Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kansas was posted on July 8, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Airport Runway Reconstruction - Engineering Services

Closed
2024-041State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project involves a comprehensive reconstruction of the runway 18-36 at the New Century AirCenter (IXD), which measures 7,339 feet in length and 150 feet in width. The existing runway, rehabilitated in 2005 with an asphalt mill and overlay, has deteriorated to a condition classified as fair, with a Pavement Condition Index of 54.9, indicating significant cracking and oxidation. The current assessment, supported by a recent KDOT study and FAA concurrence, mandates a full reconstruction of the entire runway, including associated hold lines and the Taxiway K connector within the runway safety area, due to their poor condition. The scope aims to restore the runway to a safe, operational state, addressing the random cracking and oxidation issues to ensure compliance with safety standards. The contract, titled "Airport Runway Reconstruction - Engineering Services," is posted by Johnson County, Kansas, with a solicitation number 2024-041. It is a large-scale project with an estimated value between 15 and 30 million dollars. The project response deadline is August 9, 2024, and the primary point of contact is Robin Lynes. The work will be performed in Kansas, and the contract emphasizes comprehensive engineering services necessary for the full reconstruction process. Additionally, unrelated to this project but included in the document summaries, there is a separate RFP issued by the City of Iowa City for Recycling Processing Services, which involves a five-year contract with renewal options, highlighting the diversity of procurement activities within the region.

General Info

Place of Performance

KS, USA

Set-Aside

NONE

Documents

6

2024-041 Airport Runway Reconstruction - Engineering Services RFP

PDF, High priority: read this firstrfp
High

Appendix A - Federal Terms and Conditions for Johnson County SLFRF Grant Agreement

PDF, High priority: read this first28 pages · contract-document
High

RFP 2024-041 Airport Runway Reconstruction Engineering Services

PDF, High priority: read this firstrfp
High

RFP 2024-041 Attachment A Insurance Requirements

PDF, High priority: read this firstinsurance-requirements
High

2024-041 New Century AirCenter KDOT Final PMP Report

PDF, Low prioritypavement-management-plan
Low

How to do Business with Johnson County and Supplier Response Quick Tutorial

PDF, Low priority21 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → Johnson County
Contacts1 person available
OfficeN/A
Organization / AgencyKansas → Johnson County
Office AddressN/A

Full Description

Show more
This project is a full reconstruction of runway 18-36 (7,339' x 150') at the New Century AirCenter (IXD) which was rehabilitated with an asphalt mill and overlay in 2005. The JCAC has performed crack sealing operations as needed since the completion of this project. The Kansas Department of Transportation (KDOT) has performed a Pavement Condition Index (PCI) study and the current score of the runway is 54.9 (See Attachment B, report may also be found at: https://powerpmdev.blob.core.windows.net/web/KDOT%20Reports/IXD%20-%20KDOT%20Final%20PMP%20Report%2020221121.pdf). This condition places the runway at the lower end of the fair condition. The runway exhibits random cracking and is heavily oxidized. Based on the recent observations and the KDOT study and FAA concurrence, RWY 18-36 must be fully reconstructed. The limits will include the entire runway and associated hold lines. The Taxiway K connector inside the runway safety area should be included due its poor condition.

More opportunities from Kansas → Johnson County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS