This Solicitation opportunity from Colorado was posted on October 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Auraria Higher Education Center is soliciting bids for Project P1004332, involving high-priority structural repairs and waterproofing of the 7th Street Garage in Denver, Colorado. This Design/Bid/Build project includes concrete and rebar repair, shoring, spandrel repair, and the installation of traffic coatings and sealants based on the Martin/Martin 100% Construction Set. The work must be performed in phases to maintain garage access, with strict requirements for traffic control, site signage, and the creation of mockups to establish quality standards. The total appropriated sum for the project is 2,443,160.00 dollars.
Bids are due by October 9, 2026, and will be awarded to the lowest responsible bidder, considering Colorado resident preferences and a combination of base bids with additive or deductible alternates. Submissions must include a bid bond, a unit pricing form for quantity variances, and documentation of minimum qualifications. The contractor must comply with the Buy Clean Colorado Act for metal and rebar, adhere to prevailing wage rates, and certify apprenticeship utilization for specific trades. Additionally, bidders must disclose Service-Disabled Veteran Owned Small Business status and commit to 80 percent Colorado labor for projects exceeding 500,000 dollars.
Contract administration is governed by State Forms SC-6.21 and SC-6.23, with payments processed via form SBP-7.2 and certified by the Architect/Engineer. The contractor is required to provide performance and payment bonds, as well as comprehensive insurance and workers compensation certifications. All work must meet International Building Code, ADAAG, and Colorado accessibility standards. Final acceptance is contingent upon successful inspections by AHEC, with specific requirements for the approval of reinforcing steel and structural frameworks before they are concealed.
General Info
Structural repairs and waterproofing for Denver garage, budget $2,443,160, bids due October 9, 2026.
PDF, High priority: read this first26 pages · specifications
HighAI Summary for 7th St Garage High-Priority Structural Repair Bid Set - Drawings: 100% Construction Set (dated 04/08/2026) for high-priority structural repairs and waterproofing at the Auraria Campus 7th Street Parking Garage in Denver, CO. The document includes a structural sheet list, general notes on steel and welding requirements, material tables, and detailed submittal requirements for concrete repair, sealants, and traffic coatings.
PDF
PDF, High priority: read this first3 pages · rfb
HighAI Summary for 7th St. Garage High-Priority Structural Repairs - Bid Form (SBP-6.13): A formal Bid Form (SBP-6.13) for the State of Colorado Office of the State Architect regarding high-priority structural repairs for the 7th St. Garage at the Auraria Higher Education Center (Project No. 1004332). The document outlines requirements for base bid pricing, completion timelines, bid guarantees, and compliance with Colorado labor and SDVOSB certifications.
DOCX
DOCX, High priority: read this first1 page · amendment
HighAI Summary for Addendum 1 - Unit Pricing Form - SBP-6.133: This document is Addendum 1 for procurement SBP-6.133, specifically providing the Unit Pricing Form. It serves as a modification to the original solicitation to define the pricing structure required for the bid submission.
PDF
PDF, High priority: read this first6 pages · ifb
HighAI Summary for AHEC-27705-B 7th St. Garage High-Priority Structural Repairs: An Invitation for Bids (IFB) issued by the Auraria Higher Education Center (AHEC) for high-priority structural repairs and waterproofing of the 7th St. Garage in Denver, CO. The scope includes concrete and rebar repair, shoring, and spandrel repair based on drawings dated 4/8/26, with an optional alternate for sealant and coating work. The project requires compliance with Colorado labor laws, prevailing wage rates, and the Buy Clean Colorado Act.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for AHEC-27705-B 7th Street Garage Addendum 1: Addendum 1 for the 7th Street Garage High-Priority Structural Repairs project (AHEC-27705-B). This document provides a comprehensive Q&A session addressing structural repair quantities, parking costs, phasing, working hours, and material compliance. It introduces a mandatory Unit Pricing Form to be submitted with bid documents to handle variances between bid and field-verified quantities.
DOCX
DOCX, High priority: read this first1 page · specifications
HighAI Summary for Appendix C - Sample Direct Labor Burden Calc - 7th St Garage Repairs: A sample direct labor burden calculation document related to the 7th St Garage Repairs project (SBP6.18). It serves as a supporting technical template or specification for calculating labor costs.
