Alexander Street Resurfacing Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Riverside Transportation Department is implementing the Alexander Street Resurfacing Project, identified by Work Order D00064C and Task Code Z1530. The project involves resurfacing approximately 1.2 miles of Alexander Street, a two-lane secondary highway, from Cajalco Road to Markham Street in Mead Valley, California. The scope of work includes removing existing pavement, stabilizing the subgrade, and placing Hot Mix Asphalt concrete. To address flooding and infrastructure needs, the project will include the construction of a PCC dip section, drainage improvements in selected areas, the adjustment of surface utilities to grade, and the installation of safety edges and shoulder backing. Additional requirements include the reconstruction of driveways and mailboxes per USPS standards, re-application of pavement striping, installation of signs and signposts, and traffic light modifications at the Cajalco Road and Alexander Street intersection. The project will be executed within the existing roadway footprint, requiring no additional right-of-way or temporary construction easements. It is exempt from CEQA under Section 15301(c) as it involves the resurfacing of an existing road without expanding its use. Environmental compliance is mandatory under the Western Riverside Multi-Species Habitat Conservation Plan, requiring adherence to specific Best Management Practices. Key environmental protections include pre-construction presence/absence surveys for Burrowing Owls conducted by a qualified biologist within 30 days of ground disturbance and nesting bird surveys if vegetation removal occurs between February 1 and September 1. The project is managed by Environmental Project Manager Jan Bulinski and Senior Transportation Planner Don Copeland.

General Info

Riverside County will resurface 1.2 miles of Alexander Street with drainage and safety improvements.

Agency

California → Riverside County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Alexander Street Resurfacing Project Notice of Exemption June 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Jan BulinskiEnvironmental Project Manager

Full Description

Show more
The County of Riverside Transportation Department is proposing to resurface approximately 1.2 miles of Alexander Street from Cajalco Road to Markham Street. Alexander Street is classified as a secondary highway in the County of Riverside’s General Plan. Alexander Street is a two-lane road and currently ranges from 26-28 feet wide with asphalt concrete (AC) dike along various segments of the roadway. The proposed project will include removing the existing pavement, stabilizing the subgrade and placing Hot Mix Asphalt (HMA) concrete. A few segments of this project will be reconstructed to solve flooding issues within these areas. The proposed project will also include: • Resurfacing of roadway • Construct PCC dip section • Add AC/Conc driveway as needed • Adjusting all surface utilities to grade • Drainage improvements at selected areas • Re-Application of pavement striping • Removing and installing various signs and signposts as needed. • Reconstruct/construct AC/Conc driveway as needed • Reconstruction of existing mailboxes per USPS standards • Placement of safety edge and shoulder backing • Signal/Traffic light modification at Cajalco Road/Alexander Street intersection. No additional right-of-way or temporary construction easements (TCE) will be required to construct the proposed improvements. The project improvements will be within the existing footprint of the roadway and will raise the roadway profile. Work Order# D00064C Task Code #Z1530

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS