treated timber preservation, and multiple Supplemental and Standard Specifications. The contractor must comply with federal labor wage requirements, Buy American provisions for construction materials, and must post Performance and Payment Bonds. Work must commence within five days of notice to proceed and be fully completed—including final cleanup—within 460 calendar days after award. Proposals must be submitted physically by August 25, 2026, and must include a valid Unique Entity ID from SAM.gov. All offers must be responsive and responsible, with the Contracting Officer maintaining final authority over inspections, acceptance, and contract administration.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
Federal
GMF Hapgood Pond Dam Spillway Bridge Support
Solicitation # 12445526Q0126
Solicitation 12445526Q0126 is a Request for Quotation issued by the USDA Forest Service for construction services to repair the Hapgood Pond Dam spillway bridge supports located in the Green Mountain National Forest, Vermont. The project scope involves cleaning and preparing existing concrete and wingwall surfaces, drilling and grouting rebar, placing rebar and forms, and installing new concrete bridge supports. This is a total small business set-aside with an estimated project magnitude of under $25,000. The contract is intended to be awarded as a firm-fixed-price purchase order, and the successful contractor must complete all work within 120 days of the Notice to Proceed, adhering to seasonal constraints that require work to be performed after the pond is drained in the fall and before it is filled in the spring. Technical requirements include adhering to Forest Service Supplemental Specifications and Federal Highway FP-24 standards. Specific quality benchmarks mandate that concrete must meet or exceed 4500 PSI compressive strength and reinforcing steel must conform to ASTM A615 Grade 60. Contractors are responsible for submitting a project schedule, placement procedures, and mix designs for approval prior to construction. Labor standards must comply with the Davis-Bacon Act and applicable wage determinations for Bennington County, Vermont. To be considered responsive, offerors must submit a cover page including their SAM UEI number, a completed Excel Schedule of Items, and a detailed Basis of Estimate via email no later than September 3, 2026.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 5 days
View Details