This Solicitation opportunity from Colorado was posted on September 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for AHEC-25913-B St. Cajetan's Stucco Repair and Painting - Information for Bidders: Instructional document for bidders regarding Project P1002052 (St. Cajetan's Stucco Repair and Painting) for the Auraria Higher Education Center. It outlines requirements for the bid form, submission procedures, bid security (5% for bids over $50,000), compliance with Colorado laws (including prevailing wage and embodied carbon emissions), and the method of award based on the lowest responsible bidder with additive/deductible alternates.
XLSX
XLSX, High priority: read this firstwage-determination
HighAI Summary for Appendix D: Colorado Apprenticeship Contribution Rates 2024-January: This document specifies the apprenticeship contribution rates for various trades in Colorado as of January 2024. It includes specific rates for trades such as Boilermakers, Bricklayers, Carpet/Linoleum Layers, Glaziers, and Painters, detailing the associated local unions and geographic regions.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for C020240020 - Wage Determination (Denver, CO) MOD #3: General Decision Number C020240020, Modification 3 (dated 05/31/2024), specifies the prevailing wage rates and fringe benefits for building construction projects in Denver County, Colorado. It includes specific hourly rates for various trades such as electricians, plumbers, and carpenters, and outlines compliance requirements for Executive Orders 14026 and 13658 regarding minimum wage and paid sick leave.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for P1002052 - St. Cajetan’s Stucco Repair and Painting Bid Form: Official bid form for the State of Colorado Office of the State Architect for the Auraria Higher Education Center project (P1002520), involving stucco repair and painting at St. Cajetan’s. The document requires bidders to provide a base bid, completion timelines, and certifications regarding Colorado labor, SDVOSB status, and bid guarantees.
PDF
PDF, High priority: read this firstifb
HighAI Summary for P1002520 - St. Cajetan's Stucco Repair and Painting: Invitation for Bids (IFB) for stucco restoration and painting at the Auraria Higher Education Center (AHEC) campus. The scope includes stucco repair, re-painting of restored areas, and sealant application, with additional alternates for full facade painting. Bidders must meet minimum requirements, including two projects over $200k in the last three years and bonding capacity of $450k. A mandatory pre-bid meeting was scheduled for September 16, 2024, with sealed bids due by September 25, 2024.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for P1002520 - St. Cajetan's Stucco Repair and Painting Agreement: State Form SC-6.21 Design/Bid/Build (D/B/B) Agreement between the State of Colorado (Auraria Higher Education Center) and a contractor for the St. Cajetan's Stucco Repair and Painting project (Project #P1002520). The document outlines performance requirements, time of completion, contract sum, and incorporates General Conditions (SC-6.23) and various exhibits including bonds and wage determinations. Version Rev. 1/2024.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for P1002520 St. Cajetan’s Stucco Repair and Painting - Bid Alternates Form: A Bid Alternates Form for the Auraria Higher Education Center project (P1002520), St. Cajetan’s Stucco Repair and Painting. The document provides a structured schedule for bidders to enter pricing for additive alternates (specifically for prepping, priming, and painting the East, North, West, and South elevations) and deductive alternates.
DOCX
DOCX, High priority: read this firstbid-bond
HighAI Summary for P1002520 St. Cajetan’s Stucco Repair and Painting - Bid Bond: A standard Bid Bond form for the Auraria Higher Education Center project P1002520 (St. Cajetan’s Stucco Repair and Painting). It requires a guarantee of 5% of the proposal amount and specifies that failure to provide a properly executed bond and Power of Attorney will result in the proposal being deemed non-responsive.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for P1002520 St. Cajetan’s Stucco Repair - Labor Burden Calculation: A State of Colorado Office of the State Architect form for the Auraria Higher Education Center (Project P1002520). This document requires contractors and major subcontractors to provide a detailed labor burden calculation (taxes, pensions, insurance, etc.) to be used for the construction agreement and future Change Order Proposals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project No. 23-015: St. Cajetan's Stucco Rehabilitation Specifications: Technical specifications issued September 13, 2023, for the rehabilitation of exterior stucco and decorative cast concrete elements at St. Cajetan's Church (Auraria Higher Education Center) in Denver, CO. The document includes a detailed table of contents covering Divisions 01 through 33, with specific focus on general requirements, joint sealants, and portland cement stucco rehabilitation. It outlines project management, site access, work restrictions, and coordination requirements.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for State Form SC-6.23 General Conditions of the Contractor's Design/Bid/Build Agreement: This document contains the General Conditions (State Form SC-6.23) for the State of Colorado Office of the State Architect State Buildings Program's Design/Bid/Build agreements. It outlines 54 articles covering essential contractual terms, including definitions, insurance requirements, payment processes, change orders, dispute resolution, termination procedures, and Colorado-specific legal provisions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for St. Cajetan's Stucco Rehabilitation - Architectural Sheets Index: Architectural sheet index and project contact information for the St. Cajetan's Stucco Rehabilitation project in Denver, CO. Issued for bidding and construction on 09/13/2023, the document identifies the owner representative (Auraria Higher Education Center), project manager, and architect (Form+Works Design Group, LLC), and notes funding via a History Colorado State Historical Fund Grant.