PDF
PDF, High priority: read this first7 pages · wage-determination
HighAI Summary for Appendix D - Colorado Apprenticeship Contribution Rates - 7th Street Garage Repairs: This document specifies the hourly apprenticeship contribution rates for various trade unions in Colorado for the 7th Street Garage Repairs project. It lists specific rates per hour for multiple locals, including electrical, plumbing, iron workers, and laborers, categorized by geographic region and project type (commercial vs. industrial).
PDF
PDF, High priority: read this first5 pages · wage-determination
HighAI Summary for Appendix D - Prevailing Wage - 7th Street Garage Repairs: General Decision Number CO20260020 for building construction in Denver, Colorado. This document specifies the prevailing wage rates and fringes for various labor classifications, including electricians, carpenters, and ironworkers, as of May 18, 2026. It includes compliance notes regarding Executive Orders 13706 and 13658.
PDF
PDF, High priority: read this first16 pages · contract-document
HighAI Summary for P1004332 - 7th St. Garage High-Priority Structural Repairs Agreement: A Design/Bid/Build (D/B/B) Agreement (State Form SC-6.21) between the State of Colorado (Auraria Higher Education Center) and a contractor for high-priority structural repairs to the 7th St. Garage. The document outlines the project scope, a total appropriated sum of $2,443,160.00, and includes a signature page and table of contents referencing general conditions and various exhibits including bonds and wage determinations.
PDF
PDF, High priority: read this first124 pages · specifications
HighAI Summary for Project No: 1004332 - 7th Street Garage Structural Repairs Specifications: Technical specifications (Section 01 11 00 - Summary of Work) for the 7th Street Garage Structural Repairs project at the Auraria Campus. The document outlines the scope of work, including concrete repairs, waterproofing, shoring, and traffic coating installation. It specifies project coordination, phased construction requirements to maintain garage access, and site restrictions. The work is based on the Martin/Martin 100% Construction Set dated 03/27/2026.
PDF
PDF, High priority: read this first2 pages · certification
HighAI Summary for SBP-2.1 Apprenticeship Certification - 7th St Garage Repairs: An Apprenticeship Utilization Certification form (SBP-2.1, Rev. 06/2025) for the State of Colorado Office of the State Architect. This document requires the General Contractor to certify that subcontractors in specific trades participate in USDOL-registered apprenticeship programs and meet specific graduation rate requirements per § 24-92-115, C.R.S.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for SBP-6.12 Information for Bidders - 7th St. Garage High-Priority Structural Repairs: Revision 7/2025 of the State of Colorado Office of the State Architect's 'Information for Bidders' (SBP-6.12). This document outlines the bidding requirements for the Auraria Higher Education Center Project P 1004332 (7th St. Garage High-Priority Structural Repairs), including bid security, tax exclusions, 'or equal' substitutions, and the method for determining the lowest responsible bidder using additive and deductible alternates.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for SBP-6.131 Bid Alternates - 7th St. Garage High-Priority Structural Repairs: A bid alternates form (SBP-6.131, Rev 7/2025 R1) for the State of Colorado Office of the State Architect, Project P 1004332 (7th St. Garage High-Priority Structural Repairs). The document provides a structured format for bidders to submit pricing for additive and deductive alternates, specifically mentioning sealant and coating work at Level 4 of the garage.
PDF
PDF, High priority: read this first85 pages · specifications
HighAI Summary for SC-6.23 General Conditions - 7th Street Garage Repairs: State Form SC-6.23 (Rev 02/2025) from the Colorado Office of the State Architect. This document outlines the General Conditions of the Contractor's Design/Bid/Build (D/B/B) Agreement for the 7th Street Garage Repairs, covering definitions, execution, project communication, submittals, and subcontractor management.
DOCX
DOCX, Low priority2 pages · supporting-document
LowAI Summary for SBP-6.14 - Appendix B2 Bid Bond (7th St Garage Repairs): Appendix B2 provides the Bid Bond form for the 7th St Garage Repairs procurement (SBP-6.14). This is a supporting document used to ensure the bidder provides a financial guarantee for their proposal.
AHEC-27705-B - 1004332 - 7th St. Garage High-Priority Structural Repairs
SEE ATTACHED DOCUMENTS FOR MORE INFORMATION INCLUDING SPECIFICATIONS, BID FORMS, BID BOND, ETC.
More opportunities from Colorado → Auraria Higher Education Center