Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Aggregates & Road Base Materials

Closed
25-ITB-084State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
International
Buckinghamshire Highways Works Open Framework
Solicitation # BC/0002075
The Buckinghamshire Highways Works Open Framework, solicitation BC/0002075, is a procurement by Buckinghamshire Council to establish an Open Framework Scheme for highway-related construction, capital-funded maintenance, and improvement schemes. The framework is designed to enhance the operation and serviceability of highway assets and is divided into seven discrete lots, with the intention of appointing a maximum of four suppliers per lot. The total estimated value of the contract ranges from £126,030,000 excluding VAT to £151,236,000 including VAT, with a maximum total duration of eight years from the commencement of the initial framework agreement, estimated to end by April 1, 2035. The procurement process is conducted in two stages, beginning with a Pre-Qualification Stage (PSQ) that evaluates financial standing, health and safety policies, and data protection. Bidders must meet specific insurance requirements, including £20m for both Employer’s and Public Liability Insurance and £5m for Professional Indemnity Insurance. Award decisions are based on the most advantageous tender, weighted 60% on price and 40% on quality. Quality assessments focus on technical capability, service delivery, the NEC4 delivery model, innovation, social value, and sustainability. Performance will be monitored through five core Key Performance Indicators (KPIs) and additional call-off KPIs. There is no set-aside status for this solicitation.
Buckinghamshire Council

POSTED

about 19 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project, State Project No. 128-158, which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail. The trail will run along the north side of Tariffville Road, crossing the Farmington River via an existing sidewalk on the Tariffville Road bridge, and extending to Curtiss and Pattison Parks. The scope includes the construction of a boardwalk section within and adjacent to wetlands in the Farmington River riparian corridor. This project is funded through the Transportation Alternatives Program and is administered by the Connecticut Department of Transportation. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced in the required work. Bidders must provide a CTDOT contractor prequalification certificate and submit a physical bid package including a non-collusion affidavit, bid security, and a hold harmless and indemnification agreement. Key technical requirements include adherence to CTDOT Standard Specifications and Connecticut Guidelines for Soil Erosion and Sediment Control. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons for the disposal of controlled materials. There is no set-aside status for this solicitation, and the DBE participation goal is zero percent. Bids are due by November 24, 2026, at 2:00 PM.
DAS Procurement

POSTED

about 22 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

Flagler County is seeking bids for the procurement of road base materials through solicitation number 25-ITB-084, posted on August 7, 2025, with a response deadline of September 3, 2025. The contract aims to supply aggregates and road base materials necessary for road and bridge projects within Florida, with a contract value estimated between $500,000 and $2,000,000. Due to the potential for emergency situations, the quantities required for emergency response are unpredictable and cannot be precisely estimated in advance. All work must be authorized by designated personnel before each delivery, ensuring proper oversight and coordination. Bidders are required to include all personnel and equipment needed to fulfill the scope of work in their bid worksheets. The primary contact for this solicitation is Jessica Martin, reachable via email at [email hidden] or by phone at [phone hidden]. The project details and additional information can be accessed through the provided procurement portal link.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

8
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this first1 page · bidder-checklist
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstspecifications
High
DOCX, High priority: read this first9 pages · contract-document
High
PDF, Low priority1 page · bid-bond
Low
PDF

Read all 8 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 5 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 9 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Apr 7, 2025 to Sep 3, 2025. The notice title changed. NAICS code changed from 561730 to 237310. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Road and Bridge
Contacts1 person available
OfficeN/A

Full Description

Show more
Flagler County is soliciting bids for the procurement of Road Base Materials. Upon successful contract execution, all work shall by authorized by appropriate personnel prior to commencement of each delivery. Due to nature of potential emergency situations, the amount of emergency-related quantities needed cannot be anticipated at this time. All other personnel and equipment necessary to complete the scope of work MUST be included in the accompanying bid worksheet.

More opportunities from Florida → Road and Bridge

Same awarding agency

NAICS: 237310
New
SLED
Main Street Bridge No. 794004 Repairs - Cleaning and Painting
Solicitation # 27-B-30KW
The County of Volusia, Department of Public Works, Road & Bridge Division, is soliciting bids for the Main Street Bridge (Bridge No. 794004) Repairs – Cleaning and Painting project in Daytona Beach, Florida. The scope of work includes cleaning and painting all structural steel on the bascule and flanking spans and select machinery, installing web repair plates, replacing bolts and rivets, removing abandoned air buffers and strike plates, and rehabilitating the auxiliary drive for span drive machinery. The contractor is responsible for all labor, materials, equipment, and incidentals, including traffic control, maintenance of channel traffic, pollution controls, environmental testing, and functional checks such as span balancing. The project has an estimated construction cost of $2,426,851, with a total contract time of 180 days and a substantial completion deadline of 150 days after the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder based on total bid price or a combination of total and alternate bid prices. Bidders must provide examples of similar projects and references for verification. Key requirements include compliance with the Lead Based Paint Prevention Act, the Fair Labor Standards Act, and OSHA and NFPA safety standards. The contractor must notify the United States Coast Guard at least 60 days in advance of any work affecting waterway traffic. Payment for undisputed invoices will be remitted within 20 business days. There is no set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 26 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS