Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Airfield Pavement Concrete Contractor

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of MC-0322844.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2027 Airfield Projects - Contract 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Aviation Project Management Group
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal of existing taxiway/apron concrete panels and installs new pavement for prime contractors on Port of Seattle airfield projects. Removes existing concrete and installs PCC (Portland Cement Concrete) or RapidSet high-early strength concrete to restore aircraft apron pavements. Requires experience with high-early strength concrete for rapid return-to-service. Delivers installed and cured airfield concrete panels.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and infrastructure works, including underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, shoring, asphalt paving, and the installation of utilities, manholes, and traffic signals. Additional requirements include land surveying, site security, traffic control, and storm water pollution prevention. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to various collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Athletic Track and Field Resurfacing
Solicitation # IFB27000092
Chesterfield County in Virginia is soliciting bids for a requirements contract to provide all labor, materials, equipment, permits, and insurance for the repair and resurfacing of athletic tracks and appurtenances. The scope of work includes the removal and disposal of existing porous rubber surfaces, surveying asphalt bases for planarity, and installing a new durable wearing surface consisting of a polyurethane structural spray with EPDM rubber granules and MDI pigmented polyurethane binder. Additionally, the contractor may be required to mill existing asphalt and provide a minimum 1.5 inch asphalt overlay meeting VDOT specifications for SM 9.5A. Key deliverables include the installation of Maxflex 3/8 inch surfacing or equivalent, urethane line marking, and the construction of new concrete shot put and discus pads. All work must adhere to NFSHSA rules for track and field, the Virginia Uniform Statewide Building Code, and local regulations. Award will be granted to the lowest responsive and responsible bidder based on the Grand Total Bid, with extended warranty information serving as a potential factor. Bidders must provide pricing for all listed items, including various square yardage tiers for surface removal, stone base installation, and surfacing. The contract requires strict adherence to equal employment opportunity, non-discrimination, and drug-free workplace provisions. Performance takes place on County property, requiring employees to obtain identification cards and utilize the Raptor system for school site access. Payment is managed through the County's preferred ePayables program or via mailed checks, with all invoices requiring specific purchase order details. Bids must be submitted by December 17, 2026, either electronically through the eProcurement system or as a hard copy delivered to the Lane B. Ramsey Building.
Chesterfield County

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
AL3985180-Replacement of Bridge No. 0109100 on MD 144 Over Evitts Creek located in Allegany County.
Solicitation # AL3985180
Solicitation AL3985180, managed by the Maryland Department of Transportation State Highway Administration, involves the replacement of Bridge No. 0109100 on MD 144 over Evitts Creek in Allegany County. The project replaces an existing three-span steel girder bridge with a new single-span steel girder bridge measuring 110 feet in length. This new structure will feature two 11-foot wide travel lanes and two variable-width, bicycle-compatible shoulders ranging from 6.5 to 8.5 feet. To maintain traffic during construction, eastbound traffic will be detoured while westbound traffic remains open. The scope of work extends beyond the bridge to include the installation of a grass swale along the US 220 ramp to I-68 West for stormwater management and the installation of utility support systems, pipes, and conduits for Columbia Gas and Lumen Technologies Inc. This project is federally funded under F.A.P. Number AC-STBG-G-1396(004)E and requires adherence to Title VI of the 1964 Civil Rights Act and Standard Federal Equal Employment Opportunity Construction Contract Specifications. Bids must be submitted electronically via Bid Express by January 14, 2027. For contracts exceeding 100,000 dollars, a bid security of at least five percent of the total bid is required, along with payment and performance bonds.

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details

More opportunities from Washington → Aviation Project Management Group

Same awarding agency

NAICS: 236210
New
SLED
2027 Airfield Project - Contract 1
Solicitation # MC-0322839
The 2027 Airfield Projects – Contract 1, managed by the Aviation Project Management Group for the Port of Seattle, focuses on the replacement and upgrade of critical infrastructure within the Runway 34L-16R complex and Taxiway T at the Seattle-Tacoma International Airport. The scope of work is divided into AIP Eligible (Bid Schedule A) and Non-AIP Eligible (Bid Schedule B) tasks, encompassing seventeen primary work areas. Key deliverables include the installation of new LED airfield lighting and upgraded Constant Current Regulators, the replacement of water mains and flush fire hydrant pits, the installation of access control infrastructure at an airfield gate, and the surfacing of maintenance roads with asphalt and crushed aggregate. All work must adhere to FAA lighting performance requirements and Port of Seattle standards. Administrative requirements mandate that bids be submitted electronically by December 16, 2026, including a bid guarantee of at least five percent of the total bid. The successful contractor must provide performance and payment bonds for the full contract sum and maintain insurance certificates. Compliance with the Buy American/America certification, 2010 ADA Standards, and Washington State prevailing wage laws is required. The project emphasizes small business outreach for Minority, Women, and Disadvantaged Business Enterprises (MWDBE). Quality control is the contractor's responsibility, while the Resident Project Representative (RPR) oversees inspection and final acceptance. Specific technical standards are enforced for material handling, including strict temperature and humidity controls for epoxy adhesives and detailed labeling requirements for electrical and communication cabling.
Industrial Building Construction

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
2027 Airfield Projects - Contract 2
Solicitation # MC-0322844
The 2027 Airfield Projects - Contract 2 (Solicitation MC-0322844) is a construction project managed by the Aviation Project Management Group for the Port of Seattle at the Seattle-Tacoma International Airport. The scope of work is divided into two primary schedules: Schedule A focuses on the removal and replacement of taxiway or apron pavement concrete panels using PCC or RapidSet high-early strength concrete, including airfield lighting and pavement marking replacements. Schedule B involves the removal of aircraft apron concrete pavements and the installation of new electrical and communication ductbanks, utility vaults, and restored pavement markings. Additional work includes airfield recircuiting to replace lighting circuits with low megger readings, installing LED fixtures and signs, replacing failing fire hydrant access hatches, and implementing wildlife hazard management through turf edge dam removal, anti-perching device installation, and storm drainage regrading. The project is scheduled to begin on April 1, 2027, and must be completed within 60 consecutive days, no later than June 1, 2027. The Port intends to award the contract to the lowest responsible bidder who meets specific registration, tax, and insurance requirements in Washington state. Bidders must submit an electronic bid including a bid guarantee of at least 5% of the total bid and a WMBE Commitment Plan Form, with an aspirational goal of 10% WMBE participation. The contractor is required to adhere to prevailing wage rates, provide performance and payment bonds, and follow strict hazardous material labeling and containment protocols. Payment is managed through the submission of Monthly Amounts Paid data and Electronic Payroll Information via the Port's CDS website.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS