Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 29, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Al Qassim Simulator, Kingdom of Saudi Arabia

Closed
W912ER22R0028Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 9 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 9 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 9 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
ADA Improvements for Patterson Park and MPD
Solicitation # 1914.02
The City of Murfreesboro is soliciting sealed bids for solicitation number 1914.02, which entails construction upgrades for the Police Headquarters Vestibule and ADA improvements for the Patterson Park Recreation Center Entry. The project is based on AIA Documents A101 and A201 (2017) and requires the contractor to provide high-grade workmanship, including cutting, patching, and the restoration of disturbed structures. Bidders must be licensed General Contractors in the State of Tennessee and registered through the OpenGov procurement portal. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and any accepted alternates, with evaluation criteria focusing on experience, financial ability, reputation, and past work history with the owner. Submission requirements include a lump sum base bid, a 5% contingency allowance, and a bid security equal to 5% of the bid, which must be uploaded electronically and delivered physically to the Purchasing Department. The successful contractor must provide performance and payment bonds totaling 100% of the contract sum. Key deliverables include a construction schedule submitted within 21 days of award, various certificates of occupancy and inspection, and specific documentation such as AIA Forms G706, G706A, and G707. The contractor is responsible for quality control and must adhere to strict packaging and marking standards for hardware and wiring, as well as specific waste management and labeling protocols. Payment is processed via Applications for Payment, which must be accompanied by an updated Construction CPM Schedule and a schedule of values.
Facilities

POSTED

about 10 hours ago

DEADLINE

in 23 days

General Info

Contract Value

$13,148,233.7

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

VA, SAU

Set-Aside

NONE

Award Issued Date

Documents

25

2022-02-25_RTA_DP08_SA-457449-10_Qassim+Facilities_V1.pdf

PDF

2022-02-25_RTA_DP08_SA-457449-10_Qassim+Facilities_V2.pdf

PDF

2022-04-26_AM03_DP08_SA-457449-10_Al+Qassim+Facilities.pdf

PDF

497449+RSLFAC+DP8+PKG+5+Specifications+-+Al+Qassim.pdf

PDF

Amendment+W912ER22R00280001+Al+Qassim+Simulator.pdf

PDF

Amendment+W912ER22R00280002+Al+Qassim+Simulator.pdf

PDF

Amendment+W912ER22R00280003+Al+Qassim+Simulator.pdf

PDF

Attachment+10+-+Topographic+Survey+Report+Rev01+-+Al+Qassim.pdf

PDF

Attachment+11+-+Proposed+Field+Office+and+Laydown+Area_RSLFAC+Al+Qassim+Simulator.pdf

PDF

Attachment+1+-+Performance+Distribution+Statement.pdf

PDF

Attachment+2+-+Construction+Experience+Form.pdf

PDF

Attachment+3+-+Project+Overview+Sheet+Rev+1.pdf

PDF

Attachment+4+-+Project+Summary+Form.pdf

PDF

Attachment+5+-+Past+Performance+Questionnaire+-+PPQ.pdf

PDF

Attachment+6+-+Proposal+Price+Breakout+Schedule.pdf

PDF

Attachment+7+-+Anti-Collusion+Certification.pdf

PDF

Attachment+8+-+2021-09-23_RSLFAC+Phase+2A_Revised+Final+Geotech+Report_Al+Qassim.pdf

PDF

Attachment+9+-+2022-01-31_RSLFAC+Phase+2A_Supplementary+Geotechnical+Report_Al+Qassim.pdf

PDF

CDC+-+2022-02-11_RSLFAC+Phase+2A_DP8_Specifications.pdf

PDF

Conform+W912ER22R00280001+Al+Qassim+Simulator.pdf

PDF

Conform+W912ER22R00280002+Al+Qassim+Simulator.pdf

PDF

Conform+W912ER22R00280003+Al+Qassim+Simulator.pdf

PDF

Enclosure+A+-+Corporate+Certificate.pdf

PDF

Enclosure+B+-+Pre-Award_Contractor+Responsibility+Information.pdf

PDF

Solicitation+-+W912ER22R0028+Al+Qassim+Simulator.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Apr 22, 2022 to Apr 29, 2022. The notice description changed.

Notice updated

Response deadline changed from Apr 29, 2022 to May 6, 2022. The notice description changed.

Notice updated

Response deadline changed from May 6, 2022 to May 13, 2022. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W31R Endis Middle East
Contacts2 people available
OfficeWINCHESTER, VA, 22602-0000, USA
Office AddressWINCHESTER, VA, 22602-0000, USA
Contacts
MAJ Jonathan Space
Ms. Carla Echols

Full Description

Show more
Amendment 0003, 29 April 2022: The purpose of this amendment is to accomplish the following: 1. Section 00 01 10: Adjust solicitation page numbers accordingly to account for Amendment 0003 changes. 2. Section 00 01 10: Incorporate specifications 497449 RSLFAC DP8 PKG 5 Specifications - Al Qassim and drawings 2022-04-6_AM03_DP08_SA-457449-10_Al Qassim Facilities as a result of bidder inquiry communications. 3. Section 00 01 10: Incorporate 2021-09-23_RSLFAC Phase 2A_Revised Final Geotech Report_Al Qassim as Attachment 8 and 2022-01-31_RSLFAC Phase 2A_Supplementary Geotechnical Report_Al Qassim as Attachment 9. 4. Section 00 01 10: Incorporate Topographic Survey Report Rev01 - Al Qassim as Attachment 10. 5. Section 00 01 10: Incorporate Proposed Field Office and Laydown Area_RSLFAC Al Qassim Simulator as Attachment 11. 6. SF 1442 Block 13A: Extend the proposal due date and time from 6 May 2022, 10:00 AM Eastern Daylight Time (EDT) to 13 May 2022, 10:00 AM Eastern Daylight Time (EDT). 7. Section 00 72 00: Revise drawings and specifications listing under DFARS 252.236-7001 to include 497449 RSLFAC DP8 PKG 5 Specifications - Al Qassim and drawings 2022-04-26_AM03_DP08_SA-457449-10_Al Qassim Facilities. 8. Section 00 73 00: Remove exemption language for VAT from Section O. under Special Contract Requirements. 9. All other terms and conditions remain unchanged. Amendment 0002, 25 April 2022: The purpose of this amendment is to accomplish the following: 1. Section 00 01 10: Adjust solicitation page numbers accordingly to account for Amendment 0002 changes. 2. Section 00 01 10: Incorporate Attachment 3 - Project Overview Sheet Rev 1 under Appendix A, adding recency language - or is currently under construction and is at least 80% complete as of the solicitation issuance date. 3. SF1442 Block 13A: Extend the proposal due date and time from 29 April 2022, 10:00 AM Eastern Daylight Time (EDT) to 6 May 2022, 10:00AM Eastern Daylight Time (EDT). 4. Section 00 21 00: Incorporate Provision 252.215-7016, Notification to Offerors - Postward Debriefings 5. Section 00 21 16: Increase the page length from six (6) pages to ten (10) pages under subsection 5.2 for Factor 1: Corporate Capability. 6. Section 00 21 16: Change - recency timeframe language to - within six (6) years of the RFP issuance date from - within seven (7) years of the RFP issuance date" under subsection 5.8.1.i, subsection 5.9.1, and subsection 5.9.2 for Factor 4: Past Performance. 7. Section 00 21 16: Remove subcontractor language from subsection 9.1.c, requesting offerors to submit name, address, and DUNS number for any and all A-E subcontractors as A-E subcontractors are not required for this project. 8. All other terms and conditions remain unchanged. Amendment 0001, 30 March 2022: The purpose of this amendment is to accomplish the following: 1. SF1442, Block 13A: Extend the proposal due date and time from 22 April 2022, 10:00 AM Eastern Daylight Time (EST) to 29 April 2022, 10:00 AM Eastern Daylight Time (EST). 2. Section 00 21 00: Incoporate Site Visit information into provision 52.236-27 Alt I. 3. Section 00 21 16: Remove the "$3.5M requirement for Irrevocable Letter of Credit" from Tab D, Section 8.1.b. 4. Section 00 21 16: Clarify the Financial Questionnaire as a section of "Enclosure B" under Tab E, Section 9.1.d.iv. 5. Section 00 72 00: Change the bonding requirement under clause 52.228-15 for Payment Bonds from 10% to 20% and dollar amount from $1,000,000 to $2,000,000. 6. Section 00 73 00: Remove Bank Letter Guarantee language from Section N. "Requirements for Issuance of Notice to Proceed" of the Special Contract Requirements as Bank Letter Guarantees w ill not be accepted for this requirement. 7. All other terms and conditions remain unchanged. This is a Design-Bid-Build project requiring the contractor to construct a Simulator Building along with all supporting facilities including electric services, water, sewer, gas, paving, walks, curbs, gutters, drainage, site improvements, demolition, and information systems at the Royal Saudi Land Forces Air Command (RSLFAC) Aviation Institute at Al Qassim, Kingdom of Saudi Arabia. Magnitude of Construction: More than $10,000,000. (a) The Government reserves the right to incorporate the awardee proposal into the contract and distribute the proposal as deemed necessary. Any deviations from the proposal must be approved by the Contracting Officer; (b) The Contractor is required to provide all documentation requested in this solicitation (tender) to include Defense Base Act (DBA) Insurance after contract award and prior to Notice to Proceed. (c) Performance and Payment Bonds (20%) are required for this acquisition.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS